Loading...
HomeMy WebLinkAbout16 Pioneer Trail Pump Station Award• Tahoe Donner Subdivision • 5,600 single-family residences • 400 multi -family residences • Other development — Clubhouses, golf course, downhill ski area, etc. • 44% of water system customer base • Additional 500 residential units expected at buildout • Served by a single 14-inch diameter pipeline • Two pump stations • Two storage tanks that serve as forebays for the pump stations • Constructed in about 1970 • Approaching end of their useful life • A second pipeline into the Tahoe Donner area is needed • Project identified in the Water System Master Plan • 16-inch pipeline • West end connects to existing 16-inch pipeline in Northwoods Blvd. • East end connects to 24-inch pipeline near Comstock Drive • Downsized from 20-inch pipe identified in the Water System Master Plan • Joint trench including 6-inch electrical & 2-inch communication conduit • 3,000 gpm pump station • Located on District -owned property • Near TNT concrete batch plant • Three contracts previously awarded to outside consultants • Water Works Engineers - Design assistance for Trout Creek crossing and hydraulic transient analysis • Sauers Engineering - Pump station design • Helix Environmental Consulting - CEQA review • CEQA Initial Study/Mitigated Negative Declaration • Made public on March 12 • Public comment period closed on April 12 • Board approval for CEQA purposes on May 4 • Overall project broken into two construction contracts • Pipeline construction - awarded on June 1 • Pump Station construction • Advertising for bids for Pump Station construction contract • Began on June 10 • Bid opening on July 20 at 2:00 pm • Nine bids were received Bidder Location Amount Responsive M-3 Construction Plymouth, CA $2,516,250.00 Yes Koch & Koch Inc Grass Valley, CA $2,541,155.00 Yes KG Walters Santa Rosa, CA $2,606,500.00 Yes Lorang Brothers Colfax, CA $2,700,160.00 Yes Farr Construction Sparks, NV $2,860,350.00 Yes* McCuen Construction Loomis, CA $2,711,929.76 Yes* REM Construction Chico, CA $3,131,001.00 Yes Myers & Sons Construction Sacramento, CA $3,207,464.00 Yes FW Carson Incline Village, NV $3,245,700.00 Yes • Bid price from M-3 Construction is $2,516,250 • Ten percent change order allowance is recommended • Total of authorization of $2,767,875 • Other expenses for outside consultants under existing contracts • Construction inspection • Geotechnical testing • Project budget of $2,865,000 • $350,000 in FY 2022 • $2,515,000 in FY 2023 • Funded by the water new debt issuance • Authorize the General Manager to execute a contract with M-3 Construction in an amount of $2,516,250, plus a ten percent change order allowance for a total authorization not to exceed $2,767,875 for the Pioneer Trail Pump Station project