Loading...
HomeMy WebLinkAbout10 Fee Schedule Agenda Item # 10a, b & c DONNER Public Utility District Workshop To: Board of Directors From: Mary Chapman, Administrative Services Manager Date: January 4, 2008 SUBJECT: Discussion of amending various fee schedules, with direction or action by the Board 1. WHY THIS ITEM IS BEFORE THE BOARD District costs to perform work have increased since these fee schedules were established. Only the Board can amend fee schedules. 2. HISTORY Some of the attached fee schedules were amended within the last year or two. Most of the fees charged for miscellaneous services performed by the District have not been amended in many years and need to be updated. 3. NEW INFORMATION Attached you will find proposed updates of the following fees and charges: A) Water fee schedule B) Electric fee schedule C) Miscellaneous fee schedule — Electric, Water and General 4. GOALS AND OBJECTIVES Goal#6: Manage the District in an effective, efficient and fiscally responsible manner. 6.6 Develop appropriate financial procedures to assure responsible financial management. 5. RECOMMENDATION This is a workshop item. We are looking for discussion and input from the Board. The Board will need to consider whether we should schedule a public hearing at the next meetin or a later date. v Mary Chap , Administrative Services Manager J n Ulrich, teri Ge eral anager Agenda Item # /0 TRUCKEE DONNER PUblic Utility District Workshop To: Board of Directors From: Ed Taylor Date: January 4, 2008 Subject: Water connection fees increase for 2008 Why this matter is before the board: The Board approval is required for fee increases. Objective 6: Manage the District in an effective, efficient and fiscally responsible manner. Goals: 1.2 Maintain and implement a current Water Master Plan, including the required facilities to meet current and future demand and supply. 2.2 Maintain and implement an Electric System Master Plan, including the required facilities to meet the current and future demand and reliable supply. 6.4 District will conduct an active cost control program. 6.5 Review and implement a Financial Goals policy to achieve a stable financial condition. History: Each year after the budget is approved; the water department staff reviews the cost of the water connection fees. Calculations are based on labor cost, overheads, and material cost. New information: The 2008 budget had increased costs for labor, fuel and materials. Therefore, a recommended Water Connection Fee has been developed. The increase is strictly related to inflation of our costs. The increase is $40.00 for the 5/8X3/4 inch meter, increased from $1,145 to $1,185, and the 3/4 inch meter increased form $1,180 to $1,220. Recommendation: This is a workshop item, so no formal action is suggested at this ti h' meetin is for the purpose of review and discussion. Ed Taylor, Water Utility Manager llJQWrn Ulrich, Interim GM 1J,, Agenda Item # lot> TRUCKEE , , , Public Utility District Workshop To: Board of Directors From: Stephen Hollabaugh Date: January 4, 2008 Subject: Workshop - Amend the Electric Connection and Electric Fees The Fees and charges discussed here are listed in District Code Chapter 5.20 Electric Fees and Charges; The fees discussed are Connection fees (Temporary and Permanent) section 5.20.010, 020 and Service Fees section 5.20.050. The description of these are listed below; 5.20.010 Connection Fees - Temporary Service - The District will provide two types of temporary service; one which will be removed and not become permanent, and one which will become a permanent service. 5.20.020 Connection Fees - Permanent Service - The connection fee is a charge determined by the District to establish a new service. It includes, but is not limited to, the costs of material, labor, overhead, general and administrative costs to provide the service conductor and cable, metering, a proportionate share of the transformer costs, and the account set-up costs. 