Loading...
HomeMy WebLinkAbout2014-10-15 Min - Board BOARD ACTION MINUT ORDERS : 10115/2014 ACTION ITEM CONSIDERATION OF A RESOLUTION TO COMMEND PAUL ROSE FOR HIS MANY YEARS OF SERVICE This item involves adopting a Resolution for Paul Rose 's retirement. Director Aguera moved , and Director Hemig seconded , that the Board adopt the Resolution 2014 -21 recognizing Paul Rose for his many years of service . ROLL CALL : Director Ellis , absent ; all other Directors aye , by voice vote . SO MOVED ROUTINE BUSINESS TREASURER ' S REPORT M0201 t 79 APPROVAL OF THE FUND BALANCES AS OF AUGUST 31 , 2014 : Director Bender moved , and Director Aguera seconded , that the Board approve the treasurer' s report for the month ended August 31 , 2014 . CALL : Director Ellis , absent ; all other Directors aye , by voice vote . SO MOVED . APPROVAL OF DISBURSEMENTS FOR SEPTEMBER 2014 Director Aguera moved , and Director Hemig seconded , that the Board ap pr ove the September 2014 disbursements report . ROLL CALL ,* Director Ellis , absent ; all other Directors aye , by voice vote . SO MOVED .. APPROVAL OF MINUTES FOR SEPTEMBER 10 , 2014 Director Bender moved , and D irector Hemig seconded , that the Board approve the minutes of September 10 , 2014 . ROLL CALL : Director Ellis , absent ; all other Directors aye , by voice vote . SAO MOVED . M02014W80 CLOSED SESSION PURSUANT TO GOVERNMENT CODE 54956 . 9 ( D ) ( 1 ) , CONFERENCE WITH I EGAI COUNSEL ON EXISTING LITIGATION : SIERRA PACIFIC POWER CO/DBA NV ENERGY TRANSMISSION RATE CASE , CASE NO . ' S ER - 13 - 1605 M02014 -81 The District received resolution on the Transmission Rate Case filing , Docket No . ER13 - 605 - 000 , The settlement of the case for the combined system as of January 1 , 2014 is : ot • $ 2 . 65 for Network Transmission Service per KW/month $ 85 . 00 for Schedule 1 Dispatc c e u ing per W/month • $ 300 . 00 for Schedule 2 -reactive Supply per month • $ 7500 for Schedule 3 -Voltage Control per MW/month The settlement rates are approximately 400 , 000 less to the District annually compared to the filed tariff rates . The Board vote for the settlement was yes for Directors Aguera , Bender , Hemig and Laliots . Director Ellis was absent . 1 D NNER T. RU.CKEE 0 1 D " PLlb ic Ut ! it istricst 11570 Donner Pass Road Truckee , Ca . 96161 Minute Order October 15 , 2014 MO 2014 = 81 CLOSED SESSION PURSUANT TO GOVERNMENT CODE 54956 . 9 ( D ) ( 1 ) , CONFERENCE WITH LEGAL COUNSEL ON EXISTING LITIGATION : SIERRA PACIFIC POWER CO/ D A NV ENERGY TRANSMISSION RATE CASE , CASE NO . ' S R:,w13 = 1605 The District received resolution on the Transmission Rate Case filing , Docket No . R13s. 1605 "* 000 . The settlement of the case for the combined system as of January 1 , 2014 is : :0 • $ 2 . 65 for Network Transmission Service per KW/month • $ 85 . 00 for Schedule 1 Dispatch & Scheduling per MW/ month o $ 300 . 00 for Schedule 2 - reactive Supply per MW/month e $ 7500 for Schedule 3 -Voltage Control per MW/month The settlement rates are approximately $400 , 000 less to the District annually compared to the filed tariff rates . The Board vote for the settlement was yes for Directors Aguera , Bender , Hemig and Laliots . Director Ellis was absent . 11570 Donner Pass Road — Truckee , CA 96161 Phone 530 587-3896 — Fax 530 587- 1189