HomeMy WebLinkAbout13 Attachment 2, Red Mountain Reimbursement RequestG. TAYLOR LAW CORP. 1700 MONTGOMERY STREET, SUITE lOH
$AN FRANCISCO, CA 94111
Truckee Donner Public Utilities District ("TDPUD")
Attn: Brian Wright, General Manager
April 11, 2022
Via e-mail
Dear Mr. Wright:
With the recent completion of the Red Mountain Water Tank facilities (the "Tank
Facilities"), I am writing this letter on behalf of Coldstream Properties, LLC, ("Coldstream") to
request (a) that Truckee Donner Public Utilities District ("TDPUD") formally accept the Tank
Facilities; and (b) that TDPUD reimburse Coldstream $773,224.85 which is the amount presently
owed. These requests are being made in accordance with the "PHASE 3 FINAL DEVELOPMENT
AND REIMBURSEMENT AGREEMENT BETWEEN THE TRUCKEE DONNER PUBLIC
UTILITY DISTRICT AND COLDSTREAM PROPERTIES, LLC FOR CONSTRUCTION OF
CERTAIN POTABLE WATER SYSTEM IMPROVEMENTS" entered into as of June 10, 2020,
and amended on August 6, 2020 (as amended, the "Development Agreement"). Capitalized terms
not otherwise defined herein shall have the meanings ascribed to them in the Development
Agreement.
As set forth in the Development Agreement, Coldstream is entitled to reimbursement for
the actual costs to design and construct the Tank Facilities in the manner set forth in Section 14 of
the Development Agreement and also in Section 2 of the August 6, 2020 amendment. Those costs
(the "Reimbursable Costs" discussed below) total $1,075,135.37 and are summarized on
Attachment 1 .
Prior to Coldstream's reimbursement for the Tank Facilities, TDPUD is required to accept
the Tank Facilities, and we are now requesting TDPUD proceed with such acceptance and provide
Coldstream with the Tank Acceptance Notice as provided in the Development Agreement. To
facilitate the acceptance process, we have provided the link below which contains (a) as -built
drawings, (b) a copy of the maintenance bond in the amount of 15% of the construction costs, (c)
a calculation of the as -built dollar value of the Tank Facilities along with supporting information,
and (d) the construction contract for the Tank Facilities which provides for the Tank Facilities' 1-
year warranty. Coldstream is prepared to execute an offer of dedication for the Tank Facilities at
TDPUD's request if necessary to complete the acceptance process.
Please click here for a link to the Tank Facilities files.
With respect to the amount of reimbursement, Coldstream is now requesting a payment in
the amount of $773,224.85 which is comprised of a $575,135.37 Lump Sum Payment and
$198,089.48 from facilities fees that have been collected from the Coldstream development (the
"Project"). We are calculating such amounts as follows:
Lump Sum Payment: The Reimbursable Costs are $1,075,135.37. The Reimbursable
Costs in excess of $500,000 are $575,135.37, and such amount is the Lump Sum Payment.
Distribution of Facilities Fees: As of March 11, 2022, $198,089.48 in facilities fees have
been collected by TDPUD in connection to the Project. Such amount is to be distributed to
Coldstream and credited to the remaining $500,000 of Reimbursable Costs. Please see
Attachment 2 for details.
Total Currently -Owed Reimbursement: $773,224.85
After the reimbursement payments requested by this letter are paid by TDPUD, the remaining
balance of Reimbursable Costs under the Development Agreement will be $301,910.52 (i.e.
$500,000 minus the $198,089.48 of distributed facilities fees).
Thank you for your attention to this reimbursement request. Coldstream has enjoyed
working with you and your team on the Mixed -Use Village phase of the Project, and we are looking
forward to continuing to work with you on the upcoming Village Green and Lakeside phases.
Please do not hesitate to contact me with any questions on this matter.
Si erely,
Grant aylor
Cc: Neil Kaufman
Mike Isle
Attachment 1
Accounting of Actual Costs
!: TREAM PROPERTIES
RED MOUNTAIN WATER TANK COSTS
ame Invoice Number
7 Mar-22
Involo Dateneering
12/2/2019
19157 Red Mountain Tank SU S 3,S29M
Inc,6404
M
neerin Inc.