5.20.030 Connection Fees- Permanent Service, Multiple (Single and Three Phase) - In the event that a service requires multiple metering, the original service will be governed by the connection fees for a permanent service. Subsequent connections made from the same service drop will be subject to the applicable metering, transformer and account set-up costs in addition to the facilities fees. The purpose of the electric connection charge is to pay for the construction of a new service a customer may request. These services can vary in construction type (overhead, underground, overhead to underground) and have various lengths from the existing system to the new customer panel. It has been determined, and is current District practice, that certain electrical costs should be charged a flat fee rather than the actual cost. The electric connection fees fall into this category. The overall costs have been reviewed and it has been determined that an adjustment to the fee is necessary. The costs of materials and labor have increased since the last adjustment to the electric connection charges effective March 20, 2006. A three percent (3%) increase is proposed in 2008 to capture some of the cost increases since the last adjustment to the electric connection fees. Process for the Board of Directors of the Truckee Donner Public Utility District to amend the Electric Connection Fee and Electric Fee schedule; Conduct a public hearing on January 23, 2008 to receive public comments on the proposal to increase the electric connection fee and electric fee schedule; Page 1 of 3 Adopt an ordinance that will do the following: Section 1. The Board of Directors hereby adopts the recitals within the ordinance as its findings. Section 2. Payment and collection of electric connection fees or electric fees— The customer shall pay and the District will collect the connection fees or electric fees upon the submission of an application for new service or modification to an existing service. When the District requires a development agreement, the customer shall pay and the District shall collect the electric connection fee upon execution of a development agreement between the District and the customer. Amount of Electric Connection Fees and Electric Fees: ELECTRIC CONNECTION FEES Proposed Size and Type of Service Existing Connection fee Connection Fee 3% Increase A. Single phase, 120/240 service—200 amp Three-wire overhead 1) Temporary Actual cost Actual cost 2) Permanent connection to structure $1,212 $1,248 3) Temporary connection to customer-owned power pole $1,489 and subsequent transfer to structure $1,534 B. Single phase, 1201240 service—200 amp Three-wire underground (overhead transformer) 1) Permanent connection to structure $1,212 $1,248 2) Temporary connection to customer-owned power pole; $1,489 $1,534 removal of same and installation of underground permanent service to structure C. Single phase, 120/240 service—200 amp Three-wire underground (padmount transformer) 1) Permanent connection to structure $1,212 $1,248 2) Temporary connection to customer-owned power pole; $1,489 removal of same and installation of underground $1,534 permanent service to structure D. Single phase, 120/240 service—400 amp Three-wire underground or overhead 1) Permanent connection to structure $2,295 $2,364 2) Temporary connection to customer-owned power pole; $2 572 $2,649 removal of same and installation of underground permanent service to structure Page 2 of 3 E. Three phase, 208v, 240v or 480v service Four-wire overhead 1) Permanent connection to structure Actual Cost Actual Cost 2) Temporary single phase 120/240 service for construction Actual Cost purposes to become three-phase permanent service to Actual Cost structure Ordinance 2006-08 set the Electric Fees below to a flat fixed rate rather than actual cost. The costs of materials and labor have increased since the last adjustment to the electric fees effective October 16, 2006 listed below. A three percent (3%) increase is proposed in 2008 to capture some of the cost increases since the last adjustment to the electric fees. ELECTRIC FEES Proposed DESCRIPTION Existing Electric fee Electric Fee 3% Increase Overhead to Underground upgrade or relocate, up to 200 amp panel $1,212 $1,248 Overhead relocate $360 $371 400 amp upgrade $1,800 $1,854 Temporary overhead service $750 $773 Overhead to Underground upgrade or relocate, up to 200 amp panel, $1,489 $1,534 with TPP (Temp to Permanent Installation) Section 3. If no protest is made pursuant to Public Utilities Code Section 16078, then this ordinance shall be effective sixty days after adoption by the board of directors of the District. Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Section 5. The provisions of other Ordinances shall remain if effect to the extent that they do not conflict with this ordinance. Recommendation: The Board schedule a public hearing on January 23, 2008 to receive public comment on the proposal to increase the electric connection fee and electric fee schedule; sistant General M ager to m General anager a of 3 /0 b Agenda Item # "I TRUCKEE DONNER DistrictPUID11C Utility Wor1cshop To: Board of Directors From: Stephen Hollabaugh Date: January 3, 2008 Subject: Workshop—Amend the Electric Facility Fees The Fees and charges discussed here are listed in District Code Chapter 5.20 Electric Fees and Charges; The fees discussed are Electric Facilities Fees section 5.20.040 of the District Code. The description of these are listed below; 5.20.40 Facilities Fees 5.20.41 5.20.040.1 Section One— Legislative Findings 5.20.42 The District must expend its water and electric facilities in order to maintain current standards of public health if new development is to be accommodated without decreasing current standards of public health. 5.20.040.1 A The imposition of facilities fees is one of the preferred methods of ensuring that development bears a proportionate share of the cost of water and electric facilities necessary to accommodate such development. This must be done in order to promote and protect the public health, safety and welfare. 5.20.040.1 B Connecting to the District water and/or electric system will create a need for the construction, equipping or expansion of water and electric facilities. 5.20.040.11C The fees established by Section Seven are derived from, are based upon and do not exceed the costs of providing additional water and electric facilities necessitated by the connection to the District's water and electric systems. A study was conducted to determine the capital improvements required to provide for projected load growth over the 15-year planning period, increased system capacity, and expansion or maintenance of the operating flexibility of the electric system. The study is the District's 2002 Electric System Master Plan Update. The District has budget in 2008 for an update to the entire Master Plan. When the 2008 Electric Master Plan is completed, the facility fees will be reviewed again at that time. The purpose of facilities fees is to finance the construction of new public electric system facilities to mitigate the impacts of additional demands on the existing electric system caused by new development within the District's electric service area. The costs of material and labor have increased since the last adjustment to the electric facility ordinance that was effective as of February 16, 2004. A three percent (3%) increase is proposed in 2008 to capture some of the cost increases since the last adjustment to the electric facility fees. Process for the Board of Directors of the Truckee Donner Public Utility District to amend the Electric Facility Fees schedule; Conduct a public hearing on January 23, 2008 to receive public comment on the proposal to increase the electric facilities fee schedule; Page 1 of 3 Adopt an ordinance that will do the following; Section 1. The Board of Directors hereby adopts the recitals within the ordinance as its findings. Section 2. Payment and Collection of Facilities Fees - The customer shall pay and the District will collect the facilities fees upon the submission of an application for new service or modification to an existing service. When the District requires a development agreement, the customer shall pay and the District shall collect the facilities fees upon execution of a development agreement between the District and the customer. Section 3. Amount of Facilities Fees - A. Residential Facilities Fees 1. New Residential Areas: The amount of the electric facilities fees shall be based according to panel size as follows for 2008; a. 200Amp or less - $1,298 (existing fee is $1,260) b. 400Amp - $2,595 (existing fee is $2,520) 2. Existing Residential Areas: If the developer or owner who builds an improvement on a vacant parcel desires to install an electric service larger than a 200 amp single phase panel, the developer or owner will pay the difference in facility fees between the larger panel and a 200 amp panel. 