HomeMy WebLinkAboutOrd 8203fy
ORDINANCE NO. 8203
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
I
I
RESCINDING RESOLUTION NO. 7709 AND
ESTABLISHING ELECTRIC CONNECTION AND FACILITIES FEES
WHEREAS, the cost of providing electric facilities has increased sharply
during the past several years;
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
1. Effective with the effective date of this Ordinance, all
prior resolutions and ordinances pertaining to Electric De-
partment connection and facilities fees are rescinded and of
no further force and effect.
2. That Exhibit "A", Electric Connection and Facilities
Fees, a copy of which is attached hereto, is hereby adopted.
3. The effective date of the Connection and Facilities Fees
Schedule shall be /fi/f^fJ} /£ 1982.
4. The Clerk of the District shall immediately cause a copy
of this ordinance to be published once in the local newspaper
and copies shall be posted in at least three public places
within the District
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public
Utility District at a regular meeting thereof duly called and held within said
District on the /£&t day of /^^JUJs?/!.}/ / 1982, by the following roll call
vote:
NOES: /fr^f , •
.< /22sa&e4L- #$***■*■ •
ABSENT: ^j^g£j
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
(X'^YK+^r-
ATTEST:
f S# Si. £- Susan M. Craig, Deputy District Clerk
smc
1/28/82
Exhibit "A"
ELECTRIC CONNECTION AND FACILITIES FEE SCHEDULE
at
I
Availability
Service hereunder is available throughout the District's service area.
Applicability
The Charges hereunder are applicable to all applicants for service at locations
not previously served by the District.
Rate
The initial charge for service to applicants under the District's electric tariff
shall consist of a connection fee and, if applicable, a facilities fee as follows:
Size of Service Connection Fee Facilities Fee
1 0 Residential Service
3-wire OVERHEAD $450.00 $200.00
1 0 Residential Service
3-wire UNDERGROUND $500.00 $200.00
I
3 0 208, 240 or 480V
4-wire OVERHEAD
3 0 208, 240 or 480V
4-wire UNDERGROUND
$600.00
$650.00
kw
Demand x $80
kw
Demand x $80
The service required in all sizes includes 200 feet (overhead)and 100 feet (under-
ground) of wire, an overhead or pad mount standard voltage transformer, and one
meter. If additional meters are required, they shall be billed a set up fee plus
the actual cost of the meters.
Any needed extensions of the service wire for mure than the footage allowance
will be billed on the basis of actual cost of the wire.
smc
2/16/82
Exhibit "A"
f
I STATE OP CALIFORNIA )
)
COUNTY OK NEVADA
I
The undersigned, Susan M. Craig, under penalty of perjury, certifies
as follows)
That for and on behalf of the Clerk of the Truckce Donner Public Utility
District, I caused copies of Ordinance No. J^/f£>J? , adopted by the Board
ol Directors of said District on *•*//£ /s*Z~ > to De posted within
thirty days following adoption in four placer, within said District, to wit:
1. Nevada County Government Center
2. Nevada County Library, Truckoe Branch
i. United .'Hates Postal Service Office
•1. Truckee Donner Public Utility District
Said posting warn completed on "^**^', V^J- _ • Executed on the
Susan M. Craig, Deputy trict Clerk
I