Loading...
HomeMy WebLinkAboutRes 8112RESOLUTION NO. 8112 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT (f I AUTHORISING THE PRESIDENT TO SIGN THE (9-1 CONSTRUCTION CONTRACT FOR WATER SYSTEM IMPROVEMENTS BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows. 1. The President of the Board is hereby authorized to sign, on behalf of the District, the 79-1 Construction Contract for water system improvements with Dana Knudsen Construction Inc. in the amount of $346,832. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a regular meeting held within said District on the 2nd day of February, 1981, by the following roll call vote: I AYES: Duffy, Kuttel, Maass and Huber. mJES: None. ABSENT: Sutton. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By &< ■ Roberta C. Huber, President ATTEST ~ Susan M. Craig, Deputy District Clerk I aac i/3/81 6112