3. Modification to Existing Residential Service: A customer desiring to modify the size of an existing panel for a residential service will pay the difference in facility fees, at the current fee schedule, between the larger panel and the size of the existing panel. B. Commercial Facilities Fees 1. New Commercial Development: For new commercial development, facility fees will be due and payable upon execution of a development agreement with the District. Facility fees will be charged according to the voltage, panel size, and phasing requirements as requested and noted in the development application submitted to the District by the developer. The amount of commercial electric facilities fees shall be charged according to the following schedule: Increase Increase 3% 3% Existing Existing Proposed Proposed 1 3 Panel Phase Phase 1 Phase 3 Phase Voltage Size Fee Fee Fee Fee 200A or 120/240 less $1,260 $2,182 $1,298 $2,247 120/240 400 $2,520 $4,365 $2,596 $4,496 120/240 600 $3,780 $6,547 $3,893 $6,743 120/240 800 $5,040 $8,730 $5,191 $8,992 120/240 1000 $6,300 $10,912 $6,489 $11,239 120/240 1200 $7,560 $13,095 $7,787 $13,488 120/240 1400 $8,820 $15,276 $9,085 $15,734 120/240 1600 $10,080 $17,459 $10,382 $17,983 Page 2 of 3 200A or 120/208 less $1,092 $1,891 $1,125 $1,948 120/208 400 $2,184 $3,783 $2,250 $3,896 120/208 600 $3,276 $5,674 $3,374 $5,844 120/208 800 $4,368 $7,565 $4,499 1 $7,792 120/208 1000 $5,460 $9,457 $5,624 $9,741 120/208 1200 $6,552 $11,348 $6,749 $11,688 120/208 1400 $7,644 $13,239 $7,873 $13,636 120/208 1600 $8,736 $15,132 $8,998 $15,586 120/208 2000 $10,920 $18,914 $11,24IQ $19,481 200A or 277/480 less $2,520 $4,365 $2,596 $4,496 277/480 400 $5,040 $8,730 $5,191 $8,992 277/480 600 $7,560 $13,095 $7,787 $13,488 277/480 800 $10,080 $17,459 $10,382 $17,983 277/480 1000 $12,600 $21,824 $12,978 $22,479 277/480 1200 $15,120 $26,189 $15,574 $26,975 277/480 1400 $17,640 $30,553 $18,169 $31,470 277/480 1600 $20,160 $34,918 $20,765 $35,966 277/480 2000 1 $25,200 $43,647 $25,956 $44,956 2. Modification to Existing Commercial Service: A customer desiring to modify an existing commercial service due to any change of voltage, panel size, and/or phasing, the customer will pay the difference in facility fees, at the current fee schedule, between the proposed panel and the new panel size. 3. For panel sizes not listed in the previous sections, the facility fee will be calculated by interpolating between or extrapolating from the listed values as appropriate. Section 4. Use of Facilities Fees - Facilities fee shall be solely used to pay for all costs associated with the public facilities described or identified in the 2002 Electric Master Plan Update constructed by the District. Section 5. Effective with the effective date of this Ordinance, all prior resolutions and ordinance pertaining to Electric Department facilities fees are rescinded and of no further force and effect. Section 6. This ordinance shall be effective sixty (60) days after the date it was adopted by the Board of Directors. Section 7. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Recommendation: The Board schedule a public hearing on January 23, 2008 to receive public comment on the proposal to increase the el tric facilities fee schedule; Assistant General Manager nt im General Manager Pa of 3 ADMINISTRATIVE SERVICES Miscellaneous Service Fees m Board Presentation �p 01 /09/2008 = C m A 1 TRUCKEE DONNE Public Utility District Overview • The District incurs costs relating to miscellaneous services provided to customers . The District charges fees for most of these services so that the costs are paid by the individual customer receiving the benefit • These costs and fees have been reviewed • Several changes to miscellaneous fees are proposed Public Utility District The Process • Staff was interviewed • Processes were documented • Costs were determined for - Labor - Materials - Overhead (Note: "LMO" = Labor, Materials & Overhead) • Current fees were compared to the current costs 3 Truckee Donner Public Utility District Miscellaneous Electric Service Fees-Proposed Changes 2008 New Description Current Actual Proposed Delete Fee Less Comments Fee Cost Fee /Modify than Cost 1 Relocation of overhead or underground services with no benefit to the District LMO Varies LMO Temporary removal of electrical facilities for customers sole convenience(except for service 2 removal and replacement to remove trees) LMO Varies LMO 3 Relocation of security lights LMO Varies LMO Service reconnect following disconnect at the pole for non-payment of bill(due to meter 4 tampering or inaccessible meter) LMO Varies LMO Service disconnect or reconnect for the customer to work on their facilities after normal 5 working hours LMO $360.89 $ 365.00 Modify Service disconnect or reconnect for the customer to work on their facilities during normal work 6 hours $ - $ 31.18 $ - Yes Customer Service 7 Service disconnect or reconnect due to structural fire and District facilities undamaged $ - $ 31.18 $ - Yes Customer Service 8 Service disconnect or reconnect due to structural