Loading...
HomeMy WebLinkAboutRES 2022-16 - Board DocuSign Envelope ID:7lE80FB3-C933-47E0-82D9-597D01C12F14 ._ _CHMENT 1 DistrictPublic Utility Resolution No. 2022-16 APPROVING SUBMISSION AND ATTESTING TO THE VERACITY OF THE 2021 POWER SOURCE DISCLOSURE REPORT AND POWER CONTENT LABEL WHEREAS,the Truckee Donner Public Utility District(District)is a public agency of the State of California,and owns and operates an Electric System for the provision of electric service at retail to the general public within its service area; and WHEREAS,Senate Bill 1305(SB 1305),adopted in 1997 and codified in Public Utilities Code sections 398.1 to 398.5,established a Power Source Disclosure Program that directs all California retail suppliers of electricityto disclose to consumers the sources of energy used to provide the electric service in an accurate and easy to understand manner; and WHEREAS, the California Energy Commission (CEC) regulation implementing SB 1305 requires publicly owned electric utilities, like the District,to have the Board attest to the veracity of the Power Source Disclosure (PSD) Report and Power Content Label (PCL)in lieu of an audit by a third-party certified public accountant;and WHEREAS, District staff accurately prepared the 2021 PSD Report and PCL for submission to the CEC and District customers based on information provided and verified by our electric suppliers including Utah Associated Municipal Power Systems, Western Area Power Administration, Western Electricity Coordinating Council, and a third-party verifier who prepares a report for all electricity transactions and submits this report annually to the California Air Resources Board for Greenhouse Gas Emissions reporting requirements; and WHEREAS,the District generally submits a PSD Report to the CEC by June 1 st of each year, and the PCL is made available to our customers by October 1st of each year in accordance with CEC requirements and deadlines. NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: The Board of Directors approves the submission of the 2021 Power Source Disclosure Report(Exhibit A)and 2021 Power Content Label (Exhibit B)to the California Energy Commission and hereby provides attestation of the veracity of the reports submitted by staff. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 7th day of September, 2022, by the following roll call vote: AYES: President Finn, vice President Bender, Directors Aguera, Laliotis, Harris NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT D..Sign.d by: Byl (,�.ytS}a FiVA& ChristAT'lii'n, President of the Board ATTEST: LS �L�w�t,xait,P ctrssvassxcaaea.. Shanna D. Kuhlemier, CMC, District Clerk 2021 POWER SOURCE DISCLOSURE ANNUAL REPORT SCHEDULE 1: PROCUREMENTS AND RETAIL SALES For the Year Ending December 31,2021 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Retail Sales(MWh) Net Specified Procurement(MWh) r ■ , - - - - - - - - - - - - Unspecified Power(MWh) - • - - Procurement to be adjusted Net Specified Natural Gas - - - - - - - - - - - - - - Net Specified Coal R Other Fossil Fuels Net Specified Nuclear,Large Hydro,Renewables,and ACS Power GHG Emissions(excludes grandfathered emissions) GHG Emissions Intensity(in MT CO2e/MWh) DIRECTLY DELIVERED RENEWAB GHG Emissions State or Gross MWh MWh Net MWh Adjusted Net MWh Factor(in MT GHG Emissions(in MT Facility Name Fuel Type Province WREGIS ID RPS ID N/A EIA ID Procured Resold Procured Procured COze/MWh) CO2e) N/A i eTS EIA ID of EIA ID of GHG Emissions Eligible for State or REC Substitute Gross MWh Net MWh Adjusted Net MWh Factor(in MT GHG Emissions Grandfathered Facility Name Fuel Type Province WREGIS ID RPS ID Source Power Procured MWh Resold Procured Procured COze/MWh) (in MT COze) Emissions? A SPECIFIED NON-RENEWABLE PROCUREMENTS GHG Emissions State or Gross MWh Net MWh Adjusted