To: Board of Directors
From: Doug Grandy, Chairperson
Date: January 23, 2008
Conservation Committee Monthly Report
1. Committee meetings
a. Minutes of Nov 12, Dec 6 meetings
2. Future meetings set: Thursday Feb 7th, Tues March 4th, Thursday April 3rd, Tues
May 6th, Thursday June 5th, and Tuesday July 1 st
3. Christmas light program results
4. Conservation measures from E3 model — Progress to date
5. Communications Issues
6. Water and Power Conservation Plan progress
Conservation Committee
Monday November 12th 2007
Meeting start 6:13pm
Attendance: Tom Gorin, Gerald Herrick, Ben Benson, Brian Woody, Doug Grandy, Rolf Godon, Anna
Demm, Joanna Walters, Jim Booth
I. Call to Order- Joanna calls meeting to order 6:08
II. Oct 11th meetings still need to be approved via email.
III. Public Input
IV. Meetings were called in response to the last board meeting. Robert Mowris' presentation to the
board went well and they would like more information to review for 2008 budget. On Friday a
meeting was held with Alan to discuss how the public benefit money was going to be allocated in
reference to the numbers that were requested in Robert Mowris plan. Alan Harry directs $175,913 of
the money to Steve Hollabaugh for purchase of renewable energy. That money is to buy power that
is part of the normal energy portfolio. Another$175,000 is directed to wire to water. Total public
benefit funds $549,103; however a portion is deducted to cover staff costs. Net public benefit money
is $476,913.
Truckee Energy Challenge and Green Neighborhood was not allocated a lot of money because Alan
Harry did not think the program was thought through and developed enough. So $1,000 was
allocated to help with planning. Schools were allocated $20,000 to provide one grade level
presentation material for energy and water conservation ideas in the home. The Green building plan
was not accepted by Alan Harry because he was concerned that it involved town building code and it
would be difficult to monitor.
The public benefit number is determined by calculating 2.85% of the previous year's sales.
Wednesday November 141h there will be a meeting with the general manager, the President of the
Board of Directors and staff for the PUD to discuss the programs and costs associated with the
conservation committee. The possible agenda items are not limited to the Robert Mowris list of
recommendations.
The committee can call it an interim recommendation so that the remainder of the time that the
committee has can be spent refining and adding more items. This document should not be
considered the final committee recommendations. However getting programs and conservation
committee ideas in the 2008 budget would be a win and would give the community a head start.
Adding green power and tiered rates should be added to the document to present all the major
concepts the committee is currently working on. Additionally a marketing plan needs to be
developed to cover all the programs. A program is only as good as the marketing attached to it.
Complete program/item list that need funds allocated.
■ Tiered Rates for Electric and Water
■ Green Neighborhood
■ Rebate programs
■ Low Income assistance programs
■ Appliance Recycling
■ Truckee Climate Challenge Items fall under"Programs"
■ Green Partners
■ Energy Audits of the largest consumers to reduce w
■ Green Schools
■ Green Builder
■ Million CFL program
■ CFL Recycling Program
• SW Gas CO2 redu Program
■ Holiday LED Light swap 10 2007 budget ($7,500)
■ Website/ Marketing Plan with Marketing specific to Conservation
■ Load Study
Taking the list above and removing all items that can not be classified as a program- below is the
table of line items. All items not listed as a specific line item are grouped under Programs
Item Est. Budget Request Proposed Allan
budget
Wire to water 0 $175,000
Supply Contracts 0 $175,913
Programs listed above $425,000 $118,500
Tiered Rates 0
Load Study $50,000
residential/commercial
Marketing Plan $75,000 $7,500
Voluntary Green program 0
All programs must have a marketing and measure attached to it- to determine success and
conservation effects. The Marketing Plan above is to cover a comprehensive conservation
message. Each program would also have to support itself with money allocated to marketing. It is
crucial that the PUD no longer spend any of the Public Benefit fund towards purchase of power
(supply contracts) and replacement of well pumps.
Rate increase in electric will occur because of an increase in energy cost. $40 is the current contract
that expires on 12/31/07. The same contract would increase to $75 for 2008.
Doug Grandy moves to accept the above list and table with the addition of the material Robert
Mowris presented and as packaged by Eric Perlman . Jim Booth 2nds. A discussion about the list,
potential conflicts, options, etc ensued. Joanna Walters calls a vote. No one opposed, all in favor.
Doug Grandy wanted to make clear to the committee that his presentation to the board on Monday
would be affected by the Wednesday meeting. The committee communicated their understanding
and acceptance that Doug Grandy could represent the committee as a whole.
