Loading...
HomeMy WebLinkAbout12, Ponderosa Palisades Block Building ACTION BuildingHydro Pump Station Concrete Block Construction of the Ponderosa Palisades Consideration to Award a Contract for the BuildingHydro Pump Station Concrete Block Construction of the Ponderosa Palisades Consideration to Award a Contract for the May 3,2017 ITEM #12 Consideration to Award Contract for the Construction of Block Building require the construction of a new facilityand has determined it has reached the end of its useful life and will Staff has assessed the condition and reliability of the pump station •to meet changing requirements44 yearsThe station has been modified many times over the course of the past •small wood framed structurepneumatic system within a -The original facility housed a 60Hp hydro•elevations of the Ponderosa Palisades subdivisionto provide domestic water pressure and fire flow to the upper in 1972Ponderosa Palisades Hydropneumatic Pump Station was constructed •BACKGROUND / HISTORY Consideration to Award Contract for the Construction of Block Building NEW INFORMATION two bids were receivedOn April 25, 2017 the District held a public bid opening at which point •the Ponderosa Palisades Block Building Construction 2017On April 4, 2017 the District publicly advertised a request for bids for •pneumatic pump system and electrical switchgear assembly-hydroconstruction of a new concrete block pump station to house the new District Staff has developed a design and specification for the •Consideration to Award Contract for the Construction of Block BuildingConsideration to Award Contract for the Construction of Block Building NEW INFORMATION No$28,750Incline Village, NVKL Masonry, Inc.Yes$16,250Truckee, CAMoore MasonryBrianResponsiveTotal BidAddressContractor of $16,250lowest responsive bidder to be Brian Moore Masonry, in the amount Following the review of the received bids, staff has determined the •A list of the received bids has been provided in the table below:•Consideration to Award Contract for the Construction of Block BuildingConsideration to Award Contract for the Construction of Block Building FISCAL IMPACT FY17 Budget Water General FundSufficient funds exist for this procurement in the Board approved •Consideration to Award Contract for the Construction of Block BuildingConsideration to Award Contract for the Construction of Block Building RECOMMENDATION$17,875$16,250, plus a 10% contingency, for a total amount not to exceed Building Construction 2017 to Brian Moore Masonry, in the amount of a construction contract for the Ponderosa Palisades Block Award •Consideration to Award Contract for the Construction of Block BuildingConsideration to Award Contract for the Construction of Block Building