Loading...
HomeMy WebLinkAboutResolution 94RESOLUTION NO. 94 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT AMENDING ELECTRIC SYSTEM CONSTRUCTION STANDARDS POLICY TITLE 7, CHAPTER 7.48 (PREVIOUSLY ELECTRIC RULE 24 ADOPTED BY RESOLUTION NO. 8430) WHEREAS, there are numerous advantages to the District and to the District's customers in promoting the undergrounding of electric system facilities, including safety, reduced maintenance and aesthetics, and WHEREAS, it is the intent of the Truckee Donner Public Utility District to provide consistent, concise and understandable policies that can be clearly interpreted, NOW, THEREFORE, BE 1T RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: �. That effective this date, previous rules, regulations and policies pertaining to applications for electric service be rescinded. 2. That Title 7, Chapter 7.48, Electric System Construction Standards, copy attached, be adopted effective this date. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 6th day of September 1994 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By James A. Maass, President ATTEST: Susan M. Craig, Deputy District Clerk smc CHAPTER 7.48 ELECTRIC SYSTEM CONSTRUCTION STANDARDS Sections: 7.48.010 Underground Facilities Policy 7.48.020 Underground Electric Supply (GO 128) 7.48.030 Overhead Electric Lines (GO 95) 7.48.010 Underground Facilities Polic 7.48.010.1 It shall be the policy of the Truckee Donner Public Utility District to require all new or rebuild construction to be placed underground wherever practical Special circumstances may dictate underarounding is not practical and the District reserves the right to determine the practicality of a project 7.48.020 Underground Electric Supply 7.48.020.1 General Order No. 128 of the Public Utilities Commission of the State of California, promulgating and providing rules for underground electric line construction, as amended, is hereby declared to be the minimum and standard requirement for all underground electric line construction and reconstruction hereafter done by, for, or on behalf of the District, as well as for any such construction hereafter accepted or to be accepted into the District system. 7.48.020.2 The adoption of General Order No. 128 shall apply in the future to any and all amendments as may hereafter be ordered by the Public Utilities Commission, and an up-to-date, true and correct copy of said order and rules, with future amendments, shall be kept at the District office at all times. 7.48.020.3 The requirements of said General Order No. 128 shall hereafter be referred to in all bids, plans, specifications and contracts for work done by, for, or on behalf of the District, as well as to construction or reconstruction hereafter to be accepted into the District system. (Electric Rule 24, Res. 8430) 7.48.030 Overhead Electric Lines - 7.48.030.1 General Order No. 95 of the Public Utilities Commission of the State of California contains the minimum and standard requirements for all overhead electric line construction and reconstruction hereafter done by or on behalf of the District, as well as for any such construction hereafter to be accepted in the District system. 7.48.030.2 The adoption of General Order No. 95 shall apply in the future to any and all amendments as may hereafter be ordered by the Public Utilities Commission, and an up- to -date, true and correct copy of said order and rules, with future amendments, shall be kept at the District office at all times. 7.48.030.3 The requirements of said General Order No. 95 shall hereafter be referred to in all bids, plans, specifications and contracts for work done by, for, or on behalf of the District, as well as to construction or reconstruction hereafter to be accepted in the District system. (Electric Rule 22, Res. 8430, 7/14/75)