Loading...
HomeMy WebLinkAbout9, Spring Street Board workshop Workshop Item # 9 April 2, 2014 Rehabilitation projectSpring Street Pipeline Discussion of the Discussion of the Spring Street 2 and have exceeded their useful lifeinch diameter and smaller) -Pipes that are old, undersized (typically 4–Pipes in poor condition requiring repeated repairs–pipelines in two categories:The Water Department has a need to replace existing •Background / History Pipeline Rehabilitation Project New Information Pipeline Rehabilitation ProjectDiscussion of the Spring Street 3 2016: Streetscape, parking and paving on along Donner Pass Road–2015: Utility undergrounding along Donner Pass Road–2014: 10120 Jibboom Street to 10178 Donner Pass Road–Three phases•Paved parking –Realignment of Donner Pass Road–Pedestrian plaza–Undergrounding of overhead utilities–10120 Jibboom Street to traffic roundabout at McIver Crossing–Streetscape Project”Brickeltown“–Truckee improvement projectTown of • New Information Pipeline Rehabilitation ProjectDiscussion of the Spring Street 4 Categorically exempt under CEQA–Replace remaining service lateral–Slipline existing 10” pipe with new 6” pipe–Planned 2014 Project•Two of the three service laterals were replaced in 1993–Number of leak repairs–Keiser Avenue is in poor conditionPipeline on Spring Street between Jibboom Street and • New Information Pipeline Rehabilitation ProjectDiscussion of the Spring Street 5 Too late for project schedule–May 21, 2014 ––April 16, 2014 –Scheduled Board meetings:•June 2014–Construction –May 2014–Bid Opening & Award –April 2014–Advertising for Bids –2014 Project Schedule• New Information Pipeline Rehabilitation ProjectDiscussion of the Spring Street 6 Coordinated with undergrounding of utilities–Remainder to be replaced in 2015–Some service laterals have been replaced since then–Service laterals not replaced at that time–Main replaced in 1985–Donner Pass Road• Fiscal Impact Pipeline Rehabilitation ProjectDiscussion of the Spring Street 7 Planned funding source is Water Department Capital •Surveying and environmental services not needed–Geotechnical testing included in cost proposal from Holdredge & Kull–Estimated cost of $50,000 for construction contract • Recommendation Pipeline Rehabilitation ProjectDiscussion of the Spring Street 8 Receive this report and provide comment•