Loading...
HomeMy WebLinkAbout8 Attachment 2 Church Street Contract Amendment Attachment 2 TRUCKEE DONNER PUBLIC UTILITY DISTRICT 2022 Contract Amendment This Contract amendment is entered into as of the by and between the Truckee Donner Public Utility District, a California local public agency ("DISTRICT") and The Town of Truckee, a Municipal Corporation ("Town"); with regards to Section 1: Recitals including: H: TDPUD agrees to reimburse the Town of Truckee to construct approximately 505 linear feet of utility trench along Church Street between the existing District owned utility vault, located near the intersection of Church Street and Flyers Knot Way, and the new utility vault installed by the Town's contractor approximately 505 feet east of that intersection on Church Street. The Town of Truckee agrees to cover the cost to construct approximately 155 linear feet of utility trench along Glenshire Drive from the previously agreed upon underground to overhead transition utility pole, 155 feet west to the new transition pole location. Both utility trenches shall include one six inch, one four inch, and one two inch TDPUD conduits constructed and installed to meet TDPUD standard specifications. The District has approved an amendment to the contract for The Church Street Extension project with the Town of Truckee for an additional Dollars ($ ) for a total contract amount not to exceed Dollars ($ ) at the current contract terms and conditions. Both parties mutually consent to this contract amendment. The signatories hereto represent that they are authorized to enter into this agreement on behalf of the party for whom they sign. Brian C. Wright Jen Callaway General Manager Town Manager Truckee Donner Public Utility District Town of Truckee Attachment 2