HomeMy WebLinkAboutSCADAattachmentsAnalysis of Bid Quantities vs. Actual Quantities Constructed
SCADA Conduit and Vault Project-2011
Contractor: Heavy Equipment, Inc.
Bid Item
Description
Bid Amounts
Qty Units Unit Price Subtotal
Actual Amounts
Qty Units Unit Price Subtotal
1
Mobilization
1
LS
$ 2,500.00
$
2,500.00
1
LS
$
2,500.00
$
2,500.00
2
1-2" PVC Comm Conduit
300
FT
$ 45.00
$
13,500.00
300
FT
$
45.00
$
13,500.00
3
2-2" PVC Comm Conduit
70
FT
$ 80.00
$
5,600.00
70
FT
$
80.00
$
5,600.00
4
3-2" PVC Comm Conduit
10
FT
$ 120.00
$
1,200.00
10
FT
$
120.00
$
1,200.00
5
1-6" PVC Electric Conduit
65
FT
$ 90.00
$
5,850.00
160
FT
$
90.00
$
14,400.00
6
2" Conduit Connection in Lean Concrete
3
EA
$ 1,000.00
$
3,000.00
3
EA
$
1,000.00
$
3,000.00
7
B3048 Comm Vault
5
EA
$ 3,500.00
$
17,500.00
5
EA
$
3,500.00
$
17,500.00
8
Core Drill Hole in Vault for 2" C.
5
LS
$ 200.00
$
1,000.00
3
LS
$
200.00
$
600.00
9
2" Steel C. Pole Riser
1
EA
$ 2,500.00
$
2,500.00
1
EA
$
2,500.00
$
2,500.00
10
Raise Manhole Cover/install Grade Ring
1
EA
$ 2,500.00
$
2,500.00
1
EA
$
2,500.00
$
2,500.00
11
Pavement Restoration
800
SQ FT
$ 9.00
$
7,200.00
1283
SQ FT
$
9.00
$
11,547.00
12
Rock Excavation
1
HR
$ 400.00
$
400.00
0
HR
$
400.00
$
-
13
All other work as described by Contract
1
LS
$ 2,000.00
$
2,000.00
1
LS
$
2,000.00
$
2,000.00
Total I $ 64,750.0011 Total I $ 76,847.0011
Change Order
Contract Name: SCADA Conduit and Vault Proiect 2011
Contract Change Order No: 2 Orig. Contract Amt. $ 64,750.00 Days NA
Date: September 8, 2011 Prev. Apprd Changes $ 6,475.00 Days NA
Contractor: Heavy Equipment, Inc. This Change $ 5,622.00 Days NA
Revised Contract Amt. $ 76,847.00 Days NA
Remaining Authorized
Change Amt. $ 0.00 Days NA
This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct,
furnish equipment and materials, and perform all work as necessary or required to complete the Change Order
Items for a lump sum price agreed upon between the Contractor and District.
Increase in
(Decrease)
Contract Time
Contract
in Contract
Extension
Description of Changes
Amount $
Amount $
(days)
1. Item # 5, 1-6" PVC Electric Conduit
$1,275.00
2. Item # 11, Pavement Restoration
$4,347.00
Totals
$5,622.00
NA
Net change in contract amount (increase or decrease)
$5,622.00
NA
The amount of the Contract will be increased by the sum of $5,622.00 and the Contract Time shall not be
extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item including any and all supervision costs and other miscellaneous costs
relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other
necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete
the Change order items. This document will become a supplement of the contract and all provisions will apply
hereto. It is understood that the Change Order shall be effective when approved by the District.
Accepted:
Approved:
(Signature)
(Signature)
/Contractor Date:
/District Date:
Page 1
i 11
Resolution No. 2011 - XX
AUTHORIZING THE ACCEPTANCE OF
SCADA CONDUIT AND VAULT PROJECT-2011
AND DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to
undertake the SCADA Conduit and Vault Project-2011; and
WHEREAS, Heavy Equipment, Inc., was selected by the District to perform the work; and
WHEREAS, Heavy Equipment, Inc., has completed all of the Work included in the Project; and
WHEREAS, The District's Electric System Engineer, Joe Horvath, now certifies the completion of the project;
and
WHEREAS, the District's Water Utility Manager, Michael Holley, has recommended that the work be accepted
by the District;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the SCADA Conduit and Vault Project-2011 as complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a
copy of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor
payments be released to the contractor if no claims have been made to the District by material
suppliers, laborers, or sub -contractors.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the
7th day of September 2011 by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Jeff Bender, President of the Board
ATTEST:
Michael D. Holley, Clerk of the Board
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
11570 Donner Pass Road
Truckee, CA 96161
THE UNDERSIGNED DECLARES
DOCUMENTARY TRANSFER TAX - NONE
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as owner
thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA 96161.
2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of
water facilities.
3. That on September 7, 2011 the hereinafter described improvements were accepted as complete
pursuant to Resolution 2011-XX of the Truckee Donner Public Utility District, the awarding authority.
4. That the subject improvements of the Notice are generally described and identified as follows:
SCADA Conduit and Vault Project-2011, Truckee, California.
5. That the name and address of the contractor for such project was: Heavy Equipment, Inc., PO Box
11050, Truckee, CA 96162
Dated:
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Michael D. Holley, General Manager
MAIL TAX STATEMENTS TO:
SAME AS ABOVE
Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)