Loading...
HomeMy WebLinkAboutCandidate briefing-Electric Dept,8-11-2014 TDPUD Board of Directors 1 DEPARTMENTELECTRIC Candidate Briefing Purchased Power Candidate BriefingTDPUD Board of Directors 2 Renewables will be approximately 40% by 2014–Resource mix currently 27% renewable resources–) TargetRPSRenewable Portfolio Standard (•From NV Energy Control Area (and beyond)–Transmission•California–Idaho–Utah–power portfolioMost of generation consists of contracts within the purchased –Generation• Purchased Power (cont)Candidate BriefingTDPUD Board of Directors 3 Horse Butte Wind Project–Landfill Gas Generation–UAMPS Wind Renewable Energy Credits (REC’s)–Pleasant Valley Wind Project–Market purchases–Western Central Valley Power hydro–Nebo natural gas generation–Stampede hydroelectric–Existing resources are:•Challenge is to balance the portfolio–TDPUD has developed a comprehensive Power Supply Plan–Generation/Power Supply• Purchased Power (cont)Candidate BriefingTDPUD Board of Directors 4 Meet state and federal regulation and future legislation•Price Volatility-Resource Diversity-Cost-Renewable Resources-Contract Duration-Conservation-Future Portfolio (2010 and beyond) is intended to balance:• Electric Department Candidate BriefingTDPUD Board of Directors 5 1 feeder circuit–Glenshire o 4 feeder circuits–Martis Valley o 6 feeder circuits–Truckee o 3 feeder circuits–Tahoe Donner o 3 feeder circuits–Donner Lake o 17 total feeders from four Substations–14.4kV–RecloserGlenshire o 120kV–o 60 kV–Truckee Substation o 60kV–Tahoe Donner Substation o 60kV–Donner Lake Substation o Distribution system summary–Structure of electric system• Electric Department (cont)Candidate BriefingTDPUD Board of Directors 6 1,502 commercial customers o 6,973 secondary (60%)o 4,468 primary (40%)o 11,643 residential customers o 13,145 total electric customers–83 miles of underground distribution o 5,390 poles o 136 miles of overhead distribution o 219 miles of distribution circuits–Structure of electric system (cont)• Electric Department (cont)Candidate BriefingTDPUD Board of Directors 7 Net Metering•CARBCarbon Cap and Trade: •requirements CECRPS•requirements adding cost to customersIncreasing Legislative and Regulatory Requirement •Continue safety training–Continue Tree and Pole Clearance Program–efficientContinue maintaining, upgrading and make facilities more –increase reliability–Challenges • Geographic Information Systems (GIS)Candidate BriefingTDPUD Board of Directors 8 Shares with other local agencies•District’s land management•Electric and Water modeling and analysis•Inspection / work and facilities management•Outage management •Streamline electric design process•leverage technology–Cost control •Community wide resource•