Loading...
HomeMy WebLinkAboutTDONattachmentsAnalysis of Bid Quantities vs. Actual Quantities Constructed Tahoe Donner Substation Rebuild Project - 2009 Contractor: PAR Electrical Contractors, Inc. Bid Item Description Bid Amounts iQty Units Unit Price Subtotal Actual Amounts Qty Units Unit Price Subtotal 1.1A 2-6" and 2-2" PVC Conduits 410 FT $ 66.10 $ 27,101.00 410 FT $ 66.10 $ 27,101.00 1.16 6" and 3" PVC and 2" Tele. Conduits 20 FT $ 64.70 $ 1,294.00 20 FT $ 64.70 $ 1,294.00 1.1C 577TD Vault w/full traffic cover 1 EA $ 11,145.20 $ 11,145.20 1 EA $ 11,145.20 $ 11,145.20 1.11) B3048 Comm. Box with full traffic cover 1 EA $ 1,819.50 $ 1,819.50 1 EA $ 1,819.50 $ 1,819.50 1.1E 6" and 2" steel risers 2 EA $ 1,953.20 $ 3,906.40 2 EA $ 1,953.20 $ 3,906.40 1.1F 6", 3" and 2" steel risers 1 EA $ 475.00 $ 475.00 1 EA $ 475.00 $ 475.00 1.1G Rock Excavation 2 HRS $ 2,821.00 $ 5,642.00 4 HRS $ 2,821.00 $ 11,284.00 Control Enclosure, Recloser Controls, 1.2 Manholes, Cable and Conduit 1 LS $ 96,212.00 $ 96,212.00 1 LS $ 96,212.00 $ 96,212.00 2A All other work as described by Contract 1 LS $ 474,652.40 $ 474,652.40 1 LS $ 474,652.40 $ 474,652.40 Total I $ 622,247.50 II Total I $ 627,889.50 II Contract Name: Tahoe Donner Substation Rebuild-2009 3 (Field Changes 12 Contract Change Order No: and 14) Date: 8/17/11 Contractor: PAR Electrical Contractors, Inc Change Order Orig. Contract Amt. $ 622,247.70 Days NA Prev. Apprd Changes $ 20,364.51 Days NA This Change $ 15,122.00 Days NA Revised Contract Amt. $ 657,734.21 Days NA Remaining Authorized Change Amt. $ 26,513.49 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ (days) Field Change 12: Purchase and installation of new $10,230.00 0 days transformer bushings Field Change 14: Materials to repair control enclosure ($750.00) 0 days damage $5,642.00 0 days Additional Rock Excavation — 2 hours Totals $15,872.00 ($750.00) 0 days Net change in contract amount (increase or decrease) $15,122.00 0 days The amount of the Contract will be increased by the sum of $_15,122.00 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs related to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. Accepted: Approved: (Signature) (Signature) /Contractor Date: /District Date: Page 1 i 11 Resolution No. 2011 - XX AUTHORIZING THE ACCEPTANCE OF TAHOE DONNER SUBSTATION REBUILD - 2009 PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Tahoe Donner Substation Rebuild — 2009 Project; and WHEREAS, PAR Electrical Contractors, Inc., was selected by the District to perform the work; and WHEREAS, PAR Electrical Contractors, Inc., has completed all of the Work included in the Project; and WHEREAS, The District's Electrical Engineer, Sanna Schlosser, now certifies the completion of the project; and WHEREAS, the District's Water Utility Manager, Michael Holley, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Tahoe Donner Substation Rebuild— 2009 Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers, laborers, or sub -contractors. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 7th day of September 2011 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: IN:71L41:/4:80P7Z1k1=1:711J __]x DRillIINkrda]6119N[oil By Jeff Bender, President of the Board ATTEST: Michael D. Holley, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT 11570 Donner Pass Road Truckee, CA 96161 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX - NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA 96161. 2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water facilities. 3. That on September 7, 2011 the hereinafter described improvements were accepted as complete pursuant to Resolution 2011-XX of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the Notice are generally described and identified as follows: Tahoe Donner Substation Rebuild — 2009 Project, Truckee, California. 5. That the name and address of the contractor for such project was: PAR Electrical Contractors, Inc., 1465 West 4th Street, Reno, NV. 89503 Dated: I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Michael D. Holley, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)