HomeMy WebLinkAboutWildephor_Truckee Bioenergy Project Scoping Study_TDPUD Board Meeting_2022-08-03_FINALTruckee Bioenergy Project Scoping Study
Update and Recommendations
Prepared by:
Wildephor Consulting Services, LLC
� TRUCKEE DONNER
PUBLIC U'fiLlfiY DlSiRICT
Truckee Donner Public Utility District Board Meeting
3 August 2022
Topics
• Green Waste Disposal
• Candidate Solutions
• Study Refinement Effort
• Potentially Viable Options
• Recommendations
8/3/2022 Truckee Bioenergy Project Scoping Study
Green Waste Disposal
• Initial evaluation of biomass utilization options as
an alternative to landfill disposal
• Town disposing of 25k cubic yards annually;
5,000 green tons / 4,000 bone dry tons (BDT)
• TTSD tipping fee more than doubled since 2018
• Green waste projected to increase by 3x due to
Measure T programs: >$1 MM/year disposal
8/3/2022 Truckee Bioenergy Project Scoping Study
Candidate Solutions
• Evaluated community -scale solutions based on
technology agnostic end products
• Three major solution types considered
A. Disposal
B. Biomass Power
c. Biomass Heat
• Total of seven candidate solutions evaluated as
alternatives to baseline disposal
8/3/2022 Truckee Bioenergy Project Scoping Study
Study Refinement Effort
1. Assess long-term disposal costs at ERL
• TTSD believes tipping fee now stable ($15/CY)
• Have enhanced green waste handling processes
• Cogen plants not viewed as long-term buyers
2. Confirm quality/quantity of TFPD biomass
• Defensible space programs = 1,600 BDT/year
• Treatment of 500 acres/year = 6,400 BDT/year
• Roughly 50% projected to be high quality chips
8/3/2022 Truckee Bioenergy Project Scoping Study
I
4.
Study Refinement Effort
Investigate air curtain burner permitting
• Requires air, water, and chip storage permits
• Permitting not feasible for 2022 operations
• TTSD came to same conclusion for unit at ERL
Evaluate PPAMEM options with TDPUD
• 1 MWe biomass power plant would require PPA
• 150 kWe generator could use net metering
• TDPUD to hire consultant for detailed analysis
8/3/2022 Truckee Bioenergy Project Scoping Study
Study Refinement Effort
s. Inquire into biochar for SB 1383 targets
• Corresponded with program staff at CalRecycle
• Use of biochar does not count toward targets
• Recycled organics must come from permitted MRF
6. Consider hydronic snow melt for TTAD
• Substantial excess process heat may be available
• Could provide snow melt for main airport apron
• TTAD management is interested in exploring idea
8/3/2022 Truckee Bioenergy Project Scoping Study
Potentially Viable Options
• Option A: Biomass Power
• 1.0 MWe gasifier w/engine or turbine generator
• Would consume—6,000 BDT/year of feedstock
• Could supply microgrid during main grid outages
• Option B: Combined Heat and Biochar
• 3.5 MWth pyrolysis plant w/electric generator
• Would consume---9,000 BDT/Year of feedstock
• Modular system could be expanded overtime
8/3/2022 Truckee Bioenergy Project Scoping Study
Potentially Viable Options
A
Biomass Power: SynCraft Gasification System
8/3/2022 Truckee Bioenergy Project Scoping Study
Potentially Viable Options
Bulk char outload
Thermal oxidiser
Feed metering bin
3.5 MW steam boiler
(optional) Spray absorption type
wet scrubber
PER
`�4�
Induced draft fan
CCT 18 Dual
Rotary hearth
\ Control room
Combined Heat and Biochar: Pyrocal CCT System
8/3/2022 Truckee Bioenergy Project Scoping Study
Recommendations
• Detailed feasibility assessment of both options
needed to support capital project decision
• Biochar market study needed to provide basis for
estimating financial contribution
• Nine -month duration; timeline for facility design
and construction additional 18-24 months
8/3/2022 Truckee Bioenergy Project Scoping Study
W