HomeMy WebLinkAbout7-1,Attachment 1, Analysis of Bid Quantities vs Actual-Water PipelineAnalysis of Bid Quantities vs. Actual Quantities Constructed
District Pipeline Replacement - 2013
Contractor: A&K Earthmovers
Bid Item
I Description
Bid Amounts
Actual Amounts
Quantity Units
I Unit Price
Subtotal
Quantity Units
I Unit Price
Subtotal
1
Mobilization
1
LS
$
22,222.22
$
22,222.22
1
LS
$
22,222.22
$
22,222.22
DAVOS & HEIDI
1A
8" Water Main from Station 0+00 to Station 4+30.75
431
FT
$
75.00
$
32,325.00
423
FT
$
75.00
$
31,725.00
1 B
2" PE Water Service Lateral
150
FT
$
52.00
$
7,800.00
134
FT
$
52.00
$
6,968.00
1 C
Double Water Service for Lower Pressure Area (DSL)
5
EA
$
2,075.00
$
10,375.00
3
EA
$
2,075.00
$
6,225.00
1 D
Fire Hydrant Assembly
1
EA
$
6,500.00
$
6,500.00
1
EA
$
6,500.00
$
6,500.00
1 E
1" Air Valve Assembly
1
EA
$
2,695.00
$
2,695.00
1
EA
$
2,695.00
$
2,695.00
1 F
Connection to Existing 8" Steel Piping at Station 0+00
1
LS
$
1,130.00
$
1,130.00
1
LS
$
1,130.00
$
1,130.00
1 G
Connection to Existing 8" Pipe at Station 4+30.75
1
LS
$
1,130.00
$
1,130.00
1
LS
$
1,130.00
$
1,130.00
1 H
6" FCA with Blind Flange at Davos Drive and Heidi Way
1
LS
$
1,300.00
$
1,300.00
1
LS
$
1,300.00
$
1,300.00
11
Rock Excavation
2
HRS
$
600.00
$
1,200.00
0
HRS
$
600.00
$
-
1J
A.C. Pavement and Base (Trench Restoration)
3,300
SF
$
1.00
$
3,300.00
3,702
SF
$
1.00
$
3,702.00
1 K
Additional %" Thickness of A.C. Pavement (Trench Restoration)
3,300
SF
$
0.60
$
1,980.00
0
SF
$
0.60
$
-
1 L
A.C. Lane Restoration
4,300
SF
$
3.00
$
12,900.00
4,241
SF
$
3.00
$
12,723.00
1 M
All Other Work Required by the Contract Documents
1
LS
$
14,500.00
$
14,500.00
1
LS
$
14,500.00
$
14,500.00
NORTHWOODS AT NORSE
2A
12" Water Main from Station 0+03 to Station 5+73
570
FT
$
94.00
$
53,580.00
560
FT
$
94.00
$
52,640.00
2B
2" PE Water Service Lateral
50
FT
$
60.00
$
3,000.00
49
FT
$
60.00
$
2,940.00
2C
Single Water Service (SS)
1
EA
$
1,350.00
$
1,350.00
1
EA
$
1,350.00
$
1,350.00
2D
Double Water Service with One Lot Vacant (DSV)
1
EA
$
2,075.00
$
2,075.00
1
EA
$
2,075.00
$
2,075.00
2E
Fire Hydrant Assembly
1
EA
$
6,500.00
$
6,500.00
1
EA
$
6,500.00
$
6,500.00
2F
Air Valve Assembly
1
LS
$
2,695.00
$
2,695.00
1
LS
$
2,695.00
$
2,695.00
2G
Connection to Existing Piping at Station 0+00
1
LS
$
2,600.00
$
2,600.00
1
LS
$
2,600.00
$
2,600.00
2H
Connection to Existing 8" Piping at Station 5+79.29
1
LS
$
1,900.00
$
1,900.00
1
LS
$
1,900.00
$
1,900.00
21
Rock Excavation
2
HRS
$
600.00
$
1,200.00
9
HRS
$
600.00
$
5,100.00
2J
A.C. Pavement and Base (Trench Restoration)
4,700
SF
$
1.00
$
4,700.00
4,828
SF
$
1.00
$
4,828.40
2K
Additional'h" Thickness of A.C. Pavement (Trench Restoration)
4,700
SF
$
0.60
$
2,820.00
4,056
SF
$
0.60
$
2,433.60
2L
A.C. Lane Restoration
650
SF
$
3.00
$
1,950.00
726
SF
$
3.00
$
2,178.00
2M
All Other Work Required by the Contract Documents
1
LS
$
15,600.00
$
15,600.00
1
LS
$
15,600.00
$
15,600.00
NORTHWOODS ABOVE CHAMONIX
3A
8" Water Main from Station 0+03 to Station 5+70.54
567
FT
$
75.00
$
42,525.00
586
FT
$
75.00
$
43,950.00
3B
2" PE Water Service Lateral
150
FT
$
46.00
$
6,900.00
164
FT
$
46.00
$
