Loading...
HomeMy WebLinkAbout11, Electric Master PlanAction Item # 11 Consideration of an Award for the Electric System Master Plan Update Study December 18, 2013 Background / History • Comprehensive system -wide planning study — Provides road map for electric system improvements • Updated every 5 years — Last updated in 2009 by Electrical Consultants, Inc. (ECI) — Projects indicated by previous study: — Third Donner Lake Feeder (completed in 2009) — Tahoe Donner Substation Improvements (completed in 2010) — Donner Lake Substation Improvements (on -going) — IT issues are not addressed by electrical master plan 2 New Information • RFP period from October 31 to November 26, 2013 • 4 proposals received — Commonwealth Associates, Inc; Electrical Consultants, Inc.; Kinectrics; and Leidos — All proposals were responsive — Reviewed by Steve Hollabaugh, Joe Horvath, Neil Kaufman and Sanna Schlosser — 100 point scale: 85 points for technical proposal, 15 for cost proposal 3 New Information (Continued) * Results: ECI 74.0 15.0 89.0 Leidos 73.5 11.9 85.4 CAI 56.3 1.0 57.3 Kinectrics 43.3 1.0 44.3 * ECI proposal selected due to experience and lowest cost 0 Fiscal Impact • FY14 Budget includes $70,000 for this project 5 Recommendation • Award the Electric System Master Plan Study to Electrical Consultants, Inc. in an amount of $58,164 plus a 10% change order allowance for an amount not to exceed $637980 a