Completion of the Water SCADA ACTION ITEM #17 December 7, 2022 Replacement ProjectCompletion of the Water SCADA Replacement Project
•BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement ProjectWater SCADA Replacement Project Operator Interfaces•Automated Controls•Communication Networks•Servers/Databases•Computer
Systems•Distributed Network of:•(SCADA)cquisition Aata Dnd Aontrol Cupervisory S
Water SCADA Replacement Project BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement Project
•BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement ProjectWater SCADA Replacement Project Energy usage•Motor runtime hours•Ground water production•Data collection•Water
system pressure Remote operator interface•Water quality treatment•Process monitoring•Valve and tank level set points•Pump and motor controls•System Automation•SCADA System Capabilities
•BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement ProjectWater SCADA Replacement Project Department of Water Resources (DWR)•State Water Resources Control Board (SWRCB)
•Regulatory reporting•Asset lifecycle replacements•Maintenance and rehabilitation schedules•Predictive maintenance and replacements•Safety•Improved response times•Reduced travel•Operational
efficiency•System trends (water production and demand trends)•Pump/Energy efficiency•Performance analytics•SCADA System Benefits
•BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement ProjectWater SCADA Replacement Project Outdated and unsupported software systems and hardware components•Limited availability
of engineering and technical support•Incompatibility of disparate systems•Challenges faced by the District•Hybrid SCADA system–Donner Lake •Sierra Controls–Glenshire System •Sandel
Avery SCADA –Truckee Main System •capabilities of the existing water SCADA systemsIn 2009 the District began the process of evaluating the performance and
•BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement ProjectWater SCADA Replacement Project the remainder of the projectThe District chose not to pursue Phase 3 and opted
to hire internal resources for •remaining systemsProject management of design and installation of the –(Optional) Phase 3 •RTUsDesigned and prepare specifications with cost
estimates for first 10 –Phase 2 •System and infrastructure assessments–Phase 1 •Scope of Work•Systems, LLC. In 2009 the District approved an engineering services contract with Carollo
Water SCADA Replacement Project BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement Project
Water SCADA Replacement Project BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement Project
Water SCADA Replacement Project BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement Project
Water SCADA Replacement Project BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement Project
•BACKGROUND / HISTORYBACKGROUND / HISTORY Water SCADA Replacement ProjectWater SCADA Replacement Project Transition planning•Quality control and testing•Design and installation of redundant
communication networks•Compatibility and integration of existing infrastructure•Engineering of automated controls and programming logic•Project included•District’s Water SCADA Replacement
Projectprocess of carrying forward the development and construction of the In 2012 the District hired an automated controls engineer to begin the
•NEW INFORMATIONNEW INFORMATION Water SCADA Replacement ProjectWater SCADA Replacement Project Tahoe Donner Phase 3•Tahoe Donner Phase 2•Tahoe Donner Phase 1•Truckee Main System (Groundwater
Wells, 6170 Tank)•Prosser Heights/Prosser Lakeview•Sierra Meadows•Glenshire•Donner Lake/Armstrong•Replacement Project in 8 phasesBeginning in 2012, the District completed the Water
SCADA
Water SCADA Replacement Project NEW INFORMATIONNEW INFORMATION Water SCADA Replacement Project
•NEW INFORMATIONNEW INFORMATION Water SCADA Replacement ProjectWater SCADA Replacement Project Multiple Operator Access•Fully customizable programming logic•Network Security Systems•Radio•Microwave•L
TE/Wireless Internet•Fiber Optic•Redundant communication systems•49 RTUs•56 Water facilities and control points•Engineering, Water Utility and Electric TeamsScope of project was a sizeable
undertaking for the District’s IT,
Water SCADA Replacement Project System Overview NEW INFORMATIONNEW INFORMATION Water SCADA Replacement Project
Water SCADA Replacement Project and Control ParametersOperational Set Points NEW INFORMATIONNEW INFORMATION Water SCADA Replacement Project
Water SCADA Replacement Project Accessibility NEW INFORMATIONNEW INFORMATION Water SCADA Replacement Project
Water SCADA Replacement Project Performance Analytics NEW INFORMATIONNEW INFORMATION Water SCADA Replacement Project
•NEW INFORMATIONNEW INFORMATION Water SCADA Replacement ProjectWater SCADA Replacement Project the legacy SCADA systemReplacement Project with the final switch over of the last facility
from In November 2022 District Staff officially completed the Water SCADA
•FISCAL IMPACTFISCAL IMPACT Water SCADA Replacement ProjectWater SCADA Replacement Project sufficient which is currently deemed included $112,486 in FY24, escalating +4% each year
thereafter; Financial Master Plan as part of the 2022/2023 Budget cycle year water capital improvement plan included in the -10The •2023 maintenance capital, and is deemed sufficient
for 2023 Budget included $108,160 for Water SCADA The •system address aging Water SCADA continue to need annual maintenance capital to systematically With completion of the 2022 subject
project, the District will
•RECOMMENDATIONRECOMMENDATION Water SCADA Replacement ProjectWater SCADA Replacement Project Accept this report and provide feedback to staff