HomeMy WebLinkAboutManagers ReportTruckee Donner Public Utility District Post Office Box 309 • 11570 Donner Pass Road • Truckee. California 95734 (916) 587-3896 MANAGER'S REPORT ■ 982 I UNFINISHED BUSINESS WAPA Power Allocation - Statue Report Discussions are proceeding betwet n SPPCo and WAPA, and the TPruD and WAPA. Assistance in this effort to bring power m line is being provided by Joe Rail of the Denver office. It '..-' tentatively scheduled for us to meet with WAPA during the first \deek of Julyi preliminary contract negotiations between SPPCo and WAPA by mid-August, and pouter to the TDPUD by late September. Boca/Prosser Hydroelectric' Projects - Status Report There is nothing new to report respecting the Haute protest, 1 expect an answer from the Tribal Council's attorney, Mr. Thorpe, eometink luring the first part of July, and will report to the Board when the reap nee la re- I ""'_'■'_ Valley Substation - Statue Report {Please see copy >f the financial report attached) The substation work is preset I y "' schedule. Pint oleted Friday, June 18th, and Barker i Marker .■■ ml juipment pads today, June Slet. Some difficulty % ''.,' I ■ eubgradei the soils report (which I hat The decision was made not to excavate the feme ■he elevations, fill .'per the excavated area t raise the pad elevation with !■'" minus matt rie day with the compact ion test exceeding 95% ret ias Well Field - Suaanville Although I have asked Bob Webber to prove the capacity of the gas wells he has advertised to us for sale, he is rather hesitant to do so. I have advised him the District cannot proceed until we knew what volume to expect from the fields The issue may be tabled until the requested, information is reoei •■ ;' from Mr. Webber. Consideration of development agreement with Hilltop/Kohler No cortment. indicated a 60/50 is more like 10/00 (rock). lor te e urplus of boulders. •r ->■' - h e pad, but to raise 3" minu s materials, and . xts ■ vnpleted Fri- tompa • ■ : ■ . -1- A & I Manager's Report June 21, 1982 Page 2 Consideration of resolut ion declaring district intent to annex four parcel.- of real property in Hart io- Valley (Latrell Crosby) '. suggest we wait until the July • ,.•.• ,;_. ;■;• v •.•■•••; '•. ■;•,■ dra'"t i\ date, and we should have a chanoi )THER BUSINESS Mortis Woods (Davis) Granitt ■' miitruei i n 'ompany beginning foundations are to be r ured ,; ■'.■ * ; ■ Engineer's ••■>■■' estimate I • advise Ponderosa Palisades Duplexes (Buerly) ing to oonsider the annexation of these the aonditione set forth by the Dio- tion. Jim Simon should be book by thai finalize the resolution. stallmeni >/ improvements today - ■ -■!.',• ieiati .'. The elevated tank 1 have requested figures from Cook 'is of the checking deposit requiret • ■■ formed PERSONNEL systi ■•; ,' t H 18 ■-■ < has teen } temporary 'in: qui ' bash ■'. w, and ' h,: today, June n - t lie final water pressuri I •i .'•'?' paying maintenance '. Mario Chavez has been hired as s temporary Clerk. ,;. Honey Watei-s has been designated the new Computer Clerk. 1. henna Hossack has been placed In the Engineering Clerk position. b. A meet and 1 23rd with the Ii ■ion has been scheduled for 9:00 A.M. Wednesday, ■ 'urn a) Temporary classifications b) Apprenticeship lineman a) Engineer Tech I position d) Grievance procedures e) other matters. EQUIPMENT Bruce Grow has been authorised to begin the process of preparing bids for small trucks to replace the unite in the Meter Department. ;:<''••:• ( for a summer maintenance program on the pump houses and water storage tanks has been set up - 1) small spray rig, 2) small hand tools - ladder, etc. JMS/smc lartis Vallev Substation ita <eport ' '. 1982 I I Costs Incurred: R.W. Beck; & Assoc. Cook Associates Steve Grumer, Atty. He a*, Porter, Simon K Sierra Pacific Power Materials Mi >c. Totals Paid to Date 12-78/12-81 $131,607.11 16,792.19 67.9 1-81/5-82 S14.295.71 665.06 66.50 Total Sl45.902.82 17,457.25 48.00 66.50 67,939.15 327,681.51 485_.Ji : '.580,90 II Source of Funds: Fxcess Funds - RFA Deposit Fxcess Funds - DL Deposit Fxcess Funds - Dl DODOS it (Loan paid off) S.P.P.C, Refund (includi interest earned) S.P.P.C. Refunds 'ansfer I row Genera 1-82/6-82 ; ■ ■ 1 ib tat ion i uni 1 Funds $ 26,577.83 21,624.36 20,804.08 132,498.09 13,258.56 47,818.79 20,758.03 190,000.01 $173,339.74 I ex| end ■ i 1 ! ' r I ,tat been si I been pa id out of v:11 be issued monthly f unds. In arldi H on , e tii" General fund ■ Bills for Boai d Approval.