HomeMy WebLinkAbout7, CEQA Public Hearings
Agenda Item # 7 Electric System Master PlanDeclaration for theStudy and Mitigated Negative Public Hearing for CEQA Initial
Electric System Master Plan 2 Presented to Board on December 3, 2014•CEQA Initial Study Prepared by Inland Ecosystems•Presented to Board on November 19, 2014•Performed by Electrical
Consultants Inc. (ECI)•Study to plan for future infrastructure improvements•Electric System Master Plan performed earlier in 2014•Background / History CEQA Public Hearing
New Information CEQA Public Hearing Electric System Master Plan 3 day period from December 3, 2014 to January 2, 2015-30•Public Hearing required during public comment period•
Fiscal Impact CEQA Public Hearing Electric System Master Plan 4 No fiscal impact associated with this item•
Recommendation CEQA Public Hearing Electric System Master Plan 5 Conduct the public hearing and receive comments•
6 CEQA Public Hearing Electric System Master Plan
Electric System Master Plan Total Plan CostsImprovementsCriteriaHistorical TrendsLoad DataModel DevelopmentOVERVIEW 7
Electric System Master Plan service.manner that endeavors to increase the quality of configuration, voltage levels and load balance in a Evaluate the existing & projected system financial
requirements for the next fifteen (15) years.date forecast possible of -to-Provide the most upeconomic manner possible.Plan & complete improvements in the most out construction &
other needed improvements.Provide the District with an orderly plan for carrying Purpose of Electric System Master Plan 8
Electric System Master Plan Added substation equipmentVerified modelTDPUD provided model from GISModel 9
Electric System Master Plan Total 221 miles of primary conductor70 miles underground151 miles overhead conductorFour Substations and one point of receiptSystem Summary 10
Electric System Master PlanEffect of ongoing conservationJudgment of the District’s Staff and ECITown of Truckee General PlanStatistical analysis of historical monthly dataGrowth
Projections 11
Electric System Master Plan Linear (Average Monthly Usage/Customer)Linear (Number of Consumers)Average Monthly Usage/CustomerNumber of Consumers CONNECTIONSRESIDENTIAL YearConsumerskWH
15,00014,00013,00012,00011,00010,0009,0008,000620600580560540520500480460 2x + 574-y = y = 188x + 9199 12
Electric System Master Plan Linear (Average Monthly Usage/Customer)Log. (Number of Consumers)Average Monthly Usage/CustomerNumber of Consumers( > 50 & < 200 KW)CONNECTIONS COMMERCIAL
YearConsumerskWH 5550454035302525,00020,00015,00010,0005,0000 y = 68x + 208743ln(x) + 48-y = 13
Electric System Master Plan Linear (Average Monthly Usage/Customer)Log. (Number of Consumers)Average Monthly Usage/CustomerNumber of Consumers(> 200 KW)COMMERCIAL CONNECTIONS YearConsumerskWH
111098765432250,000200,000150,000100,00050,0000 7703x + 15619211-y = 309.2ln(x) + 2357.1-y = 14
Electric System Master Plan No projects recommended based on outagesRepairs and upgrades third major causeAnimals second major causePower Supplier number one cause15
Electric System Master Plan Historic TrendProj. KW TrendPeak ExtHist. KW kW TrendTRUCKEE DONNER SYSTEM TOTAL KW 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 -Total System
kW Trend 16
Electric System Master Plan Approximately 1.7% growth rate9.5 MW of additional load at 15 year loading4.0 MW of additional load at 5 year loadingGrowth and Loading 17
Electric System Master Plan 80%–Other equipment loading 100%–Transformer loading 114V; 110V at the consumer–Contingency system voltage 118V; 114V at the consumer–Normal system voltage
Evaluation Criteria 18
Electric System Master Plan Existing System 19
Electric System Master Plan 15 Year Loads–Existing System 20
Electric System Master Plan transformer overloadingConductor loading > 100% existing & future, –Truckee Conductor loading > 100% 15 yr–Martis Valley loads, conductor overloadingBelow
voltage criteria existing and future –Donner Lake Contingency Summary 21
Electric System Master Plan Tahoe Donner 22
Electric System Master Plan Tahoe Donner 23
Electric System Master Plan Donner Lake 24
Electric System Master Plan Tahoe Donner 25
Electric System Master Plan Truckee 26
Electric System Master Plan Martis Valley 27
Electric System Master Plan 9,333,000$Total Costs$5,002,00015-Years 11 $1,136,00010-Years 6 $3,195,0005-Years 1 Total Cost Summary by Year 28