HomeMy WebLinkAbout1994-01-16 Truckee Donner Public Utility District
Board of Directors
Joseph R, Agues
BusinessJ. Ronald Hernig
Robe Off ice Planning Services jarnes A. Jones
(9 )587-389 (918) 587-3944 FAX(918)587-505 Parisi A. Maass
Sutton
Patricia S. Sutton
General Manager
Meter L. Holzmeister
REGULAR MEETING
7:00 PM, Monday, January 16, 1994
TDPUD Board Room
AGENDA
1. Call to order
2. Roll call
3. Public input (7:25 PM or as soon thereafter as possible) - Any member of the audience
desiring to address the Board regarding a matter on the agenda is welcome to do so. Matters not
specifically listed on the agenda may be brought up under public input.
UNFINISHED BUSINESS
4. Prosser Water System improvement Project - consideration of Progress Payment No. 8
5. Workshop on productivity- improvement and cost control:
a) Discussion of focus of Board of Directors,possible direction regarding Board meeting schedule
b) Discussion of program for productivity improvement and cost control within District departments
ROUTINE BUSINESS
6. Consideration and possible approval of minutes of January 3, 1995
7. Consideration and possible approval of bills
& Correspondence
9. Staff reports
CLOSED SESSION
10. Conference with legal counsel, existing litigation between TDPUD and Sierra Pacific
Power Company, two cases, Government Code Section 94956.9(a)
RETURN TO PUBLIC SESSION
11. Possible action resulting from closed session
ADJOURNMENT
NOTE The complete packet of material relating to the agenda is available for review at
the PUD office and at the Truckee Library
post office Box 309 11570 Donner Pass Road a Truckee, Calornia 96160
Posted and ailed on anuary 12, 1995
AI
Susan M. Craig, Deputy District Cier
REGULAR MEETING
January 16, 1995
In accordance with District Code Section 2.08.010 the TDPUD azinutes are action only
minutes. Ail B and mee ins are recorded on audio tapes which are preserved
.perpetually and made availabl for listenin to an inter sted art u on their request
The regular meeting of the Board of Directors of the Truckee Donner Public Utility District
was called to order at 7:05 PM in the TDPUD Board Room by President Jones.
ROLL CALL: Directors Joe Aguera, Ron Hemig, Bob Jones, James Maass and Patricia
Sutton were present.
EMPLOYEES PRESENT: Susan Craig, Steve Hollabaugh, Peter Holzmeister and Scott
Terrell.
CONSULTANTS PRESENT: Attorney Steve Gross.
OTHERS PRESENT. There were no others present in the audience.
PROSSER WATER SYSTEM IMPROVEMENT PROJECT - CONSIDERATION OF
PROGRESS PAYMENT NO. 8
Periodic Estimate No. 8 covers the installation of the guard rail as approved in Contract
Change Order No. 4 and the completion of electrical work at the Prosser Heights
Hydropneumatic Station and Prosser Annex Well.
Director Maass moved, and Director Aguera seconded, that the Board approve Periodic
Estimate for Partial Payment No. 8 in the amount of$2,892.16 to Wunschel & Small, Inc.
on the Prosser Heights Water System Improvements. All Directors, aye, by voice vote.
SO MOVED.
WORKSHOP ON PRODUCTIVITY- IMPROVEMENT AND COST CONTROL
Discussion of focus of Board of Directors; possible direction regarding Board
meeting schedule
The Board discussed re-engineering, its benefits and what processes at the TDPUD could
be re-engineered. The Directors considered having one workshop meeting per month at
which the Board would receive and review reports from staff on the status of projects and
programs in the departments. It would be an informal meeting much like a committee
meeting; no decisions or motions would be made; minutes would not be kept. The
workshop would be a publicly noticed meeting with opportunity for public comment. The
other meeting each month would be a business meeting with a formal agenda and
motions and minutes. It would be conducted just as the meetings are at present. This
change would result in the Board refocusing from ministerial to policy matters; and there
could be a significant cost reduction or savings in staff and consultant time.
1/16195 Page 1
Director Maass moved that, effective in February, the first Board meeting of each month
. be a business meeting and that the second meeting be a workshop meeting. This will be
done on a trial basis; when the Board becomes comfortable with the procedure, a change
to the By-laws will be proposed. Director Aguera seconded the motion. All Directors, aye,
by voice vote. SO MOVED.
