HomeMy WebLinkAbout6 Padmount Switch Bid Agenda Item # 6 R,UCKEE , Public Utility District Memorandum To: Board of Directors From: Sanna Schlosser, Associate Electrical Engineer Date: August 11, 2006 Date of Board Meeting: August 16, 2006 Subject: Padmount Switch Bid Award Recommendation 1. WHY THIS MATTER IS BEFORE THE BOARD Only the Board can approve bid awards. 2. HISTORY The District's purchase of padmount switches is required to meet our customer obligations to provide electric service. 3. NEW INFORMATION Bids have been opened and analyzed for the District's purchase of padmount switches. Attached are summaries of the bid information received. The bid results show the description and quantity of padmount switches required, vendor name, quoted price, delivery mendor desponded to our exceptionsand ny noted b bid and r bid that requirements. We note thaty one v their proposed Schedule C item did not meet our specifications with regards to its overall dimensions. The Schedule F item can be substituted for Schedule. We are frequently faced with the need to utilize padmount switches in quantities that we do not have in stock and as a result are required to go out to bid. Bidding each and every time is an expense to the District and increases the time it takes to purchase padmount switches. For this reason, we requested pricing to be good for a period of one year, from 8/16/06 through 8/15/07. The contract prices shown on the attached Bid Award Recommendation table are good for orders placed until 2/15/07. After this time, our contract allows e vendor to than 8 ply a one-time ercent of the price n t price for the last be less than 5 percentnor greater six months of the contract. 4. RECOMMENDATION 1 recommend the Board award Schedules A, B, D, E and F to Cooper Power Systems with pricing good for one year, with each Schedule subject to a one- time price increase after the first six months as written in the contract. The one-time price increase shall not be less than 5 percent, or greater than 8 percent of the unit price. In addition, I recommend that the Board not award Schedule C because this item did not meet our specifications. I also recommend that the Board order 1 unit of Schedule F in lieu of thel unit that was originally to be ordered for Schedule C. These recommendations are subject to the District's attorney approving the Contract language modifications proposed by Cooper Power Systems. d �j d z f rs1 "6¢ t i i� -�F y; B S)� a i¢ , °ygi s t y A 1dg W-� R� ®R 4 y 9 s s of 41 a t , E �,ga €k " � gaffs 8d%i h }s A Coo er 4 $16.602 B Coo er 3 2 $14,726 $29,452 C - No Award - 1 1 D Coo er 1 $202446 E Cooper 1 $19,194 F Cooper 1 1 $28,157 $28,157 Total of Initial Order $57,609 2006 PADMOUNT SWITCHGEAR BID SUMMARY Bidder Cooper Power Systems Non-Collusion Affidavit Yes Addenda Acknowledged Yes Bid Bond Yes Unit Price Meets Unit Price %Increase Delivery Exceptions Specs. Schedule Switchgear Description - First 6 mos. - Last 6 mos. Time(wks) to Bid Min 5% A 2-600A and 2-200A Fused Switch Positions $16,602 Max 8% 15 Note 1 Yes Min 5% B 3-600A and 1-200A Fused Switch Positions $14,726 Max 8% 15 Note 1 Yes Min 5% C 1-600A and 3-200A Fused Switch Positions $20,795 Max 8% 21 Note 1 No- Switch is too large to fit on concrete pad Min 5% D 2-600A&2-200A VFI Switches w/Elect Controls $20,4 66 Max 8% 21 Note 1 Yes Min 5% LE 3-600A& 1-200A VF1 Switches w/Elect Controls $19,194 Max 8% 21 Note 1 Yes Min 5% F 1-600A&3-200A VFI Switches w/Elect Controls $28,157 Max 8% 21 Note 1 Yes Notes: 1. Cooper took some exceptions to our standard contract. The District's attorney is reviewing their proposed changes. August 11, 2006 I