Loading...
HomeMy WebLinkAbout12-Status Report on the Water Meter Project ProgressAgenda Item # 12 T U KEE D 11 NE# Public Utility District WORKSHOP To: From: Date: Subject: Board of Directors Brian Wright September 18, 2013 Status Report on the Water Meter Project Progress 1. WHY THIS MATTER IS BEFORE THE BOARD This item is informational. Board action is not required. 2. HISTORY The Water Department began deployment of its automated meter reading (AMR) system in September of 2008. The initial phases (2008-2010) were performed by Measurement Control Systems (MCS). All of the work from 2011 to the present has been performed by District staff. The last progress report on the meter installation project was presented to the Board in January 2011. 3. NEW INFORMATION As of September 9, 2013 a total of 11,657 meters have been installed (700 commercial & 10,957 residential) encompassing about 93% of the customers (the Water Department currently has a total of 12,515 customers). These totals include both new construction and older customers where new meters were installed. The great majority of these meters were installed in 2009 and 2010. A total of 896 locations remain on the "Red Flag" list, which gives locations where a meter has not yet been installed. The main factors preventing meter installation were: • Meter box was buried and/or could not be located; • Meter box was paved over or located under a deck, large rocks, tree, fence or similar obstruction; • No meter box, only a curb stop; • Meter box was too small, too deep or damaged; • Excessive groundwater; and • Broken/inoperable valves. The table below gives a breakdown of the Red Flag list by location. Area Quantity Armstrong/Gateway 182 Donner Lake 37 Downtown/Olympic Heights 27 Prosser/Northeast 128 Sierra Meadows/Ponderosa Palisades 140 Tahoe Donner 366 Commercial (Various Locations) 16 Total 896 During the past three summers (including 2013), the Water Department has created a three -person meter box installation crew from its field staff. This crew has been working to install meters at Red Flag locations. The crew has completed all installations in the Glenshire and Hirschdale areas. The work in Olympic Heights will be completed in September 2013. The crew will also complete some of the remaining commercial installations this year. During the summer of 2014, the meter installation crew will be working in the Prosser Heights and Prosser Lakeview areas. Each winter, the Water Department has prepared a set bid documents for procurement of the necessary meter boxes, piping materials and other hardware to be installed the following summer. The bid documents for the 2014 work will be prepared later this fall. The January 2011 presentation gave a summary and lessons learned regarding the meter project. Given below is an update regarding some of those items: • Currently, about 7% of the customers have a leak somewhere after the meter box. This compares to about 10% of customers with a leak in 2011. The main causes of leaks remain unchanged: 1) Malfunctioning, damaged or improperly operated irrigation systems 2) Corroded or improperly operated stop and drain valves 3) Leaking toilets 4) Corroded customer -owned service laterals • The District continues to be strongly pro -active in regards to notifying customers regarding pipe breaks and large customer leaks in the winter. Detection and notification of leaks in the summer is more problematic due to irrigation usage that tends to mask leaks in consumption data. • A number of errors within the Customer Information System have been identified and corrected. These errors were mainly associated with developers providing erroneous information for multi -family residential properties. • All known illegal connections have been either equipped with a meter or disconnected. • Summarized in the table below is average daily metered consumption for residential customers. As expected, there is a significant variation in water consumption when comparing winter to summer due to irrigation related usage. There is not sufficient data to determine any long term trends. However, there is a significant variation in May and June consumption which is related to severity of the winter, snowfall/snowpack and when customers being irrigating in the summer. Average Daily Metered Consumption for Residential Customers, aallons Der connection Der day Month 2011 2012 2013 January 114 92 109 February 111 96 98 March 100 90 91 April 96 94 117 May 108 221 225 June 215 325 325 July 365 386 390 August 366 357 358 September 294 299 October 137 170 November 87 85 December 95 99 4. FISCAL IMPACT Expenditures related to the water meter project have been funded from the Reserve for Future Meters Fund. The Fund started with a balance of about $1.4 million. During the period of 2009-2013, revenue of about $3.7 million will have been generated by the Water Meter Surcharge and directed into the Reserve for Future Meters Fund. An additional $250,000 was directed into the Reserve for Future Meters Fund in 2011. Expenditures related to the meter installation project total about $4.3 million to date, and should reach about $4.5 million by the end of the year. The projected balance in the Reserve for Future Meters Fund at the end of 2013 is about $900,000. Future expenditures are estimated at $450,000 per year for the next five years. It is anticipated that once the Reserve for Future Meters Fund is exhausted, the remaining work will be funded from rates. 5. RECOMMENDATION Receive this report and provide comment. Michael D. Holley General Manager / Water Utility Manager