Discussion of program for productivity improvement and cost control within
District departments
Process or organizational re-engineering is a procedure producing top to bottom
organizational transformation. It starts by looking at the type of business and then decides
on the most cherished values. It then looks at the tasks being performed and measures
them against the values. If the tasks do not add value to what needs to be accomplished,
they are eliminated. Staff wants to take a serious look at how the District does business
and make changes where necessary. The Board needs to be involved in the process, to
grant authority and to support the effort.
After some discussion, the Board concurred that staff be authorized to evaluate the
benefits of deep organizational change and to join in the process. Specific discussion
items will be brought to the Board during the next several months for consideration and
approval.
• PUBLIC INPUT
Ron Hemig advised that he is resigning as President of the Chamber of Commerce on
January 19, 1995, Ron Florian will complete his term. He noted this will remove any
possible conflict with his directorship on the PUD Board.
CONSIDERATION AND POSSIBLE APPROVAL OF MINUTES OF JANUARY 3, 1995
Director Maass moved, and Director Hemig seconded, that the Board approve the
minutes of January 3, 1995 as corrected. All Directors, aye, by voice vote. SO MOVED.
CONSIDERATION AND POSSIBLE APPROVAL OF BILLS
Director Aguera moved, and Director Maass seconded, that the bills presented for
consideration be approved for payment. All Directors, aye, by voice vote. SO MOVED.
CORRESPONDENCE
There was no correspondence discussed by the Board.
STAFF REPORTS
. A complete copy of the staff report is attached to these minutes.
Gooseneck Ranch annexation
1116195 Page 2
Briefly discussed was LAFCo's interest in taking a broad look at the environmental issues
. involved in the development of Gooseneck Ranch. This could seriously complicate the
annexation process and may influence the developers to seek water service elsewhere.
Director Maass moved, and Director Aguera seconded, that the Manager be authorized
to contact appropriate counsel to discuss the matter and to place the item on a future
agenda under closed session as potential litigation. All Directors, aye, by voice vote. SO
MOVED.
CLOSED SESSION
There was no closed session.
ADJOURNMENT
There being no further business before the Board, Director Maass moved that the
meeting be adjourned at 8:47 PM; seconded by Director Aguera. All Directors, aye, by
voice vote. SO MOVED.
TRUC .E DONNER PUBLIC UTILITY DISTRICT
k
Robert A. Joni`, P "dent 1
Prepared by
Susan M. C aig, eputy District Clerk
smc
1116195 Page 3
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
BILLS FOR BOARD APPROVAL - JANUARY 16, 1995
TOTAL ELECTRIC WATER DESCRIPTION
---------------------------------------------------..____.._.._----------------------------•---
MBNA AMERICA BUSINESS CARD 31.46 31.46 HOLZMEISTER LUNCH WITH MAASS, AGUERA
HOLLABAUGH AFTER NCPA COMMISSION MEETING.
SAUERS ENGINEERING INC. 14,060.50 14,060.50 PROP 55 (8675.00) MISC REQUESTS (81.25)
GROUNDWATER MANAGEMENT (537.50) LAFCO
ANNEXATION APPLICATION (1813.00) 80/89/267
UTILITY CONSTRUCTION (1050.00) PIPELINE
REPLACEMENT CONSTRUCTION (303.75)
HIRSCHDALE ROW (1600.00).
TRANS-CYCLE INDUSTRIES INC 8,799.70 8,799.70 TRANSPORTATION AND DISPOSAL OF OBSOLETE
ELECTRICAL EQUIPMENT.
WEAVER EQUIPMENT CO. 4,280.00 2,140.00 2,140.00 RENTAL OF JOHN DEERE WHEEL LOADER
EQ# 94151 FOR THE MONTH OF JANUARY 1995.
-- ---27,171.66 10,971.16 16,200.50
y
TDPUD STAFF REPORT
January 13, 1995
TO: Board of Directors
FROM, Peter L. Nolzmeister, General Manager
SUBJECT: Manager's Report
AGENDA # 9
Negotiations with IBEW
During December, 1 began to meet with the union committee to negotiate a new
Memorandum of Understanding. Mary Chapman, Bob Quinn and Kathy Neus are helping
me. The sessions have been productive in that the two sides are clarifying their positions.