Meeting was adjourned 9:10pm.
Conservation Committee Minutes
Monday December 6th 2007
I. Call to Order- Joanna calls meeting to order 6:15pm
II. Roll Call- Attendance: Anna, Tom, Rolf, Scott, Eric, John, Ben, Joanna, Gerald, Christa, Ronnie,
Doug, Tony Paulson
III. Minutes for November 6th and November 12th were passed out. No one had any additions,
corrections or alterations to the October 11th and November 6th. October 11th and November 6th
minutes were both presented to the board. They have been accepted by the committee and are
of record. A conversation regarding details of the November 12th minutes occurred. Changes
were requested to clear the language around the cost of power per megawatt hour. Christa
made a motion to accept the minutes and Gerald 2nd; all passed minutes were accepted with the
changes to the November 12th pending.
IV. Future meeting dates were set Tues Jan 8th, Thur Feb 7th, Tues March 4th, Thur April 3rd, Tues
May 6th, Thur June 5th, and Tues July 1 st(if needed).
Scott handed out a summary list of "measures" (residential and commercial) recommended for
maximum benefit as defined by the e3 manual condensing a list of over 5,000 measures. It was
suggested the committee review the list and remove any measures that do not make sense for
Tahoe area and add any items that have been left off. The list was discussed and refined. All
the remaining items need to be prioritized, researched and developed further prior to
presentation to the board as recommendations for rebates or other programs.
V. Doug Grandy reviewed the material presented to the board. This information was a compilation
of the committee's input and PUD staff input. Everything was well received from tiered rates to
marketing plan. A handout was presented listing each item and a recommendation for action.
Joanna passed out the document that was created from the Robert Mowris document and the 2
meetings in November. Many of the individual programs that we talked about were grouped into
larger sub-headings to make it more concise to present. For example, Live Smart covers all
residential energy saving programs. The board expressed appreciation for the work and time of
the committee members. Progress was made and a much larger conservation budget will be
spent on energy saving programs and measures in '08 compared to `07.
VI. Tony Paulson, SunEdison was the guest speaker. He spent about an hour discussing the solar
energy industry and the various methods of entering the system. Sun Edison is the largest solar
energy service in the U.S. Active in 7 states, with 101% output (versus contract requirements)
and output of 70 megawatts all from 100% PV. Based on research, experience and
maintenance Sun Edison receives on average 20% output from their panels. Sun Edison just
installed a merchant based plant, 7.2 megawatt facility in Colorado. A merchant plant is a power
plant that was built based on the guarantee of a business to purchase the power. The model that
Sun Edison follows is to own and operate equipment/facility and then sell power to a 3rd party.
Sun Edison has bought $1 billion in panels. The company is able to supply inexpensive panels
that connect to a larger system. The investors in Sun Edison carry the risk and gain the tax
benefits from the green power. This takes all the risk off the local municipal. We are no longer
limited to the 1 to 1.5 megawatt.
Power Purchase agreements with developers have worked extremely well. A developer building
a 30,000 household community partners with Sun Edison to build a "farm" next to the
community. The community then has a 20 year contract to buy X amount of power from Sun
Edison. Fresno is committed to going green using the community choice aggregation model.
They are financially strapped, there is limited opportunity. A solar plant or green farm offers
local opportunity and a chance to minimize the impact on the environment that the local
community relies so heavily on. There is a cost deferential and coal is cheaper now, but it will
not be for long. 7 acre = about 1 megawatt. Sun Edison signs 20 year contracts because the life
time of the equipment is about 25 years. The pricing for green power is competitive with the
goal of staying level with all brown power prices increasing annually. Costs for green power
moving forward are fixed in the building and maintenance of the farm. The question is what is
your game plan in 20 years? Coal plants are on the way out with more closing every year
increasing the demand and cost for gas. Building the power plants where the power is needed
reduces the cost of transmission and reduces the energy lost in transmission. The goal for Sun
Edison is to match PV with a fuel cell that equals the load of the community. Sun Edison can
support the committee with information and numbers to help present ideas for entering the green
power market. When you make big changes you receive big impact. Sun Edison is only
focusing on the biggest deals that offer the most impact.
A discussion ensued regarding the hurdles and opportunities of building a green power farm
locally. Someone suggested the 15 acres that Old Greenwood donated to the town would make
a great spot for a farm. Energy is the only industry that is not distributed; the decisions need to
be fiscally minded.
The committee is interested in the concept of pursuing the idea of a green power farm, more
research and consideration needs to occur before this is presented to the board as a
recommendation.
