HomeMy WebLinkAbout9, Consideration to Approve Purchase of Airport Well and Booster Station Emergency Generator
Action Item #9 Station Emergency GeneratorContract for the Airport Well and Booster Consideration to Approve a Purchase Station Emergency GeneratorContract for the Airport Well and Booster
Consideration to Approve a Purchase May 16, 2018
Airport Well and Booster Station Emergency Generator is a critical groundwater supply for the DistrictFacitlity•gpmof 800 Four 100hp electrically powered vertical turbine booster pumps
capable •gpm2,000 250hp electrically powered vertical turbine groundwater well capable of •Facility consists of•Airport Well and Booster Station is located on Truckee Airport Road•BACKGROUND
/ HISTORY Airport Well and Booster Station Emergency Generator
NEW INFORMATION Water production capabilities•available automatic transfer switch–•ease of access–Logistics •Site evaluations considered the following criteria•Identified the most favorable
locations for new generator installations•Staff has evaluated District well facilities•up generators-emergency backDistrict’s water well facilities are currently not equipped with •Airport
Well and Booster Station Emergency GeneratorAirport Well and Booster Station Emergency Generator
NEW INFORMATION Generatorfor the Airport Well and Booster Station Emergency/Standby On March 19, 2018 the District publicly advertised a Request for Bids •450kW diesel generator-Sizing
•Emergency generator performance specifications•Staff has worked with vendors and District electricians•up emergency generator in 2018-installation of a new backAirport Well and Booster
Station is one of two facilities chosen for the •Airport Well and Booster Station Emergency GeneratorAirport Well and Booster Station Emergency Generator
NEW INFORMATION$131,570.00Lake Mary, FLTechnology International$114,676.60Martinez, CACD & Power$92,500.00West Sacramento, CAValley Power Systems$87,988.71Sparks, NVCummins$87,576.00CALivermore,Bay
City ElectricTotal Bid PriceLocationVendor Name A breakdown of the received bids has been provided below•were receivedA bid opening was held on April 17, 2018, at which point the five
bids •Airport Well and Booster Station Emergency GeneratorAirport Well and Booster Station Emergency Generator
NEW INFORMATION the amount of $87,988Staff has determined Cummins to be the lowest responsive bidder in •District specificationsresponsive due to incomplete bid submittal and failure
to meet all -Staff has determined the bid received by Bay City Electric to be non•specificationsStaff has reviewed all bids for compliance with District standards and •Airport Well
and Booster Station Emergency GeneratorAirport Well and Booster Station Emergency Generator
FISCAL IMPACT capital budget19 -Sufficient funds exist in the Water Utility’s Board approved FY18•Airport Well and Booster Station Emergency GeneratorAirport Well and Booster Station
Emergency Generator
RECOMMENDATION of $97,000 plus taxfor a total not to exceed contract amount order authorization change Generator procurement, in the amount of $87,988.71 plus a 10% for the Airport Well
and Booster Station Emergency/Standby Authorize the General Manager to execute a contract with Cummins 1.responsive-Reject Bay City Electric’s bid as non1.Airport Well and Booster Station
Emergency GeneratorAirport Well and Booster Station Emergency Generator