Truckee River Operating Agreement
Pat Sutton and I are continuing to participate in the Truckee River Operating Agreement
discussions. My involvement has now turned to the issue of storage of the surface water
allocation. The entire TROA process is complex and will require years to complete. The
variety of interests who are participating is remarkable. The meetings are interesting
because of the divergent views that are starting to be voiced. It is critical that TDPUD be
actively involved in TROA.
Gooseneck Ranch annexation
Keith Knibb and I are working on the initial documents for the annexation of Gooseneck
Ranch. We have held discussions with S. R. Jones, the executive director of Nevada
County LAFCo, and we are beginning to think that LAFCo may take a very broad look at
the environmental issues involved in the development of Gooseneck Ranch. We at first
thought that LAFCo would limit its review to water issues; we now believe they may look
at all environmental issues. This would seriously complicate the annexation process and
may influence the developers to seek water service elsewhere.
Groundwater management plan
I spent time during December dealing with the draft groundwater management plan and
I have been asked to make a presentation to the Truckee River Basin Water Group on
our plan. I am having discussions with John Falk of the Tahoe Sierra Board of Realtors
because of their continued concem over land use issues. I feel sure that John will be
asking us to clarify our intentions in this regard. This matter will come back to the Board
. again.
Transmission study
The transmission study being conducted by NCPA, SPPCo and PG&E is nearing
completion. SPPCo is taking less and less a pure technical view and is more and more
adopting strategic postures. Steve Nollabaugh and I will attend a meeting in San
Francisco on January 17, 1995 along with staff from NCPA, SPPCo and PG&E to discuss
the final transmission model. We are not optimistic that the meeting will result in
agreement. The technical study is very tight and is not consistent with the position taken
by SPPCo. If a serious disagreement is going to occur, it will happen at this meeting.
Ford Construction
The dispute with Ford Construction over funds withheld by us has been resolved as was
discussed with the Board. Steve Gross helped by drafting a mutual release of claims
which was signed by Don Ford; a check has been sent to him.
Board meetings
We have held two Board meetings recently with difficult agendas. Those tough issues are
behind us now and I think we will be able to turn our attention to the 1995 programs.
PLN/smc
Truckee Donner Public utility District Board of Directors
Joseph R. Aguera
J. Ronald Hemig
Business Office Planning Services Robert A. Janes
(916) 587-3896 (916) 587-3944 FAX (916) 587-5056 James A. Maass
Patricia S.Sutton
General Manager
Peter L. Hoizmeister
ADMINISTRATIVE SERVICES: January, 1995 STAFF REPORT
Submitted by Mary Chapman, January 12, 1995
CUSTOMER SERVICE ACTIVITY:
Service order transfer requests have slowed down considerably. Mark is working on
preparing the second write-off list for 1994. Request for authorization to write-off delinquent
accounts will appear on the next agenda.
To date, the front office has received the following calls in regards to the rate restructuring:
1. One complaint from a Tahoe Donner resident.
2. An inquiry from a Tahoe Donner resident who after finding out that the difference
in his bill would be so nominal, commented that he didn't understand what all the
fuss was about.
3. We received another inquiry from a primary resident in Tahoe Donner who was
told that all Tahoe Donner residents would be paying the higher cost per kilowatt-
hour.
In addition, we received three calls from Glenshire residents. Rosana calculated bill
comparisons for each of them. They were all pleased that they would be paying a lower
amount for the same usage.
And, finally, we received our first completed "Customer Suggestion" form. I have attached a
copy for your review. It appears that the customer receives water service from the Del Oro
Water Company and is not happy about their new water rate increase.
BILI_1NG:
The billing department is on schedule. Rosana is working on closing the billing records for
1994. She is also working with Orcom to assist us with program changes to accommodate
the electric rate restructuring. The newly structured rates will allow us to break down the
customers' billing components more clearly on their bills. The current rate structure has
always confused our customers. There will be a lot of work to do in the next couple of
weeks to change customer billing rate schedules.
We will also be sending out billing confirmation requests as part of our annual audit.
Customers are asked to confirm that their account balance as of December 31, 1994,
matches the District's records. Any variations are researched. Variations are almost always
a timing difference between when the customer mailed their payment and when it was
received.
