Loading...
HomeMy WebLinkAbout1995-07-03 Agenda Packet Truckee Donner Public Utility District 8.,dof Directors joseph R.Aguera j. Ronald Hemig Business Office Pianning Services Robert k Jones (916) 587-3896 (916)587-3944 FAX(916) 587-5056 james A. Maass 1)Oa Patricia S.Sutton General Manager REGULAR MEETING Peter L. Holzmeister 7.00 PM, Monday, July 3, 1995 TDPUD Board Room AGENDA 1. Call to order 2. Roll call 3. Public input (7:25 PM or as soon thereafter as possible) - Any member of the audience desiring to address the Board regarding a matter on the agenda is welcome to do so. Matters not specifically listed on the agenda may be brought up under public input UNFINISHED BUSINESS NEW BUSINESS 4. 1994 Water System Improvements Project, Prosser Water System: a) Consideration and possible approval of a contract change order b) Consideration and possible approval of a partial pay estimate C) Consideration and possible approval of a resolution accepting the project as complete and directing the filing of the Notice of Completion 5. 1995 Well Pump Improvements Project., a) Consideration and possible approval of a contract change order b) Consideration and possible approval of a partial pay estimate C) Consideration and possible approval of a resolution accepting the project as complete and directing the filing of the Notice of Completion 6. Hirschdale Water Treatment Plant Project: a) Status report b) Consideration and possible adoption of a resolution approving plans, specifications and contract documents and issuing a call for bids 7. Consideration and possible approval of a resolution directing that competitive bidding be dispensed with in connection with the District's purchase of reclosers and recloser controls 8. Consideration of an agreement between the TDPUD and Plumas-Sierra Rural Electric Cooperative 9. Consideration and possible approval of a resolution issuing a call for bid for poles 10. Gooseneck Ranch annexation application, status report and possible direction Post Office Box 309 0 11570 Donner Pass Road 0 Truckee, California 96160 i ROUTINE BUSINESS 11. Consideration and possible approval of minutes of Jane 5 and 19, 1995 12. Consideration and possible approval of bills 13. Correspondence ADJOURNMENT !VOTE: The complete packet ofmaterial relating to the agenda is available for review at the PUD office and at the Truckee Library Posted d mailed n June 30, 1995 Susan M. Craig, Deputy Distri Clerk RESOL TION NO. 951 OF THE TRUCKEE DONltiaiER: PUBLIC. UTILITY DISTRICT ACCEPTING:THE PROPOSITION '55, SAFE DRINKING;WATER BOND LAW:`1994 WATER`SYST,EM lMPROYEMENTS PROJECTf PROSSER 1N TER SYSTEM#, AS COMPLETE:AND DIRECTING THE FILING OF THE NOTICE OP COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to go forward with the 1994 Water System Improvements Project which consisted of construction of the Prosser Heights hydropneumatic pump station, the Prosser Annex well and storage tank, approximately 3,900 lineal feet of pipeline, road construction, site work, installation of a sand separator at the Airport well and other related work; and WHEREAS, the Contract was awarded to Wunschel & Small, Inc., P. O. Box 799, Fair Oaks, California 95628 and the contractor entered into an agreement with the District to perform the work, and WHEREAS, the District's Consulting engineer, Sauers Engineering, Inc., has recommended that the work be accepted by the District, NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the District hereby accepts the Proposition 55, Safe Drinking Water Bond Law 1994 Water System Improvements Project. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the all% retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within said District on the third day of July 1995 by the following roll call vote: AYES: Hemig, Maass, Sutton and Jones. NOES: None. ABSENT. Aguera. TRUCKEE DON R PUBLIC UTILITY DISTRICT By Peter L. Holz is er, Cle Ex-ofcio"Secretary RTTES Su n A Craig, Deputy District Clerkj RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the TRUCKEE DONNER PUBLIC UTILITY DISTRICT, Post Office Box 309, Truckee, CA 96160. 2. That on July 3, 1995 the hereinafter described improvements were accepted as completed pursuant to a resolution of the Truckee Donner Public Utility District, the awarding authority. 3. That the subject improvements of the Notice are generally described and identified as follows: 1994 Water System Improvements Project. 