HomeMy WebLinkAboutThomas,StaffRpt,Feb03
Monthly Activity Report
To: Board of Directors
From: Mark Thomas, Water Superintendent
Date: February 2003
The Distribution Crew changed out 13 commercial meters, installed 2 new services, and
repaired 4 mainline leaks. They also repaired 3 fire hydrants and responded to 39 USA
tickets. The crew spent a lot of their time updating the system map from all the new
construction that went on during last summer.
The Operations Crew has been getting the Glenshire Dr well ready for the pump and motor
that should arrive this month. They have been putting the motors and controls in the Falcon
Point pump station and getting it ready for start-up sometime this month. Also in February,
they put the new 6160 Bridge Street tank in service. They also performed their normal duties
of taking weekly and monthly water quality samples and doing rounds.
Page 1