Post Office Box 309 • 11570 Donner Pass Road Truckee, California 96160
.......................
ACCOUNTING:
Accounts Payable, Payroll and General Ledger/Budgeting are all on schedule. We are
currently working on completing the December financial records and reports.
We have also prepared all of the audit confirmation letters that we send out each year to
verify loan balances, bank balances, litigation status, and amounts owed to various vendors.
We compare the responses with the District's records and reconcile any differences.
1995 BUDGET:
The "1995 Budget" books have been revised and are in final adopted form. The electric
revenues were revised to reflect the restructured rates. The water revenues were revised to
reflect the water rate increase and the reduction in pumping costs due to the decrease in
commercial rates. The budget carryovers from 1994 were also incorporated into the 1995
budget numbers.
OTHER ITEMS:
I am currently updating the 1991 Water System Improvement Project records to submit to
Rauscher Pierce R.efsnes, so that they can perform the arbitrage penalty calculation for the
period ended November 14, 1994.
We are also updating our insurance specifications in order to get updated quotes for property
and liability insurance coverage. Our current policy expires April 30, 1995. It always takes a
long time to obtain the quotes, so we are beginning now.
0195M O LY.RPT
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
CUSTOMER SUGGESTION FORM
Dear Customer:
we are interested in your suggestions. Pease feel free to make any comments
or suggestions regarding the quality of service that you receive from our
staff or regarding the District policies and procedures . The District' s
purpose is to serve the needs of the co-�-nunity and each of you. Your input
will help us serve you better.
UALITY OF SE -ICE:f
I'MIELINESS OF SERVICE:
PFULNESS OF STAFF:
U
1
ELECTRIC SERVICE_COMME ITS:
WATER SERVICE COMM TS: /
CUSTOMER NAME (IF DESIRED) �rui (� '— I vJ P DATE
PHONE NUMBER SERVICE LOCATION
The T.D.P.t3,n. Board of Directors meets each is and 3rd Monday of each month
at 7 : (lfl P.M. The public is welcome to attend ch meeting.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
PLANNING SERVICES DEPARTMENT ACTIVITIES
DECEMBER 1994
New Construction
Development Agreements- Working with 24 new developments this year. Continuing
to work on S developments carried over from the 1993 construction season.
New Construction Services- Completed the processing of 3 new applications for
electric service and completed 26 permanent new construction services and 3
temporary power hook-ups. Completed orders for 3 water hook-ups and 2 water
service upgrades.
Work Order Processing- Work orders are continuing to be closed for the year-end
and preparations are being made for the 1994 audit.
Communications/Education
Newsletter- The Current Issues Winter edition is currently being worked on. Articles
may include the new water and electric rates, portion of Glenshire addition, and
transmission access.
End-Use Survey- We should expect the end-use survey reports from NCPA by
February. A copy and explanation of these reports will be provided to the Board.
Conservation
Ground Source Heat Pump Pilot Project- Seven of the ten pilot site heat pump units
have arrived in Truckee. Truckee trained GSHP contractors are currently installing
the units. Five pilot site units are currently in operation. Two additional manufact-
urers have donated a total of three GSHP units for the pilot program for installation
next summer. We will continue to solicit "new" manufacturers to participate in our
pilot for at least another year or two.
GSHP Grant Funding- TDPUD and SMUD have received a final draft contract from
the California Energy Commission(CEC). The contract is expected to be ready for
signature in early 1995. The grant money will be used to implement the monitoring
and evaluation of each utility's perspective pilot programs. The Department of
Energy(DOE) has not made a decision as of yet to provide TDPUD and SMUD with
$20,000 grant monies for the pilots.
Energy Surveys/High Bill Assistance- Staff completed 0 commercial and 4 residential
energy surveys this month. Staff also responded on-site to 0 "high" bill complaints in
December. There are currently no requests pending.
Energy Efficiency Partnership- The incorporation of the energy and water efficiency
measures are expected to be retrofitted into the Chamber building by Spring, 1995.
Staff will soon be working on a plan to educate our customers on energy and water
efficiency and using the Chamber building as the demonstration site.
Low-Income Weatherization Services-- NCPA has completed a final draft of
TDPUD's Low Income Weatherization Plan as required by SB t601. Staff is
currently reviewing this draft. This proposal involves evaluating the cost--effectiveness
of providing low-income weatherization services to all-electric homes in the TDPUD
service area.
