HomeMy WebLinkAboutRes 8175i>
I
TFUCKFF ." '.".".'.v.; ' BLIC 'JTIl TTY . 1ST! ' T
the Cat
AYES:
I
(■ .'<'6s.--, 22 :/X) > A^? :--■. . 49*jtj«ji ,
db/v*- ,
.^S^/* • •
4
I
ANEMOMETER LOAN AGREEMENT
?
I
NAME OF PROJECT LEADER P. fifflgHg IU>!i, .;.■>„■ ■■:.'. .,v..-. ..j,.,.
ORGANIZATION rmiCKFF PONNHK iji-nr .",";'.;n' I'lr-rhi-r
ADDRESS
Street
. 0, Bos 308, fpua
City Ttate
PHONE {.':■.
DATE LOANED
DATE TO BE RETURNED DATE ACTUALLY RETURNED
LOCATION OF INSTRUMENT!S) 1.
Latitude/Longitude/Elevation"
2.
Latitude/Lohgitude/ETevation"
3.
Tamude/Longitude/TTevatidn
Zip
Lati tude/LOBfitufJt/ETevatlon
I
DESCRIPTION OF SITE(S)
raVi'd ".'■". Unit 5. Tnh',' /'.";>?>;>■ :hthdi,i>i.ti.o>l
Utmark Ma»f Pum> Station oite - Pgpoel nJn
% Unit 8, Tahoc Donner Subdi
LOAN HEMS SERIAL t
I
I
The California Energy Commission hereby provides the items listed above for your
use during the period beginning _ _ and ending
In regard to this agreement, the recipient of the loaned equipment shall
designate one individual as the project leader. The project leader personnally
and on behalf of the recipient shall agree to:
(1) Certify that the equipment is in first-class working condition.
(2) Be fully responsible for the equipment and indemnify the California
Energy Commission against any damage or loss while in control or
possession of the user, and "molee restitution upon demand by CEC should
ariy damage or loss occur.
(3) Practice due care in using said loaned equipment for public safety,
and defend, hold harmless, protect and indemnify the California Energy
Commission as owner from and against all claims or demands for
damages, including claims for property damage, personal injury, or
death resulting from equipment transportation or use or from acts on
the part of the recipient or recipient's employees while said equip-
ment Is in the control or possession of recipient.
(4) Assume all responsibility for installing, reading, dismantling and
returning the loaned instruments to the California Energy Commission.
(5) Collect and record wind data on a weekly basis.
(6) Provide the California Energy Commission with the wind resource data
on a monthly basis. A minimum of three to six months of wind
measurements will be required by the California Energy Commission to
estimate the long-term resource at a given site, depending on the
region and season in which data is taken. Normal data collection will
be for a period of one year.
(7) Assume full responsibility for establishing a wind fann development
plan.
(8) Return all equipment to the CEC or to a site determined by CEC and
agreeable to recipient.
The California Energy Commission shall:
(1) Loan the equipment to the recipient.
{?) Advise the recipient on where to install the loaned instruments.
(3) Provide technical and economic advice for the recipient's wind farm
development plan.
(4) Calculate the seasonal and annual average windspeed and estimate the
annual energy available based on data received from the recipient.
f.
I agree to the terms and conditions set forth in this agreement.
I 4^ jC*t*g£*f. ctceade Project
AdfieA.tX.> i ,
Recipient
er' *L '/
Date
Date
10/22/81
CtC Anemometer Loan
Program Coordinator
Date"
C£C Business Services
Certification
Date"
I
Either the Program Coordinator or the Project Leader can terminate measurements
at a given site with a 30-day written notice. If measurements at any site show
little potential, the California Energy Commission reserves the right to remove
the loaned instruments. Any changes to this agreement must be in writing and
approved by both parties.
I