7,544.00
3C
Double Water Service (DS)
1
EA
$
1,750.00
$
1,750.00
1
EA
$
1,750.00
$
1,750.00
3D
Double Water Service with One Lot Vacant (DSV)
3
EA
$
2,075.00
$
6,225.00
2
EA
$
2,075.00
$
4,150.00
3E
Fire Hydrant Assembly
2
EA
$
6,500.00
$
13,000.00
2
EA
$
6,500.00
$
13,000.00
3F
Connection to Existing Piping at Station 0+00
1
LS
$
1,750.00
$
1,750.00
1
LS
$
1,750.00
$
1,750.00
3G
Rock Excavation
2
HRS
$
600.00
$
1,200.00
9
HRS
$
600.00
$
5,400.00
3H
A.C. Pavement and Base (Trench Restoration)
4,500
SF
$
1.00
$
4,500.00
4,936
SF
$
1.00
$
4,936.00
31
Additional %2" Thickness of A.C. Pavement (Trench Restoration)
4,500
SF
$
0.60
$
2,700.00
0
SF
$
0.60
$
-
3J
A.C. Lane Restoration
6,400
SF
$
3.00
$
19,200.00
6,326
SF
$
3.00
$
18,978.00
3K
All Other Work Required by the Contract Documents
1
LS
$
15,500.00
$
15,500.00
1
LS
$
15,500.00
$
15,500.00
_D
Sy
n
Zr
3
CD
Analysis of Bid Quantities vs. Actual Quantities Constructed
District Pipeline Replacement - 2013
Contractor: A&K Earthmovers
Bid Item
I Description
Bid Amounts
Actual Amounts
Quantity Units
Unit Price
Subtotal
Quantity Units
Unit Price
Subtotal
NORTHWOODS AT COYOTE MOON
4A
12" DI Water Main from Station 0+00 to Station 1+00
100
FT
$
125.00
$
12,500.00
98
FT
$ 125.00
$ 12,250.00
4B
12" Butterfly Valve Assembly
1
EA
$
2,750.00
$
2,750.00
1
EA
$ 2,750.00
$ 2,750.00
4C
Blowoff Assembly
1
EA
$
1,450.00
$
1,450.00
1
EA
$ 1,450.00
$ 1,450.00
4D
Connection to Existing 14" Piping at Station 0+00
1
LS
$
975.00
$
975.00
1
LS
$ 975.00
$ 975.00
4E
Connection to Existing 14" Piping at Station 1+00
1
LS
$
975.00
$
975.00
1
LS
$ 975.00
$ 975.00
4F
Rock Excavation
2
HRS
$
600.00
$
1,200.00
0
HRS
$ 600.00
$ -
4G
A.C. Pavement and Base
620
SF
$
1.00
$
620.00
620
SF
$ 1.00
$ 620.00
4H
Additional'Y2" Thickness of A.C. Pavement
620
SF
$
0.60
$
372.00
0
SF
$ 0.60
$ -
41
A.C. Lane Restoration
1,600
SF
$
3.00
$
4,800.00
1,392
SF
$ 3.00
$ 4,176.00
4J
All Other Work Required by the Contract Documents
1
LS
$
8,750.00
$
8,750.00
1
LS
$ 8,750.00
$ 8,750.00
NORTHWOODS AT VIKING
5A
8" Water Main from Station 0+00 to Station 6+27.20
628
FT
$
75.00
$
47,100.00
640
FT
$ 75.00
$ 48,000.00
5B
2" PE Water Service Lateral
350
FT
$
44.00
$
15,400.00
269
FT
$ 44.00
$ 11,836.00
5C
Double Water Service (DS)
6
EA
$
1,750.00
$
10,500.00
6
EA
$ 1,750.00
$ 10,500.00
5D
Single Water Service (SS)
2
EA
$
1,350.00
$
2,700.00
0
EA
$ 1,350.00
$ -
5E
Fire Hydrant Assembly
2
EA
$
6,500.00
$
13,000.00
2
EA
$ 6,500.00
$ 13,000.00
5F
Connection to Existing 6" Piping at Station 0+00
1
LS
$
1,450.00
$
1,450.00
1
LS
$ 1,450.00
$ 1,450.00
5G
Connection to Existing 6" Piping at Station 6+27.20
1
LS
$
1,450.00
$
1,450.00
1
LS
$ 1,450.00
$ 1,450.00
5H
Rock Excavation
4
HRS
$
600.00
$
2,400.00
0
HRS
$ 600.00
$ -
51
A.C. Pavement and Base (Trench Restoration)
6,200
SF
$
1.00
$
6,200.00
4,144
SF
$ 1.00
$ 4,144.00
5J
Additional Yz" Thickness of A.C. Pavement (Trench Restoration)
6,200
SF
$
0.60
$
3,720.00
0
SF
$ 0.60
$ -
5K
All Other Work Required by the Contract Documents
1
LS
$
16,825.00
$
16,825.00
1
LS
$ 16,825.00
$ 16,825.00
$ 489,714.22
$ 469,769.22
Credit to TDPUD $ 19,945.00
D
v
n
zr
3