4. That the name of the contractor for such project was: WUNSCHEL & SMALL, INC., P. O. Box 799, Fair Oaks, California 95628. Dated: 7 ZZS TRUCKS DONNER PUBLIC UTILITY DISTRICT By d` Peter L. Holy eister, General Manager STATE OF CALIFORNIA COUNTY OF NEVADA On Julyj�,1995,before me,Susan M.Craig,personally appeared PETER L. HOLZMEISTER,personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. Capacity claimed by signer: Corporate officer- Clerk/Ex-offlcio Secretary of the Truckee Donner Public Utility District. Witness y hand d offic I seal, �l St1SAN M.CRAIG 994485 Susan M. Craig, Notaryml — # a No#ory RubIIc—ColftTia NEVADA COUNTY My comm.Expires MAY 29,1997 RESOLUTION 'NO 951 8 OF TIME TRUCKEE DONNER PUBLIC .U.TILITY DISTRICT M ACCEPTING THE PROPOSITION 55, SAFE DRINKING WATER.BOND LAW 1.995 WELL PUMP IMPROVEMENT PROJECT AS COMPLETE AND? DIRECTINGG THE' FILING OF THE NOTICE OF COMPLETION. WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to furnish and install a pump and electrical and piping facilities in the new Prosser Annex Well and replace a well pump and substantial electrical equipment at the Northside Well, and WHEREAS, the Contract was awarded to Clayborn Contracting Group, Inc., Drawer 106203, Auburn, CA 95602 and the contractor entered into an agreement with the District to perform the work; and WHEREAS, the District's Consulting engineer, Sauers Engineering, Inc., has recommended that the work be accepted by the District; NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the District hereby accepts the Proposition 55, Safe Drinking Water Bond Law 1995 Well Pumps Improvement Project. 2. That the Clerk of the District be directed to fife with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the 10% retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within said District on the third day of July 1995 by the following roll call vote: AYES: Hemig, Maass, Sutton and Jones. NOES: None. ABSENT: Aguera. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Peter L. Holzmeister, C erk/Ex-officio Secretary ATTES Susan M. Craig, Deputy Distri Clerk RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96166 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the TRUCKEE DONNER PUBLIC UTILITY DISTRICT, Post Office Box 309, Truckee, CA 96160. 2. That on July 3, 1995 the hereinafter described improvements were accepted as completed pursuant to a resolution of the Truckee Donner Public Utility District, the awarding authority. 3. That the subject improvements of the Notice are generally described and identified as follows: 1995 Well Pumps Improvement Project. 4. That the name of the contractor for such project was: CLAYBORN CONTRACTING GROUP, INC., Drawer 106203, Auburn, CA 95602. Dated: - `' _ TRUCKEE DONNER PUBLIC UTILITY DISTRICT By 1W e�o Peter L. Holz eister, General Manager STATE OF CALIFORNIA COUNTY OF NEVADA On JulY6, 1996,before me,Susan M.Craig,personally appeared PETER L.HOLZMEISTER,personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. Capacity claimed by signer: Corporate officer- Clerk/Ex-officio Secretary of the Truckee Donner Public Utility District. Witness y hand a d officia at. . SUSAN M.CRAIG COW 994485 Susan M. Craig, Notary , # Nofi�y pubic—COfomka i NSYA€3A COUNTY tiny Comm.E ®s MAY 29,1997 ESD ; }�`1C311 N 9519 O THE TRUCKEE ONNER Pt E3 lC C1T' 1FY l TR CT It ECT vG T COMPETITIVEB►DDING $E DISPEJVsED.wt W i CONNECTION WITH 'THE DISTRICT'S PURCH SE O .REEL€?SERS AND RECL<OSER ONTROL;S WHEREAS, the Truckee Donner Public Utility District has determined the need to acquire Cooper Power System reclosers and microprocessor-based recloser controls, and WHEREAS, Public Contract Code Section 20206.4 generally requires that the District seek competitive bids in connection with the purchase of goods; and WHEREAS, various California court decisions, including Graydon v. Pasadena Development A.cent 105 C.A. 3d 631 (1980), hold that if the subject of a contract is such that competitive proposals would be unavailing or would not produce an advantage, and the advertisement for competitive bid would thus be undesirable or impractical, a public agency may dispense with competitive bidding; and WHEREAS, the District has a large investment in the Cooper Power Systems reclosers and • controls, using them exclusively; and WHEREAS, the exclusive use of Cooper Power System reclosers and controls reduces costs in inventory of parts; and WHEREAS, the exclusive use of Cooper Power System reclosers and controls allows for inter- changing