8482
1/3/2020
Red Mountaln S 1,366.39
1S0583
1/28/2020
Red Mountaln Weter Tank Re lac $ 6.700.00
NVS
IM70
4/1/2020
Red Mountain Wtr tnk rplemem $ 3,030.00
ARC Docun*m Solutions LlC
230426
4/3/2020
Cldstrm Red Mtn Tank $ SLOB
Sauers Enginuring Inc
12M
2/7/2020
Progress billing • Feb 2020 $ 3AW.00
Progress billing -March 2020 S 7,725.00
Progress billing- April 2020 $ 8,925,23
Red Mountain Tanis S BD.09
Pro 12S719-0042669.00 S 1,205.75
Design Services -June 2020 S 10,425.00
Services May 2020 _ _ $ 12,525.00
August 2020 Red Mountain Tank S 4.500.00
Progress hiking- July 2020 $ 1,800.00
SOWS Ensinearins Inc
12208
3/5/2020
Sauers Enjineennig, Inc
12227
4/3/2020
ARC Document SWutlom LLC
23149M
5/11/2020
NVS
166949
6/5/2020
Sauers Engineerft Inc
M64
6/5/2020
Sauers Engineering, Inc
M41
5/7/2020
Sauers Engineering, Inc
12303 B/S/2020
Sauer$ Engineering, Inc
12285 7/7/2020
Sauers EnillneerIM Inc
12283 7/7/2020
Red Mountain Tank S 750.00
NV5
192580 10/15/2020
2008142SEPTEMBE, 9/1/2020
Services throe 9/26/20 $ 9A&.40
Period ending 9/30/20 $ 2S6,272.75
Start ending 8/31/20 $ 63,625.50
Crosno Construction, Inc
CrosnoConstruction,Inc
BILUNGBREAKDOWi 9/3OnO2OContraO
Crosno COnStruCtion, Inc
20081430CTOBER2' ID/23/2020
Period Ending 10/30/20 S 134,594.96
ARC Document Solutions LLC
2397392,
11/23/2020
WCOP1986760 S 11717
Crosno Construction, Inc
2OD8144OCTOBER2
12/21/2020
Services through 11/1-12/31 $ 2i 506.22
NVS
192065
12/16/2020
Red Mtn. wtr tank thigh11/21 S 1,013.40
NVS
194285
1/6/2021
PW Red Mtn. Water Tank $ 1,260.00
Sauers Enigineering, Inc
12329
9/8/2020
Progress billing- Sept 2020 S 525,00
Sauer Engineering, Inc
12330
9/8/2020
Progress billirWSept 2o2o S 4,350.D0
Sauers. Engineering, Inc
12350
10/6/2020
Progress billing- Oct 2020 $ 2,400.00
SauersEngineerin Inc
12367
11/10/202D
Progress billing- Nov 2020 $ 1,S7S.00
Sauers Engineering, Inc
U390
12/11n020
Progress billing- Dec 2020 S 2,175.00
Progress Billing -January 2021 S 1,050.6D
Sauers Engineering, Inc
12410
1012021
NVS
183096
10/20/2020
Red Mountain Water Tank Replac S 344.00
NV5
191587
12/IS/2020
Red Mountain WtrTnk Replaceme $ 439.10
NV5
187425
11/17/2020
PW Red Mtn WtrTank S 7,835.60
Crosno Construction, Inc
2008145JUNE2020
6/25/2021
Beginni 1/1/21- 6/30/21 $ 194,753.06
Crosno Construction, Inc
2008146JULY2021
7/29/2021
Ified Mtn Tank R icmt 7/1-7/311 5 74,610.70
Crosno Construction, Inc
2008147August2l
B131/2021
Red Mnt Tank Rplcmnt- Aug 2021 $ 118,264.71
Sauers Engineering; Inc
12573
10/4/2021
Job#204MIO $ 450.00
SauersEngineering, Inc
125M
6/6/2021
Job#20,000-10 $ 2,475.00
Sauers Engineering, Inc
12521
7/19/2021
Job* 20-000-01 $ $25.00
Sauers Engineering, Inc
12539
8/12/2021
Jobs 20-000.10 $ 825.00
Sauers Engineering, Inc
12555
9/8/2021
lob# 20-0OD 10 $ 25-00
Crosno Construction, Inc
2008148OCTOBER2
11/2/2D21
Job# 200914 Red Mountain Tank S 3,341.42
Crosno Construction, Inc
2MI49
21/29/2021
Red Mountain Tank S 96,590.97
NVS 1
227497
8/17/2021
Red Mtn. WtrTnksvcS.7/24/21 S 3,,298.60
NVS
231962
9/14/2021
Red Mtn Wtr TO Svcs. 8121/21 S 836.80
5auers Engineering, Inc
I269S
3/2/2022
Record Drawings
S 1,SOO.04
S 1,075,135.37
Attachment 2
Facilities Fees Paid to Date
'*,#--TRUCKEE DONNER
Public Utility District
Coldstream Water Facirty Fees -as of 3/11/2022
0esa%fto
A00RESS
DAiEPAR)
AlFr PAW
WO!
