MANAGER'S REPORT
■ 982
I UNFINISHED BUSINESS
WAPA Power Allocation - Statue Report
Discussions are proceeding betwet n SPPCo and WAPA, and the TPruD and WAPA.
Assistance in this effort to bring power m line is being provided by Joe
Rail of the Denver office. It '..-' tentatively scheduled for us to meet with
WAPA during the first \deek of Julyi preliminary contract negotiations between
SPPCo and WAPA by mid-August, and pouter to the TDPUD by late September.
Boca/Prosser Hydroelectric' Projects - Status Report
There is nothing new to report respecting the Haute protest, 1 expect an
answer from the Tribal Council's attorney, Mr. Thorpe, eometink luring the
first part of July, and will report to the Board when the reap nee la re-
I
""'_'■'_ Valley Substation - Statue Report
{Please see copy >f the financial report attached)
The substation work is preset I y "' schedule. Pint
oleted Friday, June 18th, and Barker i Marker .■■ ml
juipment pads today, June Slet. Some difficulty %
''.,' I ■ eubgradei the soils report (which I hat
The decision was made not to excavate the feme ■he elevations, fill .'per the excavated area t
raise the pad elevation with !■'" minus matt rie
day with the compact ion test exceeding 95% ret
ias Well Field - Suaanville
Although I have asked Bob Webber to prove the capacity of the gas wells he has
advertised to us for sale, he is rather hesitant to do so. I have advised him
the District cannot proceed until we knew what volume to expect from the fields
The issue may be tabled until the requested, information is reoei •■ ;' from Mr.
Webber.
Consideration of development agreement with Hilltop/Kohler
No cortment.
indicated a 60/50
is more like 10/00 (rock).
lor te e urplus of boulders.
•r ->■' - h e pad, but to raise
3" minu s materials, and
. xts ■ vnpleted Fri-
tompa • ■ : ■ .
-1-
A &
I
Manager's Report
June 21, 1982
Page 2
Consideration of resolut ion declaring district intent to annex four parcel.-
of real property in Hart io- Valley (Latrell Crosby)
'. suggest we wait until the July
• ,.•.• ,;_. ;■;• v •.•■•••; '•. ■;•,■ dra'"t i\
date, and we should have a chanoi
)THER BUSINESS
Mortis Woods (Davis)
Granitt ■' miitruei i n 'ompany beginning
foundations are to be r ured ,; ■'.■ * ;
■ Engineer's ••■>■■' estimate I • advise
Ponderosa Palisades Duplexes (Buerly)
ing to oonsider the annexation of these
the aonditione set forth by the Dio-
tion. Jim Simon should be book by thai
finalize the resolution.
stallmeni >/ improvements today - ■ -■!.',• ieiati .'. The elevated tank
1 have requested figures from Cook
'is of the checking deposit requiret
• ■■ formed
PERSONNEL
systi ■•; ,'
t H 18 ■-■ <
has teen }
temporary
'in: qui '
bash ■'.
w, and ' h,:
today, June n - t lie final water pressuri
I
•i .'•'?' paying
maintenance
'. Mario Chavez has been hired as s temporary Clerk.
,;. Honey Watei-s has been designated the new Computer Clerk.
1. henna Hossack has been placed In the Engineering Clerk position.
b. A meet and 1
23rd with the Ii
■ion has been scheduled for 9:00 A.M. Wednesday, ■ 'urn
a) Temporary classifications
b) Apprenticeship lineman
a) Engineer Tech I position
d) Grievance procedures
e) other matters.
EQUIPMENT
Bruce Grow has been authorised to begin the process of preparing bids for
small trucks to replace the unite in the Meter Department.
;:<''••:• ( for a summer maintenance program on the pump houses and water storage
tanks has been set up - 1) small spray rig, 2) small hand tools - ladder, etc.
JMS/smc
lartis Vallev Substation ita <eport ' '. 1982
I
I Costs Incurred:
R.W. Beck; & Assoc.
Cook Associates
Steve Grumer, Atty.
He a*, Porter, Simon K
Sierra Pacific Power
Materials
Mi >c.
Totals Paid to Date
12-78/12-81
$131,607.11
16,792.19
67.9
1-81/5-82
S14.295.71
665.06
66.50
Total
Sl45.902.82
17,457.25
48.00
66.50
67,939.15
327,681.51
485_.Ji
: '.580,90
II Source of Funds:
Fxcess Funds - RFA Deposit
Fxcess Funds - DL Deposit
Fxcess Funds - Dl DODOS it
(Loan paid off)
S.P.P.C, Refund (includi
interest earned)
S.P.P.C. Refunds
'ansfer I row Genera
1-82/6-82 ;
■ ■ 1 ib tat ion i uni
1 Funds
$ 26,577.83
21,624.36
20,804.08
132,498.09
13,258.56
47,818.79
20,758.03
190,000.01
$173,339.74
I ex| end
■ i 1 ! ' r I
,tat been
si I been pa id out of
v:11 be issued monthly
f unds. In arldi H on ,
e tii" General fund
■ Bills for Boai d Approval.