Loading...
HomeMy WebLinkAbout9, Pipeline Replacement 2014Workshop Item # 9 Discussion of the District Pipeline Replacement - 2014 project September 4, 2013 Background / History • The Water Department has a need to replace existing pipelines in two categories: — Pipes in poor condition requiring repeated repairs — Pipes that are old, undersized (typically 4-inch diameter and smaller) and have exceeded their useful life 2 New Information • Staff is conducting preliminary engineering work associated with District Pipeline Replacement— 2014 project — Cost estimating & budgeting — Environmental review — Identifying existing utilities — Coordination with other local agencies 3 New Information • A number of pipeline segments for replacement have been identified — Sanders Well yard piping — Boca Street — Sierra Drive — Rainbow Drive — Whitetail Lane — Julian Avenue — Northwoods Blvd — Sun Valley Road — Johnson Lane — Willow Street service laterals & meter boxes 0 New Information • Sanders Well yard piping — Significant number of leaks have arisen in the past month — Turned off for the Winter • About 1,300 feet of pipe in Biltz Tract — Boca Street & Sierra Drive — Single lane roads — Likely to be rocky — Temporary aboveground piping system — Test case for other streets 5 New Information • Current project schedule — Engineering & design — Fall 2013 — Environmental review & permitting — Fall 2013 — Advertising for Bids — February 2014 — Bid Opening — March 25, 2014 — Bid Award —April 2, 2014 — Begin Construction — May 1, 2014 — Complete Construction — October 2014 a Fiscal Impact • Water Department is proposing $1,000,000 for the construction contract — Bid documents will include additive alternates to provide flexibility • Planned funding source is Capital Replacement Fund • Other costs associated with inspection, geotechnical testing and environmental services 7 Recommendation Receive this report and provide comment