fire and District facilities damaged Material Varies LMO Modify 9 Remove or reinstall service drops for removal of trees during normal business hours $ - Varies $ - Yes Customer Service 10 Remove or reinstall service drops for removal of trees after normal business hours N/A Varies LMO New Meter reconnection,disconnection,or transfer for establishing and closing an account during 11 office hours-single phase $ 35.00 $ 57.21 $ 60.00 Modify Meter reconnection,disconnection,or transfer for establishing and closing an account after This fee is no longer applicable XX hours 1 1/2 times rate(overtime rate) $ 85.00 $ 68.84 N/A Delete and should be deleted Meter reconnection,disconnection,or transfer for establishing and closing an account after $365 would be a hardship for 12 hours double-time rate $ 105.00 $365.29 $ 150.00 Modify Yes customer Meter reconnection,disconnection,or transfer for establishing and closing an account during Polyphase(3-phase)is more 13 office hours-polyphase $ 35.00 $ 88.38 $ 90.00 New complex than single phase 14 Establishing and closingan account as of the last reading date $ 20.00 $ 26.03 $ 30.00 Modif 15 Automatic transfer of an account back to an owner $ - $ 3.95 $ - Yes Customer Service Giving customer the benefit of 16 Resealing meter; ring seal first occurrence-single phase $ - $ 67.33 $ - Yes doubt Giving customer the benefit of 17 Resealing meter; ring seal first occurrence-polyphase $ - $ 98.50 $ - New Yes doubt 18 Resealing meter; ring seal second occurrence-single phase $ 25.00 $ 67.33 $ 70.00 Modify G y LMO=Actual cost of Labor, Material, and Overhead Truckee Donner Public Utility District Miscellaneous Electric Service Fees-Proposed Changes 2008 New Description Current Actual Proposed Delete Fee Less Comments Fee Cost Fee /Modify than Cost Polyphase(3-phase)is more 19 Resealing meter;ring seal second occurrence-polyphase $ 25.00 $ 98.50 $ 100.00 New complex than single phase 20 Resealing meter; both the ring seal and the inner seal are cut or missing-single phase $ 25.00 $159.23 $ 160.00 Modify Polyphase(3-phase)is more 21 Resealing meter; both the ring seal and the inner seal are cut or missing-polyphase $ 25.00 $682.90 $ 685.00 New complex than single phase 22 Resealing meter; UO seal $ - $ 31.18 $ 35.00 New Testing single phase meter due to either broken or missing internal seal or the integrity of thE This fee is redundant(#20)and XX meter is in question $ 50.00 $ 31.18 N/A Delete should be deleted Testing polyphase meter due to either broken or missing internal seal or the integrity of the This fee is redundant(#21)and XX meter is in question LMO $ 62.35 N/A Delete should be deleted 23 Repairing or replacing a broken meter-single phase $ 95.00 $159.23 $ 160.00 Modif 241 Repairing or replacing a broken meter-polyphase LMO $682.90 1 $ 685.00 Modify Testing of single phase meter at customer request and the meter has been tested within three 25 years $ 50.00 $ 62.36 $ 65.00 Modify Testing of polyphase meter at customer request and the meter has been tested within three 26 years(cost refunded if meter is more than 2%fast) $ 75.00 $124.71 $ 125.00 Modif 27 Performing a special reading $ 20.00 $ 31.18 $ 35.00 Modify 28 Monthly Security Light Service-100w $ 10.00 $ 11.21 $ 15.00 Modify 29 Monthly Security Light Service-200w $ 15.00 $ 16.87 $ 20.00 Modi 30 Monthly Security Light Service-400w $ 20.00 $ 27.91 $ 30.00 Modif 31 1 Callout after normal business hours $ 105.00 Varies $ 150.00 Modify Yes Customer Service s LMO=Actual cost of Labor, Material,and Overhead Truckee Donner Public Utility District Miscellaneous Water Service Fees-Proposed Changes 2008 New Description Current Actual Proposed Delete Fee Less Comments Fee Cost Fee /Modify than Cost 1 1 Relocation of water services LMO Varies LMO 2 Physical disconnection or reconnection of water service $ 25.00 $ 31.18 $ 35.00 Modify Physical disconnection or reconnection of water service-frozen pipes during normal business 3 hours $ - Varies $ - Yes Customer Service Physical disconnection or reconnection of water service-frozen pipes-after normal business 4 hours $ 105.00 Varies $ 150.00 ModifyYes Customer Service 5 Callout after normal business hours $ 105.00 Varies $ 150.00 Modify Yes Customer Service 6 Trench backfilled before District installs facilities LMO Varies LMO Meter reconnection,disconnection,or transfer for establishing and closing a water only 7 account-unmetered $ 15.00 $ 4.40 $ 15.00 Meter reconnection,disconnection,or transfer for establishing and