Energy/Water Showcase Program- Staff recently spoke with the CEC representative
for the Showcase Program. He advised us that we will be receiving a letter from him
soon regarding our need to identify what assistance we will need from them. We are
currently working with the Water and Electric Departments in reviewing current plans
for efficiency upgrades of the water system as well as any other potentially cost-
effective measures.
Emplo eve Safety
Wellness Program- The NRECA b% medical discount for the TDPUD Wellness
Program has already gone into effect. About 25 employees participated in the
Wellness Program health screenings. About 20 employees participated in a healthly
meals breakfast.
...............................
TOFUD STAFF REPORT
January 12, 1995
TO. Board of Directors
FROM. Kathy Neus, Support Services Manage
SUBJECT. December Staff'Report
A G�EII�' IDA
BUILDING AND GROUNDS MAINTENANCE
Staff is keeping all entrances and walkways clear of snow.
PURCHASING AND WAREHOUSING
Joe is working on reorganizing material to make room for summer. We are planning to
stage material for the crews so when they have a job, all necessary material is in one
place.
VEHICLE MAINTENANCE
Tom was kept busy doing scheduled maintenance during December. When the weather
turns bad and the crews are busy doing storm related work, Tom stays alert for any
vehicle problems that might arise. Fortunately, there were no problems.
METER READERS
1. The month of December was a real challenge for the Meter Readers. One of the
staff members is out on disability and, with the bad weather, they are scrambling
to stay current. No routes or books were estimated. There are a few inaccessible
meters due to snow; there are also a number of buried water meters.
2, For the month of December, there were 48 low usage checks, 312 service reports,
216 forty-eight hour notices and thirteen 1013 disconnects.
December was a short month with the holidays and, overall, with the exception of meter
reading, the department was relatively quiet.
KN1smc
STAFF REPORT
January 9, 1995
To. Board of Directors
From. Bob Quinn, Electric Superintendent
Subject: December Report A GE,,':NDA:ITEM]
41
During December, members of the electric department had an opportunity to take somewhat of
a breath as no major projects came in and others seemed to ease a little due to the holidays
and the inclement weather. The following is a listing of events that did take place during
December.
In Tahoe Donner along Skislope, crews worked to gain space on the poles to give cable
TV and telephone proper clearance.
Along Northwoods Blvd., crews worked installing facilities for three triplexes being
constructed
In the alley behind commercial row, a deteriorated pole was changed out and a new
transformer bank installed to facilitate re-storing pennanent power to the new building
that is replacing the old Masonic building destroyed in the gas explosion .
idle facilities were removed across the street from the Martis Theater.
A secondary pole and related spans of secondary wire were installed in Tahoe Donner.
At the equestrian center in Tahoe Donner, fused cut-outs were replaced and protection
for this portion of Tahoe Donner Circuit #2 was placed on a pole mounted recloser.
Wthin Tahoe Conner substation, the SCADA antennae was replaced as the signal has
been giving intermittent data. This has been an ongoing problem and staff is working to
resolve problems with this hybrid system.
Receptacles were installed in the TDPUD yard to facilitate plugging in heaters for the
generator truck and other equipment.
A pump motor was removed and replaced at the Pinnacle booster station.
A new heater was installed at the Ski Lodge booster station.
New sensors were installed at the Airport and Northside stations for totalizer meters
. The meter at the Southside booster station was repaimca!
............:.....
The meter installations at various well and booster sites were checked for possible
future installation of demand meters.
Metering for Southern Pacific RXR at the old mill site downtown was removed.
A starter for the mechanics bay exhaust fan was installed.
At the Innsbrook booster station an hour meter was installed and defective start delay
timers replaced.
Control work at the Alder Creek pump station was accomplished
The meter installation at Pizza Junction was rewired.
Transformers in the substations were checked for nitrogen pressure and tilled as
required.
A broken insulator on a switch was found in Martis substation and replaced
Martis Ckt.#4 recloser control was giving erroneous readings and found to have a
dysfunctional battery pack. Repairs were made.
The power logger was installed at two locations at staff request
Base maps for the ACAD were installed and mapping of TDPUD facilities commenced
Construction standards are being prepared.
A new joint pole agreement is being drafted.
