APPENDIX E
ELECTRIC CONNECTION & FEE SCHEDULE
Size and Type of Service Fee
Single Phase, 120/240 Service – 200 amp
$1,248
1) Permanent connection to structure
2) Temporary connection to customer-owned power pole and
$1,534
subsequent transfer to structure
Single Phase, 120/240 Service – 400 amp
1) Permanent connection to structure
$2,364
2) Temporary connection to customer-owned power pole;
$2,649
removal of same and installation of underground permanent
service to structure
Three phase, 208v, 240v or 480v service
1) Permanent connection to structure
Actual Cost
2) Temporary single phase 120/240 service for construction
Actual Cost
purposes to become three-phase permanent service to
structure
Overhead to Underground upgrade or relocate, up to 200 amp panel $1,248
Overhead Relocation $467
400 amp upgrade $1,854
Underground Relocation up to 200 amp $1,248
Underground Relocation 400 amp $2,364
Temporary overhead service $1,248
Overhead to Underground upgrade or relocate, up to 200 amp panel,
$1,534
with TPP (Temp to Permanent Installation)
(Ord 2006-01, 2008-02)
1