Loading...
HomeMy WebLinkAboutAppendix E, Electric Connection and Fee Scgedule 6-2-2010 APPENDIX E ELECTRIC CONNECTION & FEE SCHEDULE Size and Type of Service Fee Single Phase, 120/240 Service – 200 amp $1,248 1) Permanent connection to structure 2) Temporary connection to customer-owned power pole and $1,534 subsequent transfer to structure Single Phase, 120/240 Service – 400 amp 1) Permanent connection to structure $2,364 2) Temporary connection to customer-owned power pole; $2,649 removal of same and installation of underground permanent service to structure Three phase, 208v, 240v or 480v service 1) Permanent connection to structure Actual Cost 2) Temporary single phase 120/240 service for construction Actual Cost purposes to become three-phase permanent service to structure Overhead to Underground upgrade or relocate, up to 200 amp panel $1,248 Overhead Relocation $467 400 amp upgrade $1,854 Underground Relocation up to 200 amp $1,248 Underground Relocation 400 amp $2,364 Temporary overhead service $1,248 Overhead to Underground upgrade or relocate, up to 200 amp panel, $1,534 with TPP (Temp to Permanent Installation) (Ord 2006-01, 2008-02) 1