Loading...
HomeMy WebLinkAbout8 Development Agreement Approval ACTION ITEM #Union Mills Road Water PipelineSvendsen for the Mr. Ed of a Development Approval Union Mills Road Water PipelineSvendsen for the Mr. Ed of a Development Approval October 5, 2016 8 Development Agreement for Union Mills Rd. Pipeline 400,000$exceeds to the District conveyed improvements of development agreement where the total value approval by the Board of Directors is required for any er District Code, P•and maintenanceDistrict for ownership, operation the developer and then conveyed to the is necessary when there are facilities that will be constructed by agreement development When a developer proposes to construct a new project, a •BACKGROUND / HISTORY Development Agreement for Union Mills Rd. Pipeline Development Agreement for Union Mills Rd. Pipeline Warranty•Project acceptance•Indemnification•Insurance•Dedication of facilities constructed by the developer•Dedication of easements where necessary•and fees Costs •Items addressed in development agreement typically include:••projectthe responsibilities of each party with respect to a particular Describes •DistrictDevelopment agreement is a contract between the developer and the •BACKGROUND / HISTORY Development Agreement for Union Mills Rd. Pipeline NEW INFORMATION Departmentthe District’s Electric to the property is currently by Electric service •Water service to the property is currently by private well•Near CHP Truck Inspection Station and Agricultural Inspection Station•Located on north side of Interstate 80, east of Overland Trail•Piping Rock Equestrian Center is owned by Mr. Ed Svendsen•Development Agreement for Union Mills Rd. PipelineDevelopment Agreement for Union Mills Rd. Pipeline NEW INFORMATION Connect to existing water system at Overland Trail and Fairway Drive•inch water pipeline is planned-Construction of 8•the new subdivisionFire hydrants connected to the District’s water system are required for •the Equestrian CenterMr. Svendsen will be constructing new residential subdivision adjacent to •Development Agreement for Union Mills Rd. PipelineDevelopmen t Agreement for Union Mills Rd. Pipeline NEW INFORMATION inspection stationsDesign for new water pipeline includes points of connection for both •that timeWater provided by potable water trucks filled from PUD system since •failed in July 2015CHP Truck Inspection Station Well at •served by private wellsare CHP Truck Inspection Station and Agricultural Inspection Station •Development Agreement for Union Mills Rd. PipelineDevelopment Agreement for Union Mills Rd. Pipeline NEW INFORMATION tation connects to pipelineSnspection Iwill make additional reimbursement if the Agricultural of California State •tation not experiencing problems with its wellSAgricultural Inspection •this requirement Representatives with the State of California have been made aware of •costpercent of the construction reimburse 50 State of California will and when the CHP Inspection Station connects to the pipeline, the If •clauseDraft development agreement with Mr. Svendsen includes reimbursement •Development Agreement for Union Mills Rd. PipelineDevelopment Agreement for Union Mills Rd. Pipeline FISCAL IMPACT projectadministration of the and inspection, associated with design, engineering, construction will be responsible to reimburse the District for all costs Developer •Development Agreement for Union Mills Rd. PipelineDevelopment Agreement for Union Mills Rd. Pipeline RECOMMENDATION improvementswater pipeline the Union Mills Road District for the Mr. Ed Svendsen and Approve the development agreement between •Agreement for Union Mills Rd. PipelineDevelopment Agreement for Union Mills Rd. PipelineDevelopment