HomeMy WebLinkAboutOrdinance 2018-x Amend Electric Connection Fee Schedule TRUCKEE DONNER
Public Utility District
Ordinance No. 2018 - 01
AMEND ELECTRIC CONNECTION FEE SCHEDULE
WHEREAS, The District last modified the Electric Connection Fee Schedule in 2016; and
WHEREAS, District staff analyzed the cost to provide the various services performed by District
employees as listed on the Electric Connection Fee Schedule; and
WHEREAS, on March 7, 2018, a workshop was held to recommend an increase to the fees
shown on the Electric Connection Fee Schedule, as the cost to provide these services have
increased: and
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public
Utility District as follows:
Section 1. ELECTRIC CONNECTION & FEE SCHEDULE
Fee Effective
Fee Effective September 1, 2019
Size and Type of Service September 1, 2018 plus Inflation
Adjustment (IA)
Single Phase, 1201240 Service — 200 amp
1) Permanent connection to structure $1,656 $2,063 + IA
2) Temporary connection to customer-owned
power pole and subsequent transfer to $2,145 $2,755 + IA
structure
Single Phase, 120/240 Service —400 amp
1) Permanent connection to structure
2) Temporary connection to customer-owned $2,515 $2,665 + IA
power pole; removal of same and $3,003 $3,357 + IA
installation of underground permanent
service to structure
Three phase, 208v, 240v or 480v service
1) Permanent connection to structure Actual Cost Actual Cost
2) Temporary single phase 120/240 service for Actual Cost Actual Cost
construction purposes to become three-
phase permanent service to structure
Overhead to Underground upgrade or relocate, up to
$1,749 $2,250 + IA
200 amp panel
Overhead Relocation $576 $684 + IA
400 amp upgrade $1,841 $1,841 + IA
Underground Relocation up to 200 amp $1,464 $1,680 + IA
Underground Relocation 400 amp $1,680 $1,680 + IA
Temporary overhead service $1,525 $1,802 + IA
1 Ordinance 2018-01
Overhead to Underground upgrade or relocate, up to
200 amp panel, with TPP (Temp to Permanent $2,216
$2,898 + IA
Installation)
Set 35' Pole $1,397 $1,493 + IA
Set 35' Pole and Anchor $2,192 $2,384 + IA
Section 2. Inflation Adjustment (IA) - Commencing on September 1, 2019, Electric Connection
Fees shall be adjusted annually on September 1 of 2019 and successive years to reflect the
impact of inflation upon the fees. Such inflation adjustments shall be based on the August value
of the Engineering News-Record 20-City Construction Cost Index (ENRCCI). The ENRCCI value
for August, 2019, shall be used as the baseline for the Electric Connection Fees that become
effective on September 1, 2019. The change in ENRCCI from August, 2019 to August, 2020
shall be used to calculate the Electric Connection Fees that become effective September 1, 2020.
Successive years shall utilize a similar calculation.
Section 3. This ordinance shall take effect on September 1 , 2018, after adoption by the Board
of Directors of the District.
Section 4, The Clerk of the District shall cause a copy of this ordinance to be published in a
newspaper of general circulation and be made available during regular business hours.
Section 5. The provisions of other ordinances shall remain if effect to the extent that they do not
conflict with this ordinance.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District
at a meeting duly called and held within the District on the sixteenth day of May, 2018 by the
following roll call vote:
AYES: Directors:
NOES: None.
ABSTAIN: None.
ABSENT: None.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis President of the Board
ATTEST:
Shanna D. Kuhlemier, CIVIC, District Clerk
2 Ordinance 2018-01