Loading...
HomeMy WebLinkAbout15,WAPA CVP Base Resource reassignment to Plumas Action Item June 4, 2014 To Plumas Sierra RECWAPA CVP Base Resource from NCPA Assignment of-Consideration of a Re# 15 Consideration of Re 2 Truckee Donner is made whole by UAMPS― and NCPALetter agreement of September 1, 2004 between Truckee Donner ― the NCPA PoolThis large hydro generation is scheduled and sold through •our WAPA CVP Base Resource (BR) to NCPATruckee Donner PUD and the City of Fallon currently assign •Background / History WAPA BR to Plumas Sierra RECAssignment of - New Information WAPA BR to Plumas Sierra REC-Consideration of Re 3 in the future Donner and Fallon assignment will keep the Base Resource available to Truckee -reThis •Donner and FallonUAMPS to schedule and ensure MWh’s will then be scheduled to Truckee ― Truckee Donner, City of Fallon and Plumas Sierra create a pooling ― WAPA assigns this BR to Plumas Sierra― WAPA terminating the BR assignment between Truckee Donner and NCPA― To implement this change:•scheduling services for Truckee DonnerStarting July 1, 2014, UAMPS will be doing all the • Fiscal Impact WAPA BR to Plumas Sierra RECAssignment of -Consideration of Re 4 Cost to Truckee Donner is approximately $25,000 annually•Donner approximately $65,000 annuallyScheduling change from NCPA to UAMPS will save Truckee •Truckee Donner and Fallon BR varies in value annually • Recommendation WAPA BR to Plumas Sierra RECAssignment of -Consideration of Re 5 from Truckee Representative Manager, UAMPS the Assistant General (authorize UAMPS Pooling Appendix c)WAPA Assignment to Plumas Sierra b)WAPA Termination Assignment to NCPA a)to District counsel Authorize the Board President to sign in a form acceptable •