HomeMy WebLinkAboutMeetingSPECIAL MEETING
November 13, 1981
The special meeting or the Board ■
Utility District was called to order by
triet Board room.
Directors of the Trucks
President Huber at 3i42
Dormer Public
.M. in the Dis-
I
I
I
ROLL CALL: Directors Kuttel, Maass md Huber were present. Director Corbett
arrived at 3:50 P.M.; Director Duffy arrive! it 4:15 P.M.
EMPLOYEES PRESENT: D. Eugene Holt and Susan Craig were present.
CONSULTANTS PRESENT: District Counsel Simon irrived at 3:47 P.M. Ken Peters
of James Hansen and Associates was present.
OTHERS PRESENT: Patti Ellison was present in the audience.
HYDROELECTRIC DEVELOPMENT - BOCA DAM - DISCUSSION AND POSSIBLE DIRECTION AND/OR
ACTION
Ken Peters presented the Board with a cost estimate tor a feasibility study
on both Boca and Prosser hydroelectric projects. The study on Boca alone would
cost $45,000 (which includes $5,000 for materials from the U. S. Bureau of Rec-
lamation); there would be an additional cost of $26,000 (including $2,500 for
materials from the USBR) to include Prosser in the feasibility study.
The benefits of having one entity develop all three projects (Boca, Prosser
and Stampede) and the water rights issue were discussed by the Board.
Director Maass moved, and Director Kuttel seconded, that .lames Hansen and
Associates be authorized to represent the District on all three dams for nego-
tiations with Sierra Pacific. ROLL CALL: Duffy, absent; all other Directors,
aye. SO MOVED.
It was noted that Hansen and Associates have already been authorized by
the Board to go forward with the feasibility study on the Boca hydroelectric
project. After some discussion, Director Maass moved that the District auth-
orize Hansen t>> pursue the Prosser feasibility study in an amount not to exceed
$3,900 - the tee of $2,500 for materials from the USBR will be paid directly
by the District. The Board will review the preliminary report in February and
made a determination as to whether or not to proceed. Director Corbett seconded
the motion. ROLL CALL: Duffy, absent; all other Directors, aye. SO MOVED.
WAPA POWER ALLOCATION - DISCUSSION AND POSSIBLE DIRECTION AND/OR ACTION
It was noted that it had been decided at a meeting between Ken Peters,
President Huber and Director Corbett that General Manager Holt be designated
negotiator in the allocation proceedings. Counsel Simon - attorney protecting
the District's interests, and Hansen and Associates will perform the technical
work.
The need for agreement between the WAPA, PG&E, SPPCo and the District was
discussed. Mr. Peters advised that David Coleman of the Western Area Power
Administration would like to negotiate the entire matter and make one contract
with the PUD. Two pertinent clauses in the present WAPA wheeling contract will
have to be settled - presently, Western in required to give PG&E five years
notice of new service, and also WAPA has to assure PG ,E that any new customer
iiis a supplemental power supply.
Hansen and Associates' cost estimate for securing the 11location 11 »m the
Western Area Power Administration was reviewed. Thereafter, Director Ma ess
moved that the Board authorize Hansen, Counsel Simon and Manager Holt to pursue
any and all negotiations to secure the 2 mw of power illocited to the District,
and that the Board be kept posted on the pi ■ n •■ - md expenditures. It was
noted that negotiat ions should be concluded by mid-.J muary. The matter is to
be placed on each meeting agenda m the -. • that direction iti.i/ui action is
required. Directoi Kuttel seconded the Motion. ROLL CALL: Duffy, absent;
all other Directors, IVe, SO MOVED.
Director Duffy arrived at thi.-
ll/U/bl pg. 1
REVIEW AND POSSIBLE DIRECTION RE EAST TRUCKEE PLANNING UNIT FACILITIES PLAN
This matter wan tabled to the November luth regular meeting since District
Engineer Cook was not present.
ANEMOMETER LOAN PROGRAM
Note was made of the press meeting being held in Sacramento on November
23rd relative to the CEC anemometer loan program. District representatives
have been invited; Directors Huber, Kuttel and Corbett will be attending. A
special meeting is to be called.
WATER RIGHTS - TRUCKEE AND CARSON RIVERS
I
President Huber advised a meeting for discussion of the negotiated settle-
ment of lawsuits concerning the waters of the Truckee and Carson Rivers will be
held November 17th at 9:00 in Reno. Director Corbett and Manager Holt were
authorized to attend on behalf of the District.
BOCA AND PROSSER
Ken Peters advised that the Paiute Indians' claim against the District re
development of Boca and Prosser hydroelectric projects has been dismissed.
SPPCo RATE INCREASE
District Manager Holt advised he has reviewed a resume of a rate consultant
that lie feels should be authorized to work with Martin McDonough in the upcoming
rite increase expected to be filed by Sierra Pacific. The Board indicated Mr.
McDonough should select the consultant he feels most comfortable with.
ADJOURNMENT
There being no further business before the Board, Director Maass moved
that the meeting be adjourned. Director Duffy seconded the motion. The
meeting was adjourned it 4l25 P.M. by consensus. I
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By J/-'V>^L-, U lr*^i^ .
JaAnes A. Maass, President
Jfr. '**—^
Strsan M. Craig, Deputy District Clerk
I
11/13/81 pg. 2