HomeMy WebLinkAbout#15 Ed's report
To: Board of Directors
From: Ed Taylor, Water Superintendent
Date: January 12, 2001
Monthly Activity Report
WATER QUALITY
We have monitored the Hirschdale Treatment Plant on a daily basis, and the aesthetic
quality of the water has been excellent all month. Performed preventative maintenance.
Water samples were taken each week during the month. Routine daily rounds were
made, taking chlorine residuals throughout the system.
The monthly bacteriological report was sent to the Department of Health Services.
The District has met the State's drinking water standards for the month.
SYSTEM OPERATIONS AND MAINTENANCE:
Two leaks were repaired.
Two fire hydrants were repaired or replaced.
USA marking for construction projects.
Two test holes were drilled to find a new water source.
Continued the maintenance program on pumps and motors.
Competed work on Master Plan for water.
Worked with Nimbus Engineering on new well locations.