Snow removal within the substations was an ongoing task
28 service orders and 8 underground facility locates were accomplished.
in addition to the projects listed above, the District experienced several outages during
December.
On Pinnacle in Tahoe Donner, crews re-fused the line four times as a result of high
winds and snow: This area MY have to have facilities reconfigured when time and
weather permit.
On Sunday,December 4th, weather again created problems for the District. At approx.
6.30 AM the transmission line from the summit failed and Tahoe Donner and Donner
Lake substations were without power for 5 minutes until the source could be routed
from Reno. At 7.00 AM crews were called in to respond to numerous outages. In the
Prosser, Tahoe Donner, and Donner Lake areas, snow shedding from the lines created
14 different outages. These problems were easily remedied but were extremely time
consuming as a result of road and weather conditions. At Donner Lake a more serious
incident occurred when a tree fell from the high winds and tore down primary and
secondary lines. Repairs were made and crews were routed to another location at
Conner Lake to repair another fallen line. Crews were released at 2:30 PM to return
home.
On December 5th weather again caused concern. On Northwoods Blvd an insulator
failed from snow load and had to be replaced. Two other locations in Tahoe Donner
experienced outages from snow shedding from lines.
At 12:30 All of December 14th, 9 western states experienced a power failure that, to
this date, is not totally explained. Our Mattis substation tripped off on an under-
frequency alarm. After re-setting the relay, power was restored to the community at
approx. 2:00 AM.
On December 16th, another transmission failure occurred on the line feeding Tahoe
Donner and Donner Lake substations. Power was restored after an outage of 5
minutes. Cause of the outage is unknown, however, Sierra states it was on the PG8
system.
At 4AM on the 21st, another insulator failed in Tahoe Donner. This outage was on a
tap line and the situation was corrected with a 1 hour outage.
During the Christmas weekend, and as a result of the heavy weekend occupancy,
Tahoe Donner circuitry experienced several nuisance trips. After investigations, the
substation controls were reprogrammed for the much heavier load and the problems
ceased. These controls were monitored throughout the holiday period and no further
problems occurred.
As you can see, we did not rest on our laurels during December but were kept busy
responding to the needs of our consumers. Weather was a critical factor as was the holiday
schedule.
Truckee Donner Public Utility District Board of Directors
Joseph R. Aguera
J. nonaid Heniig
Business Office Planning Services Robert A. Jones
(916) 587-3896 (916) 587-3944 FAX (916) 587-5056 James A. Maass
Patricia S. Sutton
General Manager
Peter L. Holzmeister
Water Department Monthly ACtivitz. es Report
anuary 10, 1995
DEC-EMBER 1994
..ATER QUALITY:
See attached bacteriological report .
Received Volatile Organic Contaminant (v0C 502 .2 ) back from
AnLab for Prosser Annex Tank. We have received approval from
Jess Morehouse to bring the tank on line. We are awaiting the
installation of the SCADA controls by SA Engineering before
proceeding.
1'�'AINTENANCE, REPAIRS & NEW CCNSTRUCTION:
The Holiday period was very quiet .
We have had a few calls to assist customers in locating their
service boxes to turn their ;cater off for home water line
repairs .
The temperature has been mild and the snow depth adequate to
prevent freezing of District service lines, thus we have not
had a single frozen pipe call that was our responsibility.
New service hookups continue to come in though at a reduced
rate. Staff made 3 new service connections and 2 service
upgrades in December .
Unfortunately, main line failures never stop, staff repaired
& leaks . Our response time from date of report to time of
repair in most cases is Less that 48 hours .
Staff repaired 2 broken fire hydrants and did 4 U.S .A.
locations .
Water Dept . Staff members logged 70 hours on the leased loader
removing snow from the District ' s facilities .
The Dept . still has one employee out on Workmen' s Camp with a
knee injury.
Post Office Box 309 11570 Danner Pass Road ® Truckee, California 96160
�tiTA TER PLANNING DE pA TMENT.
See attached report from Mike Connell, Water Dept . Planner for
active new construction projects .
Four staff members attended the Nevada State GIs (Geographic
Information Systems) annual conference in Sparks Nevada .
I am continuing dialog and research into the District ' s
acquisition of property from the Raley ' s Estate for the
Hirschdale water treatment plant . it is beginning to appear
that the most economical and simple approach for the
District, would be to agree to remove abandoned vehicles from
the estate .
