TRUCKEE DONNER P.U.D.—TAHOE DONNER SUBSTATION MAINTENANCE TESTING
Date:July 28, 2022 Quotation Number: Q2022007_r1
Mr. Keith Renshaw
Truckee Donner P.U.D.
11570 Donner Pass Rd.
Truckee, CA 96161
keithrenshaw@tdpud.org
I am glad to provide you with this quotation for services as follows:
This revision is for the updated quotation date and addition of 9 15kV station arresters ($1,360 adder).
Tahoe Donner 60kV—12kV Substation
• Perform maintenance inspections and testing of substation equipment per SOW. Equipment
includes:
o Qty(1)AREVA 72.5kV 1200A Circuit Switcher
o Qty(4)Single Phase 51VIVA 60000—7200/12470Y Transformers
■ Two are GE and two are Uptegraff
o Qty(3 sets) 12kV Voltage Regulator Bypass Disconnect Switches
o Qty(3) Cooper Power Systems 667kVA 7620/13200Y Voltage Regulators
o Qty(9)Single Phase 12kV Isolation Switches—Upstream of Reclosers
o Qty(3) Kyle NOVA15 15.5kV 630A Reclosers
o Qty (9) Single Phase 12kV Isolation Switches—Downstream of Reclosers
■ Note that this is contingent on being able to de-energize the 12kV underground
cables leaving the substation.
o Qty(1)SEL-587 Transformer Differential Relay
o Qty(1)SEL-551 Transformer& Bus Backup Overcurrent Relay
o Qty(1)48VDC Ni-Cd Battery Bank
o Qty(9) 15kV Station Surge Arresters
• Includes one 40ft articulating boom rental for testing, cleaning, inspection of the circuit
switcher. Anticipate 2 days maximum with the boom. Will also use to apply safety grounds
prior to work on the circuit switcher.
• Substation is located off of Skislope Way in Truckee, CA.
Pricing:
Total Price=$50,473
Attachment 1
NorCal Power Services(NCPS)will provide the necessary labor, materials, and test equipment to
perform services per the following Scope of Work. Testing performed using ANSI NETA ATS and/or
MTS specifications.
Scope of Work:
1. SF6 Circuit Switcher XA22
a. Wipe down all bushings and insulators
b. Contact resistance
c. Check mechanical operation manually
d. Check mechanical operation electrically
2. SMVA Oil Filled Transformers
a. Wipe down all bushings
b. Visual inspection
c. SFRA(this would be a baseline test to compare to if SFRA performed after a major fault)
d. Turns ratio
e. Winding resistance
f. Winding power factor
g. Bushing power factor C1 test
h. Exciting current
i. Leakage reactance (measures transformer impedance and compare to nameplate)
j. Insulation resistance
k. Core ground resistance if core ground bushing is accessible
I. Test rapid pressure rise relay if equipped
m. Test oil &winding temp devices if equipped
3. CT's on Primary and Secondary transformer bushings.
a. Single point ground
b. Ratio
c. Winding resistance
d. Excitation
4. 60kV Surge Arresters
a. Wipe down arresters
b. Insulation resistance
c. Watts loss
5. Voltage Regulators
a. Wipe down all bushings
b. Visual inspection
c. Insulation resistance
d. Turns ratio on all taps
e. Winding resistance
f. Contact resistance on isolation and bypass knife switches
6. 12kV Single Phase Knife Switches
a. Visual inspection
b. Contact resistance
Attachment 1
7. Protection relays
a. Record as-found settings
b. Test relay protection settings and logic/trip outputs
8. 48VDC battery bank
a. Specific gravity test
b. Internal impedance
c. Torque check connections
d. Load test battery bank per manufacturer specification
9. 15kV Station Surge Arresters
a. Clean arresters
b. Visual inspection
c. Insulation resistance test on each arrester to ground
d. Power Factor test on each arrester to ground
Client Responsibilities:
• Perform all switching and LOTO functions as needed.
• Provide site access to all equipment to be serviced per the SOW above.
• Provide notification of all necessary job-site requirements prior to performing work.
Clarifications:
• Stand by time for Switching and LOTO functions will be billed at a time and material rate of
$125/hour.
• If any site safety training is required, it will be billed at a time and material rate of$125/hr.
• NCPS will not perform any energized switching. If energized switching is requested, a price can
be provided.
• NCPS will provide (as needed) ground bridals,generators,test equipment, cleaning equipment,
LOTO locks, PPE.
• NO WORK WILL BE PERFORMED ON OR IN CLOSE PROXIMITY TO ENERGIZED CONDUCTORS OR
EQUIPMENT.