Loading...
HomeMy WebLinkAboutManagers ReportTruckee Donner Public Utility District Post Office Box 309 • 11570 Donner Pass Rons) • Truckee, California 95734 (916) 587-3896 MANAGER'S REPORT March 1, 1982 I 1. Previous Report Items - 2/16/82 Met with Ken Peters; and Bob Barta on February 2^ system base maps on file and line diagrams; disc acities and present record-keeping on inventory. 1982. Reviewed electrical ssed present computer cap- 2 Solar Demonstration The outline specifications for domestic hot water systems prepared by Richard Racich was received today. Reversion to Acr i to Acreage - McDonald's project Director Hubor and I attended the Nevada County Review Board hearing on the reversion to acreage Here again, th cerns on the project impacts on our I advised of tl : asked f- le TDPUD' title r sport an .jur property in rder to properly identii asuments, to support right- of-way acreage d easement reqvte tps are filed. to Nevada COUnt\ the t rial reversion to I 4. Change Order No. 1 - Martis Valley Subst i' i a: Tile paperwork has beer, received and reviewed, and jard President's signature which 1 . Development Priccssing approved at the last Board meeting. OTHER ACTIVITI A review is under way of the present procedures fos processing of requests to the District Eor water and electric service. 2. Martis Valley Feeders Have received ami reviewed drawings from R. W. Beck; plans are being checked. Will receive final drawings first week in March. 3. Martis Valley Substation Received revised plans for Contract Change Order No. 2 (modification of steel structure to hold 115kV disconnect switches); they are presently being checked. JMW/smc