VII. Subcommittee reports
Strategy met with the Alan and John Ulrich to discuss the structure of tiered rates. Low income
would need a special category if we don't do tiered rates so they would be protected against a
big bill increase. The remaining details still need to be worked out. Since the fixed costs are
covered by the kilowatt-hour customer cost- if you reduce consumption you will need to replace
the money. During the meeting a list of customer consumption was presented, the committee
was surprised by some data. The structure of the rates is still TBA. In the Committee's
recommendations, there are expected to be 3 tiers.
Outreach reported that of the 500 LED, only 350 remain. The program has been positive and it
has people talking about LED lights!
Doug passed out Alan's list of communication requirements and advised the committee on the
requests from Alan Harry regarding committee member communication and behavior. The
feelings of the Committee are that we have not had to ask Alan for permission to access public
information before. The board approved the use of the Yahoo site, which Alan now refuses to
use. Alan's message was nothing is going to happen without a directive from the board. The
committee agreed that the issue of communication with the staff was too important and that the
matter should be presented to the board for resolution if we can't work out something more
reasonable with staff.
Vill. The meeting was adjourned 9:19pm
TDPUD Conservation Committee
Residential Measures
Appliances Space Cooling,
Clothes WashersX Ceiling Fans
DishwashersX Shade Screens
RefrigeratorsX Whole House Fans
Cooking Equipment Solar Attic Fans
Swamp Coolers
Building_Efficiency Window Treatments- tinting
Attic/Ceiling Insulation
Caulking/WeatherstrippingX Space Heating
Floor Insulation Air Duct LeakageX
Wall Insulation Air Duct ReplacementsX
Windows Blower Door Air Leak TestingX
Ground Source Heat PumpX
Electronics Programmable Thermostats
Phantom Load Strategies Solar Thermal for Space Heating
Battery Charging Systems
Digital-Analog Converter Boxes Water Heating
Cordless Phones EE Water HeatersX
TV/VCR &TV/DVD Combo Units Non-Electric Water Heaters
External Power Adapters Water Heater Wraps
Home Audio Solar Water Heating
Televisions EE Hot Tubs (pumps/motors)
VCRs
Distributed Generation
Lighting Solar Photovoltaics
Ballasts
CFLsX
Exit Signs
Fixture Retrofit
Lamp Replacement
Lighting Controls
TDPUD Conservation Committee
Commercial Measures
Appliances
Clothes Washers, Dishwashers, RefersX Photocells
Glass Doors on Open Display Cases HID- Int. Pulse Start
Strip Curtains on Walk-in Boxes HID Fixtures
Insulated Hot Food Cabinet- EE Case Lighting- Electronic Ballasts
Insulated Hot Food Cabinet- High Perf. Metal Halide Pulse Start Ret. Fixture
Display Case w/Doors- Low Temp Ceramic Metal Halide(CMH)Fixtures
Display Case w/Doors- Med. Temp
Motors
Building Efficiency High Efficiency Motors
Door Gaskets High Efficiency Pumps
Door Auto-Closers
Space Cooling
Electronics Programmable Thermostat
Computers Chillers w/VFD & w.o./VFD
Copiers & Fax Machines Split System Air Conditioner
Digital Duplicators Unitary Air Conditioner
External Power Adapters Package Terminal AC
Notebook Computers/Tablet PCs Package Terminal, Split System&
Mailing Machines Unitary Heat Pump
Monitors Ground Source Heat PumpsX
Printers, Scanners, All-in-Ones Evaporative Condensers
Water Coolers Window Films
Lightin&X Space Heating
Exit Signs- LED Programmable Thermostat
Channel Sign- LEDs Central FAU Distribution LeakageX
Channel Sign- Replacement Ground Source Heat PumpsX
Channel Sign- Retrofit
Replacing Incandescents Water Heating
Replacing with CFLs & LEDs High Eff. Electric Water HeatersX
Incandescent to Mercury Vapor EE Non-Electric Water Heaters
Fixture Replacements
Fixture Replacement- Lin. Fluor. Distributed Generation
Hard-wired Fluorescent Fixtures Solar Photovoltaics
Incandescent- Ext. Pulse Start
Fixture Replacement- CFLs Energy/Load Management
Lamp & Ballast Retrofit Energy Management Systems
Lamp & Ballast Retrofit- Dimming Summer Peak Load Controls
Lamp & Ballast Retrofit- Non-Dimming
Lamp Removal Other
Induction lamps &Fixtures Compressed Air Systems
Occupancy Sensors Time Clocks- 7 Day wBack-Up