WO Name
IRR Meter#1
Coldstream PC1 - IRR / Roundabout
8/8/2019
$ 7,575.00
19-744402
Coldstream PC1
IRR Meter#2
Coldstream PCI- IRR/North
8/8/2019
$ 7,575.00
19-744402
Coldstream PC1
IRR Meter#3
Coldstream PC1-IRR/South
8/8/2019
$ 7,575.00
19-744402
Coldstream PC1
Bldg 1
13033 Sawmill Road
5/26/2020
$ 12,846.00
19-744425
Coldstream Commons
Bldg 2
12956 Winter Camp Way
5/26/2020
$ 12,846.00
19-744425
Coldstream Commons
Bldg 3
13042 Fish Camp Way
5/26/2020
$ 12,846.00
19-744425
Coldstream Commons
Bldg 4
113058 Fish Camp Way
5/26/2020
$ 12,846.00
19-744425
Coldstream Commons
Bldg 5
13070 Fish Camp Way
5/26/2020
$ 12,846.00
19-744425
Coldstream Commons
Bldg 6
13051 Sawmill Road
5/26/2020
$ 5,138.00
19-744425
Coldstream Commons
IRR
Coldstream Commons Irrigation
5/26/2020
$ 12,846.00
19-744425
Coldstream Commons
SFR
12957 Winter Camp Way
9/7/2021
$ 3,696.00
SFR
12963Winter Camp Way
9/7/2021
$ 2,83392
SFR
12969 Winter Camp Way
9/7/2021
$ 2,403A4
SFR
12975 Winter Camp Way
9/7/2021
$ 2,403A4
SFR
112991 Winter Camp Way
9/8/2021
$ 3,696.00
SFR
12997 Winter Camp Way
9/8/2021
$ 3,696.00
SFR
12993 Winter Camp Way
9/8/2021
$ 2,56128
SFR
12999Winter Camp Way
9/912021
$ 2,83392
SFR
13005 Winter Camp Way
9/21/2021
$ 2.403.84
SFR
13011 Winter Camp Way
9/21/2021
$ 2,83776
SFR
12907 ke House Loop
11/23/2C20
$ 2,50792
SFR
12915 Ice House Loop
11/23/2020
$ 3,30880
SFR
12922Ice House Loop
11/19/2(VO
$ 2,839.80
SFR
12924 ke House Loop
9/7/2021
$ 2.403.84
SFR
12930 Ice House Loop
917PO21
$ 2,-%128
SFR
12934 ke House Loop
1/25/2021
$ 2,838.80
SFR
12939 Ice House Loop
1/25/2071
$ 2,353.76
SFR
12931 Ice House Loop
1/25/2021
$ 2,353.76
SFR
12925 Ice House Loop
10/19/2C20
$ 3,69292
SFR
12919 Ice House Loop
10/19/2020
$ 3,619.00
SFR
12913 Ice House Loop
10119/2020
$ 3,619.00
SFR
12905 Ice House Loop
11/19/2020
$ 2,774M
SFR
12997 Ice House Loop
11/19/2t120
$ 3,619110
SFR
12M Ice House Loop
5/13/202D
$ 2,77428
SFR
12991 Ice House Loop
51131202D
$ 3,619.00
SFR
12875 Ice House Loop
5/131202D
$ 3,619.00
SFR
12869 Ice House Loop
5/131202D
$ 2.77428
SFR
130575plit Rack Court
9/21/2021
$ 3,696.00
SFR
13051 Split Rack Court
9/21/2021
$ 2,56128
SFR
13068 Split Rack Court
9/21/2021
$ 3,696110
SFR
13074 Split Rock Court
9/21/2021
$ 2,56128
Total $ 1MOO9-40