within the system; and WHEREAS, the exclusive use of Cooper Power System reclosers and controls does not require additional training of District personnel; and WHEREAS, the exclusive use of Cooper Power System reclosers and controls will be more compatible with future SCADA plans; and WHEREAS, the exclusive use of Cooper Power System reclosers and controls has the potential of shortening outages by staff being familiar with the same equipment from station to station; and WHEREAS, due to the facts set forth above, competitive bidding would be unavailing and would not produce an advantage to the District, and the advertisement for competitive bids and the delay that would therefore result, would be undesirable; • NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the recitals set forth above are adopted as findings and for the reasons set forth herein finds that competitive proposals for the above described electrical apparatus would be unavailing, would not produce an advantage to the District and the advertisement for competitive bids and the resulting delay would be undesirable. 2. That District staff is hereby authorized to dispense with competitive bidding and purchase Cooper Power System reclosers and microprocessor based recloser controls at this time and in future years. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 5th day of July 1995 by the following roll call vote: AYES: Hemig, Maass and Jones. ABSTAIN: Sutton. ABSENT: Aguera. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Peter L. H zmeisfer, Clerk of the Board ATT Susan M. Craig, Deputy Distric ierk smc ESOLUTIO li O. 9520 OF THE TR .J'CKEE DONNER PUBLIC UTILITY DISTRICT 1SSU1NG A CAALL FOR::BIDS..ON POLES WHEREAS, the Board of Directors of the Truckee Donner Public Utility District has determined the need to purchase its annual supply of poles and funds have been set aside in the 1995 budget for the purchase of such poles; NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Truckee Donner Public Utility District does hereby authorize staff to issue a call for bids based on the District's standard specifications for poles, and that the date and time established for the bid opening is August 1, 1995 at 2:00 PM. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 5th day of June 1995 by the following roll call vote: AYES: Hemig, Maass, Sutton and Jones. • NOES: Norse. ABSENT: Aguera. TRUCKE DONNER PUBLIC UTILITY DISTRICT By Peter L. H lzmeister,eClerk of they Board ATT Susan M. Craig, Deputy Di ct Clerk smc TRUCKEE DONNER PUBLIC UTILITY DISTRICT BILLS FOR BOARD APPROVAL - JULY 3, 1995 TOTAL ELECTRIC WATER DESCRIPTION ------------------------------------------------------------------------------------------ ARTHUR ANDERSEN & CO. 3,300.00 1,650.00 1,650.00 FINAL AUDIT BILLING AND ASSISTANCE ON PROPERTY ACCOUNTING. CARSON-BROOKS PLASTICS INC. 4,287,47 4,287.47 ELECTRIC INVENTORY SUPPLIES. ➢ECUIR & SOMACH 2,526.68 2,526.68 LEGAL SERVICES IN CONNECTION WITH GOOSENECK RANCH. GOODYEAR WHOLESALE TIRE CENTERS 5,692.97 5,692.97 TIRES FOR INVENTORY. HEAVY EQUIPMENT INC. 9,804.70 9,804.70 WATER CONNECTIONS. KING WIRE & CABLE CORP. 4,075.50 4,075.50 CABLE FOR INVENTORY. ,TAMES MAASS 63.06 63.06 NCPA COMMISSION MEETING IN ROSEVILE. PENNINGTON CROSSARM CO. 4,882.25 4,882,25 CROSSARMS FOR INVENTORY. PORTER SIMON - MAY 1995 11,838.00 8,315.20 2,522.80 BOARD MEETINGS (550.00) GENERAL REPRESENTATION (8586.00) SIERRA PACIFIC POWER (70.00) SUGAR PINE ESTATES (1554.00) TFH - MEDICAL BLDG 1406.00) GATEWAY WATER TANK (672.00). PORTER SIMON - JUNE 1995 5,642.00 3,945.20 1,696.80 GENERAL REPRESENTATION (3906.00) BOARD MEETINGS (742.00) TFH - MEDICAL BLDG (252.00) SUGAR PINE ESTATES (588.00) GATEWAY WATER TANK (154.00). R SUPPLY COMPANY INC. 9,485.53 9,485.53 WATER INVENTORY SUPPLIES. SAUERS ENGINEERING INC. 48,825.61 48,825.61 PROP 55 (39075.001 TRUCKEE PINES WATER NETWORK (500.00) MISC REQUESTS (237.50) LAFCO ANNEXATION APPLICATION (287.50) HIRSCHDALE TREATMENT ENG (6250.00) TRUCKEE FALLS GOLF COURSE (437.50) PARKING ALTERNATIVES (1550.61) WATER RIGHTS STUDY (487.50). SECURITY CONTRACTOR SERVICES INC. 5,501.86 5,501.86 SHIELD PANELS, SHAFFER PAVING 8,400.35 8,400.35 PAVING LISTS. SOUTHWEST POWER INC. 4,506.74 4,506.74 ELECTRIC INVENTORY SUPPLIES. WESTERN NEVA➢A SUPPLY COMPANY 6,202.40 6,202.40 WATER INVENTORY SUPPLIES. WESTERN STATES ELECTRIC INC. 3,351.14 3,351.14 ELECTRIC INVENTORY SUPPLIES. ------------------------ 138,386.26 40,769.53 97,616.73 a i �