Loading...
HomeMy WebLinkAbout8, ElectricMasterPlan CEQA Action Item # 8 December 3, 2014 System Master PlanCEQA Initial Study for the Electric Consideration of the Approval of a CEQA Initial Study for the Electric 2 for the Master Plan in October 2014Inland Ecosystems prepared the CEQA Initial Study •November 19, 2014 Board meetingECI presented a summary of the Master Plan report at the •Electrical Consultants Inc. (ECI) prepared the Master Plan•electric systemblueprint for the orderly expansion/improvement of the Master Plan is a comprehensive planning report and •Background / History System Master Plan New Information System Master PlanCEQA Initial Study for the Electric 3 call-Professional archeologist on–Noxious weed assessment survey–construction raptor and migratory bird survey-Pre–Construction mitigation monitoring:•DocumentConsideration of adoption of Final CEQA –January 21, 2015 –StudyConduct public hearing on CEQA Initial ––StudyConsideration of CEQA Initial –December 3, 2014 (tonight) –Anticipated schedule:•comment, and circulation to agenciesCEQA Initial Study is complete and ready for review, public • Fiscal Impact System Master PlanCEQA Initial Study for the Electric 4 No direct cost associated with approval of the Initial Study• Recommendation System Master PlanCEQA Initial Study for the Electric 5 Negative Declaration at the regular Board meeting on Schedule a public hearing for the Proposed Mitigated •circulatedApprove the CEQA Initial Study and direct that it be •