Net MWh Factor(in MT GHG Emissions Facility Name Fuel Type Province N/A N/A N/A EIA ID Procured MWh Resold Procured Procured COie/MWh) (in MT COie) NIA IL qFJJlq Veyo Heat Recovery Project 26-foot Drop Small Hydro Old Lahontan Hydro PROCUREMENTS FROM ASSET-CONTROLLING SUPPLIERS GHG Emissions Gross MWh Net MWh Adjusted Net MWh Factor(in MT GHG Emissions Facility Name Fuel Type N/A N/A N/A N/A EIA ID Procured MWh Resold Procured Procured COie/MWh) (in MT COie) N/A END USES OTHER THAN RETAIL SALES MWh Transmission Losses Distribution Losses ®' : DocuSign Envelope ID:71E80FB3-C933-47EO-82D9-597D01Cl2Fl4 EXHIBIT A (CONT) Version: May2022 2021 POWER SOURCE • - • - EndingSCHEDULE 2: RETIRED UNBUNDLED RECS For the Year December TRUCKEE D• INSTRUCTIONS: Enter information about retired unbundled RECs associated with this electricity portfolio. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto- populate as needed and should not be filled out. 20,944 RETIRED UNBU State or Facility Name FuelType Province RPS ID Total Retired (in MWh) Horse Butte Wind -REC Only Wind Idaho 62359 113 Trans Jordan Generation Stations-REC Onl Biomass& biowa Utah 61356 512 Pleasant Valley Wind Energy Project-REC C Wind Wyoming 61559 154 Nimbus-WAPA Small Hydro-REC Only Eligible hydro California 61045 151 Lewiston Powerplant-WAPA Small Hydro Eligible hydro California 61044 14 Pleasant Valley Wind Energy Project-REC C Wind Wyoming 61559 20,000 DocuSign Envelope :1 • 1 : D• • D1 EXHIBIT 1 (CONT) Version: May 2022 2021 POWER SOURCE DISCLOSURE ANNUAL REPORT Instructions: No data input is SCHEDULE 3: POWER CONTENT LABEL DATA For the Year Ending December 31, 2021 TRUCKEE DONNER PUBLIC UTILITY DISTRICT needed . suppliers should use these auto-populated calculations to fill out their Power Content Labels. Adjusted Net Percent of Total Procured (MWh) Retail Sales 74,661 48.0% Biomass & Biowaste26,030 16.7% Geothermal 0' Eligible Hydroelectric2,159 1.4% Solar 0' Wind46,472 29.9% Coal 0' Large Hydroelectric 0'. Natural gas16,203 10.4% Nuclear 0'. Other • Unspecified Power54,871 35.3% Total 155,582 438 Total Retail Sales (MWh) GHG Emissions Intensity(converted to Ibs COZeIMWh) Percentage of Reail S tales Covered bI Iliy Retired Unbundled RECs DocuSign Envelope ID:71E80FB3-C933-47E0-82D9-597D01C12F14 EXHIBIT B 2021 POWER CONTENT LABEL Truckee Donner PUD www.tdpud.org Greenhouse Gas Emissions Energy Resources . • . 2021 CA Intensity(lbs CO2e/MWh) TDPUD 2021 CA Utility Average Eligible Renewable' 48.0% 33.6% Power Mix Biomass&Biowaste 16.7% 2.3% 438 456 Geothermal 0.0% 4.8% 1000 Eligible Hydroelectric 1.4% 1.0% Solar 0.0% 14.2% 800 ■TDPUD Wind 29.9% 11.4% Power Mix Coal 0.0% 3.0% 600 Large Hydroelectric 0.0% 9.2% 400 - ■2021 CA Natural Gas 10.4% 37.9% Utility Nuclear 0.0% 9.3% 200 Average Other 6.3% 0.2% 0 Unspecified Power2 35.3% 6.8% TOTAL 100.0% 100.0% Percentage of Retail Sales Covered by Retired Unbundled RECs 3: 13.5% The eligible renewable percentage above does not reflect RPS compliance,which is determined using a different methodology. 2Unspecified power is electricity that has been purchased through open market transactions and is not traceable to a specific generation source. 3Renewable energy credits(RECs)are tracking instruments issued for renewable generation. Unbundled renewable energy credits(RECs) represent renewable generation that was not delivered to serve retail sales. Unbundled RECs are not reflected in the power mix or GHG emissions intensities above. For specific information about this Truckee Donner PUD electricity portfolio, contact: (530) 587-3896 For general information about the http://www.energy.ca.gov/pcl/ Power Content Label, visit: For additional questions, please Toll-free in California: 844-454-2906 contact the California Energy Outside California: 916-653-0237 Commission at: