HomeMy WebLinkAbout16, Master Plan Presentation
Workshop Item # 16 November 19, 2014 System Master Plan ReportDiscussion of the Electric
Electric System Master Plan 2 Electrical Consultants, Inc. (ECI) to prepare the Master PlanOn December 19, 2013 the Board approved the selection of •Basis for establishment of facility
fees (AB1600)-Blueprint for orderly expansion-Comprehensive planning report-What is a Master Plan? •Background / History
Electric System Master Plan 3 reportStudies at ECI, will present a overview and summary of the Mr. Robert Hurtig P.E., Manager of Planning and System •packetFinal draft of the Master
Plan is attached to the Board •New Information
Electric System Master Plan 4 Truckee, California 9616111570 Donner Pass RoadTruckee Donner Public Utility DistrictPrepared For
Electric System Master Plan Total Plan CostsImprovementsCriteriaHistorical TrendsLoad DataModel DevelopmentOVERVIEW 5
Electric System Master Plan service.manner that endeavors to increase the quality of configuration, voltage levels and load balance in a Evaluate the existing & projected system financial
requirements for the next fifteen (15) years.date forecast possible of -to-Provide the most upeconomic manner possible.Plan & complete improvements in the most out construction &
other needed improvements.Provide the District with an orderly plan for carrying Purpose of Electric System Master Plan 6
Electric System Master Plan Added substation equipmentVerified modelTDPUD provided model from GISModel 7
Electric System Master Plan Total 221 miles of primary conductor70 miles underground151 miles overhead conductorFour Substations and one point of receiptSystem Summary 8
Electric System Master PlanEffect of ongoing conservationJudgment of the District’s Staff and ECITown of Truckee General PlanStatistical analysis of historical monthly dataGrowth
Projections 9
Electric System Master Plan Linear (Average Monthly Usage/Customer)Linear (Number of Consumers)Average Monthly Usage/CustomerNumber of Consumers CONNECTIONSRESIDENTIAL YearConsumerskWH
15,00014,00013,00012,00011,00010,0009,0008,000620600580560540520500480460 2x + 574-y = y = 188x + 9199 10
Electric System Master Plan Linear (Average Monthly Usage/Customer)Log. (Number of Consumers)Average Monthly Usage/CustomerNumber of Consumers( > 50 & < 200 KW)CONNECTIONS COMMERCIAL
YearConsumerskWH 5550454035302525,00020,00015,00010,0005,0000 y = 68x + 208743ln(x) + 48-y = 11
Electric System Master Plan Linear (Average Monthly Usage/Customer)Log. (Number of Consumers)Average Monthly Usage/CustomerNumber of Consumers(> 200 KW)COMMERCIAL CONNECTIONS YearConsumerskWH
111098765432250,000200,000150,000100,00050,0000 7703x + 15619211-y = 309.2ln(x) + 2357.1-y = 12
Electric System Master Plan No projects recommended based on outagesRepairs and upgrades third major causeAnimals second major causePower Supplier number one cause13
Electric System Master Plan Historic TrendProj. KW TrendPeak ExtHist. KW kW TrendTRUCKEE DONNER SYSTEM TOTAL KW 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 -Total System
kW Trend 14
Electric System Master Plan Approximately 1.7% growth rate9.5 MW of additional load at 15 year loading4.0 MW of additional load at 5 year loadingGrowth and Loading 15
Electric System Master Plan 80%–Other equipment loading 100%–Transformer loading 114V; 110V at the consumer–Contingency system voltage 118V; 114V at the consumer–Normal system voltage
Evaluation Criteria 16
Electric System Master Plan Existing System 17
Electric System Master Plan 15 Year Loads–Existing System 18
Electric System Master Plan transformer overloadingConductor loading > 100% existing & future, –Truckee Conductor loading > 100% 15 yr–Martis Valley loads, conductor overloadingBelow
voltage criteria existing and future –Donner Lake Contingency Summary 19
Electric System Master Plan Tahoe Donner 20
Electric System Master Plan Tahoe Donner 21
Electric System Master Plan Donner Lake 22
Electric System Master Plan Tahoe Donner 23
Electric System Master Plan Truckee 24
Electric System Master Plan Martis Valley 25
Electric System Master Plan 9,333,000$Total Costs$5,002,00015-Years 11 $1,136,00010-Years 6 $3,195,0005-Years 1 Total Cost Summary by Year 26
Electric System Master Plan 27 Adoption of CEQA Initial Study and Master Plan -January 21•CEQA Public Hearing-December 17 •date for CEQA Public HearingPresentation of CEQA Initial Study
and set -December 3 •Tonight: Presentation of Master Plan Study final draft•Next Steps
Electric System Master Plan 28 Individual projects will be brought before the Board.•and associated study for future facility fees.Costs associated with projects will be fed into rate
model •Fiscal Impact
Electric System Master Plan 29 Receive this report and provide comments.•Recommendation