HomeMy WebLinkAboutMeeting MinI
SPECIAL MEETING
March 22, 1982
The special meeting of the Board of Directors of the Truckee Donner Public
Utility District was called to order by President Maass at 7:32 P.M. in the
TDPUD Board room.
ROLL CALL: Directors Huber, Monson and Maass were present at the start of the
meeting. Director Corbett arrived at 7:36 P.M.; Director Kuttel, at 7:38 P.M.
EMPLOYEES PRESENT: James M. Ward and Susan Craig were present.
CONSULTANTS PRESENT: Substitute Counsel James Porter of Wood, Porter, Simon
and Graham arrived at 7:36 P.M. District Engineer Cook was present.
OTHERS PRESENT: There were no others present.
CONSIDERATION OF ELECTRIC AND WATER BUDGETS FOR 1982
A copy of the proposed budget has been attached to the minutes for reference.
The Board and Assistant Manager Ward reviewed the Water Utility expenses,
and Mr. Ward answered questions regarding supervision and engineering costs and
pumping expenses and equipment costs. The anticipated maintenance projects for
the Water Department were reviewed - Mr. Cook advised that replacement of pumps
at Innsbruck and Donner Trails has been completed, and payment will be made from
Dart restricted funds. He also noted that replacement of the 6" steel line,
Route 89 North to Reynolds Way is eligible for inclusion in Project 79-1; ap-
proximately $8,900 remains on deposit at this time with the Farmers Home Ad-
ministration.
I
Capital improvements for the Water Department and, in particular, expenses
anticipated for telemetry, pump controls - rewiring, and reconstruction of the
Old Town water system were discussed. With respect to pipe thawing equipment,
Directors Kuttel and Monson objected due to related dangers and liability prob-
lems.
Vehicle maintenance and capital improvements were briefly discussed.
Water Utility function - salaries, benefits, operating and maintenance expenses,
maintenance expenses, maintenance projects proposed to be performed by Cook As-
sociates and capital improvements - were reviewed. Mr. Ward noted he would re-
Vise the maintenance projects and capital improvements in accordance with Board
discussion.
I
With regard to the estimated Water Department revenue, no provision was
made for a rate increase during 1982. Mr. Ward suggested a two-year budget
frame, and consideration of a rate increase in 1983. Passing on the energy
cost of operating the water system was suggested and discussed as well as
future metering of the system. Director Huber noted that hydrant maintenance
revenue should be adjusted to reflect revenue for a full year.
Electric Utility functions and expenses were briefly discussed, and Mr.
Ward noted he would provide a detailed report at the April 5th meeting with
respect to proposed overhead line expense and transformer maintenance. The
Board reviewed Electric Department capital improvements. With regard to the
Prosser Lakeview line upgrade, the Assistant Manager suggested a joint project
with Pacific Telephone and related discussion ensued.
Under estimated Electric Department revenue, the Board agreed that a
figure for interdepartmental sales should be shown as Electric revenue as
well as a Water Department expense. The accuracy of the standby revenue fig-
ure was questioned.
The Board was m agreement that the Directors' salaries should be adjust-
ed to the actual amount, as it does not anticipate increasing compensation
during 1983.
General administrative, customer relations, accounting functions, Ware-
house/Meter Department functions, Engineering functions, and related expenses
briefly discussed.
J/22/82 pg. 1
Mr. Ward indicated a revised budget and summation sheets would be pre-
pared for Board review and consideration at the April 5th meetinq.
District Engineer Cook recommended several items be added into the
budget - cathodic protection as provided for in the 1979 Dart Agreement,
more effective use of Wells A and B (using the $40 per lot funds), telemetry
training, and development agreement expenses and income.
CLOSED SESSION
President Maass adjourned the meeting to closed session at 9:45 P.M.
RETURN TO PUBLIC SESSION
The meeting was returned to public session at 10:37 P.M. The Chairman
advised that legal and personnel matters were discussed during closed ses-
sion.
MANAGEMENT SALARY ADJUSTMENT
Director Kuttel moved, and Director Monson seconded, that the Board
adopt Resolution No. 8217 rescinding Resolution No. 8215 and establishing
the salary of the Executive Secretary at $24,323.85 annually. Payment in
the amount of $50 is to be made for each regular Board meeting attended.
ROLL CALL: all Directors, aye. SO MOVED.
ADJOURNMENT
The meeting was adjourned at 10:40 P.M.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
I
By jUw-L-r jf- f !«. irk-
James A. Maass, President I
.v -'.«. S=sa
Susan M. Craig, Deputy Di,';t*Iet Clerk
I
3/22/8,2 pq. 2