Loading...
HomeMy WebLinkAbout8,Connection Fee Public Hearing Public Hearing # 8 September 5, 2012 Connection FeesOrdinance to Adjust Water Public Hearing Regarding an Public Hearing Regarding an Ordinance 2 Adjustment is needed to keep pace with current costs–of Water Connection Fees2012 Water Master Plan Update recommended adjustment •February 2008Current Water Connection Fee Schedule was adopted in •Background / History to Adjust Water Connection Fees New Information to Adjust Water Connection FeesPublic Hearing Regarding an Ordinance 3 Board MeetingConsideration of the ordinance is scheduled for October 3 •available to the publicDraft Ordinance was included in Board packets and made • Fiscal Impact Actual CostActual Cost6”Actual CostActual Cost4”Actual CostActual Cost3”Actual CostActual Cost2”Actual CostActual Cost1/2”-1$1,430Actual Cost1”$1,330$1,2203/4"$1,290$1,1855/8 x 3/4"Connection FeeProposedConnection FeeExistingMeter Size to Adjust Water Connection FeesPublic Hearing Regarding an Ordinance 4 Connection Fees• Recommendation to Adjust Water Connection FeesPublic Hearing Regarding an Ordinance 5 ordinanceConduct the Public Hearing to receive comment on the draft •