Loading...
HomeMy WebLinkAbout8, Consideration of the Replacement Purchase of Meter Test Bench Consent Item # July 16, 2014 Purchase of a Meter Test BenchConsideration of the Replacement 8 Consideration of the Replacement Purchase 2 Software for the MTB computer is no longer available–MTB computer has crashed and cannot be repaired–20 years old–functional:-Existing MTB is obsolete and non•installed throughout the Districtmaintain, and verify the accuracy of electric revenue meters The District uses a Meter Test Bench (MTB) to test, •Background / Historyof a Meter Test Bench Consideration of the Replacement Purchase 3 WECO products meet all the District’s test system needs–WECO products do not have the above limitations –phase meter tests-products do not conduct true threeMegger–the Districtproducts do not support all the meter types in use by Megger–manufacturers revealed the following:An evaluation of MTB products by each of the •manufacturers of MTB equipmentbased -are the only two USMeggerWECO and •New Informationof a Meter Test Bench Consideration of the Replacement Purchase 4 Quote total is $41,688–site training-One day on–Model 2350 Meter Test Bench–the needs of the District with details as follows:The WECO quote provides an MTB system that fully meets •manufacturersThe District received and evaluated quotes from both •New Informationof a Meter Test Bench Fiscal Impactof a Meter Test BenchConsideration of the Replacement Purchase 5 Sufficient funds exist in FY14 Capital Budget• RecommendationPurchase of a Meter Test BenchConsideration of the Replacement 6 order contingency, for an amount not to exceed $45,857from WECO for the amount of $41,688, plus a 10% change Approve the purchase of a replacement meter test bench •