Lakeside Touring charges $80 . 00 to remove abandoned vehicles
and they do all the paperwork. Neil Doerhoff, the Raley ' s
Estate representative has indicated that in the last five
years he has had to remove about 1.5 vehicles .
Additionally, Raley' s has been installing a series of gates to
limit access to certain areas of the ranch. Depending on where
they are it may substantially decrease the scope of our
liability should the District consider this arrangement .
PUMP OPERATIONS:
In the absence of a harsh (cold) winter, customer related
problems are at a minimum. This affords us the opportunity to
transfer some of our work effort indoors for maintenance and
house keeping on the pump stations .
Pete Marcovich and Steve Hollabaugh are developing strategies
to help reduce the District ' s peak electric demand using the
SCADA system to control pump operation cycles . The program
though still in its infancy has shown to have the potential
for substantial cost savings .
A down hole video was performed on Sanders Well which
indicated a need for some well rehabilitation work before
installing a new pump. With Sanders Well still off line,
Prosser Heights Well is the sole source of supply for this
service area. To date it has operated without incident .
see attached report from Pete Marcovich Water Operations
Specialists .
..............
t r"uchee Donner" Public Utility District Board of Directors
Joseph R.Aguera
John L.Corbett
Business Office Engineering Services Robert A.Jones
(916)587-3896 (916) 587-3944 FAX(916)587-5056 James A. Maass
Patricia S. Sutton
General Manager
Peter L. Holzmeister
MFMORANDLRY1
Date: January 6, 1995
From: David Ru1ly
To: Peter Holzmeister
Subject : Monthly Bacteriological Report - December 1994
Attached is the " Summary of Bacteriological Water Quality" report
for the month of December 1994
The December portion of the report shows that all 33 distribution
system samples were free of coliform bacteria. The report also
shows that all 13 source samples were free of coliform, bacteria .
The district has met the State ' s drinking water standards for the
month of December.
Past Office Box 309 11570 Donner Pass Road a Truckee, California 96160
0 0 0
TRIJCKEE DO 9ER PUBLIC UTILITY DI TRICT
System Source
Samples Portions Percent Samples Portions Percent
Yr . /Month C0l Posi iv Collet ed Positive Flo S hive
1994
November 2 (� /�
.4P 10 0 0
(Truckee) 0 0 5 0 0
(Prosser) 1 0 0
(Hirschdale) 1 0 0
1994
December
25 0 0 S 0 0
(Truckee) 0 0 4 0 0
(Prosser) 1 0 0
(Hirschdale) 1 0 0
Truckee Donner Public Utility District 13o,d of DiJoseph r�9�era
J. Ronald r-iamig
Business Office Planning Services Robert A.Jones
(916) 587-3896 (916) 587-3944 FAX (916) 587-5056 .lames A. Maass
6i Patricia S.Sutton
General Manager
Peter L. Nolzmeister
MEMORANDUM
Date : January 10, 1995
From: Mike P--C---
To : Dave
Subject : Work Activities for December 1994
In addition to the everyday work related to customer complaints
and questions, I worked on the following specific projects :
1 . Martis Valley Ground Water Management Plan
Nature of w rk Pe form d
Worked with SAVERS ENGINEERING, HYDROSEARCH, and District
management .
2 . Commercial Service Upgrades
* Best Western Motel - Upgrade/Relocation
* Coachland Mobile Home Park - Upgrade/Relocation
Mature of Work Performed
Designed meter installations and worked on pressure related
problems . Ordered materials and coordinated contractors work.
3 . Hospital District Professional Bldg.
Professional medical building located across from the
Hospital. Administration building. The Hospital District is
the developer. Units in this project may be sold to private
parties.
Nature of work Performed
Reviewed project application & discussed with staff .
Post Office Box 309 11570 Donner Pass Road Truckee, California 96160
Monthly Activities Report
January 10, 1995
Page 2
4 . GIS Systems Conference
This was a training conference/seminar that will
enhance our abilities and applications for the new GIS system.
5 . Truckee Pines
* .04 Unit affordable housing complex, located on Estates
Drive next to the Senior Citizens complex.
Nature of Work Performed
Development agreement application review. Contact with project
representatives and other agencies .
6 . District - IBEW Negotiations
* Participated in the negotiation process as a member of
the union negotiating committee .
7 . District discussions concerning Development
Agreements
* Reorganization and redistribution of tasks related to the
development process .
Nat re of wo k Per armed
and discussions related to assessing and
Participated in meetings
implementing value added tasks to this process .
8 . Mapping Systems
Nature of Work Performed
Worked with Steve Hollabaugh acquiring base maps for GIS system.
9 . Christmas/ New Years Holidays
Nature af W rk Performed
Opened presents and watched a lot of football .
Truckee Donner Public Utility District Board of Directors
Joseph R. Aguera
J. Ronald Hemig
OA Business Office Planning Services Robert A. Jones
(916) 587-3896 (916) 587-3944 FAX (916) 587-5056 James A. Maass
Patricia S. Sutton
General Manager
Peter L. Holzmeister
MEMORANDUM
Bate: January 11, 1995
To: Dave Ru .ly
From: Peter Marcovich�
Subject: Monthly Report for December 1994
STATION MAINTENANCE
A rebuilt Nu-Matic compressor was installed in Sitzmark Hydro
Station.
The small booster pump and motor were removed, rebuilt and
installed at Pinnacle Hydro Station.
A new pump and motor for booster #2 was installed in Martis woods
Station.
Booster pump control valve #4 was rebuilt in Soma Sierra Station.
Snow removal, throughout the month, was done at all of our
booster stations by the water crew.
Hour meters for several boosters were replaced throughout the
system.
Monitored and adjusted sand separator at the Airport Station.
Installed new time relays in Innsbruck Station and Soma Sierra
Station.
Post office Box 309 11570 Donner Pass Road s Truckee, California 96160
..........................
WATER QUALITY
Water samples were taken the four tuesdays of the month. Routine
daily rounds were rude, taking chlorine residuals throughout the
system.
pROSSER HEIGHTS/NO OTHER WAY
The water quality samples for the new tank on No other Way have
been completed. In approximately two weeks the SCALA system will
be installed at this site, collecting real time data and the tank
will be brought on line .
The guard rail at Prosser Heights Well was installed the first
week of December . It has been hit several times over the month
and a section of rail has been ordered for replacement.
The Prosser Heights Hydro Station pressure has been trouble free
the entire month.
Began preliminary
Hydrowork
station installation
storage the
tankDonsystem
Noother
Prose g
Way.
0 OTHER BUSINESS
Researched and correlated data regarding pressure problems
at the
de
Best Western Motel . Reconfigured pumping parameters
Tank in an effort to reduce the surging.
Developed pumping strategy to offset anticipated high electric
peak demand over the New Year weekend.
Researched data and prepared reports for our confined space
program, motor duty cycles and tank levels during the summer,
well data for Northside and Sanders and water production from all
sources for the month.
Completed weekly water personnel standby calendar for the entire
year of 1995.
Gave direction and began the training of one of the two water
helpers in as many aspects of system operation and SCADA
interfacing as possible while completing necessary station
maintenance.
Attended the G. I . S. conference in Reno .
Continued discussions with Sandel-Avery Engineering regarding
0 ongoing site problems and programming.
WATER PRODUCTION GALLONS
#A" Well . = a . I I e . . . . a . . . . . . . > . . . . . ® 0
Presser Heights Well . . . . . . . . . . . . . . . 6, 035, 452
Sanders We?. . . . . . . . . . . s . . 0
"B" well . . . . . . . . , a a a . . . . . . 0
Donner ` reek Well . . . . . . . . . . . . . . . . . . . 0
Airport Well . . . . . . . . . . . . . . . . 50, 254, 000
Kirschdale Well . . . . . . . . . . . . . . . 120, 200
Nortl2s1_de Well . . . . . . . . . . . . . . . . . . 101: 200, 000
Sf uthside Well 41 . . . . . . . , 0
TOTAL PRODUCTION FOR DEG ER 1994 . . . . 66, 609, 652
The graph below indicates the percentage of total production from
each source for the month of December.
Vo of Monthly Production by Sour
DECE BER 1994
(75.4%)
FiMi A IRPORT WELL
PROSSER HEIGHTS WELL
ORTHSIDE WELL
HIRSCHDALE WELL