closing a water only 8 account-metered $ 15.00 $ 31.18 $ 35.00 Modify 9 Performing a special reading $ 20.00 $ 31.18 $ 35.00 Modify i i 4 V Note:LMO=Actual cost of Labor, Materials, and Overhead Truckee Donner Public Utility District Miscellaneous General Service Fees-Proposed Changes 2008 -New Description Actual Recommended Delete Fee Less Comments Current Fee Cost Fee /Modify than Cost 1 Document Printing&Copying per page no charge for less than 20 pages) $ - $ 0.10 $ 0.10 New 2 Audio Tape per toe $ $ 2.00 $ 2.00 New 3 DVD per DVD $ - $ 2.00 $ 2.00 New 4 Credit Verification Report $ 1.30 $ 1.41 $ 1.41 Modify 5 Trip charge to deliver a 48-hour notice $ 10.00 $ 10.35 $ 10.00 6 Trip charge to deliver a 48-hour notice non-compliance $ 10.00 $ 10.35 $ 10.00 2 employees to deliver notice to Trip charge to disconnect power for non-payment or non-compliance of a payment possibly hostile customer;omit 7 agreement or District service agreement $ 10.00 $ 36.28 $ 40.00 Modify last phrase 8 Tripcharge to deliver a Returned Check Notice $ $ 10.35 $ 10.00 New Minimum monthly late payment fee on account balance greater than$25;fee only Recommend$25 limit changed to 9 applies to balances greater than$25; 1.50%or$10 minimum $ 5.00 $ 7.53 $ 10.00 Modify $50 Annual interest rate on consumer deposits(based on avg of 4 local banks;see Title Based on local bank savings 10 5,5.01.010.6&5.01.020.E .188%APR N/A 188%APR account rate reviewed quarter) Returned check charge($10 per check-maximum charge per check$20 for checks 11 returned twice $ 10.00 $ 24.40 $ 25.00 Modify 12 Repair or Replacement of an District Facilities LMO Varies LMO Note:LMO=Actual cost of Labor,Materials,and Overhead Public Utility District MI i Where do we go from here? • Discuss fees that are less than District costs • Consider approving or modifying the proposed fees • The new fee schedule will be effective 30 days after approval • Staff will evaluate fees and costs annually S ge V (. 5ed A )eyxdo, 1temwl0c. ADMINISTRATIVE SERVICES Miscellaneous Service Fees Board Presentation 01/09/2008 lA Public Utility Distri ct Revisions • Miscellaneous Electrical Fees (Page 4 & 5) - Clarified that "Actual Costs" are estimated - Removed cost of a meter for #20 & #21 • If a meter needs to be replaced, #23 & #24 will apply - Added note to #23 & #24 . If other, more expensive meters need repair, an additional fee will apply based on District cost - Estimated cost for #31 16 Public Utility District Revisions • Miscellaneous Water Fees (Page 6) - Clarified that "Actual Costs" are estimated - Proposed $0 fee for #2, unless snow removal or excavation is required - Proposed deleting #3 - Estimated cost for #4 & #5 IG Public Utility District Revisions • Miscellaneous General Fees (Page 7) - Clarified that "Actual Costs" are estimated - Clarified that #7 may also incur an additional Miscellaneous Electrical Fee #11 if electric service is disconnected for non-payment - Listed an example of annual interest on a deposit for #10 i d Public Utility District Overview • The District incurs costs relating to miscellaneous services provided to customers • The District charges fees for most of these services so that the costs are paid by the individual customer receiving the benefit • These costs and fees have been reviewed • Several changes to miscellaneous fees are proposed Public Utility District The Process • Staff was interviewed • Processes were documented • Costs were determined for - Labor - Materials - Overhead (Note: "LMO" = Labor, Materials & Overhead) • Current fees were compared to the current costs 3 Truckee Donner Public Utility District *** REVISED AGENDA ITEM #10 c *** Miscellaneous Electric Service Fees-Proposed Changes 2008 Estimated New/ Description Current Actual Proposed Delete Fee Less Comments Fee Cost Fee /Modify than Cost 1 Relocation of overhead or underground services with no benefit to the District LMO Varies LMO Temporary removal of electrical facilities for customers sole convenience(except for service 2 removal and replacement to remove trees) LMO Varies LMO 3 Relocation of security lights LMO Varies LMO Service reconnect following disconnect at the pole for non-payment of bill(due to meter 4 tampering or inaccessible meter) LMO Varies LMO Service disconnect or reconnect for the customer to work on their facilities after normal 5 working hours LMO $ 360.89 $ 365.00 Modify Service disconnect or reconnect for the customer to work on their facilities during normal work 6 hours $ - $ 31.18 $ - Yes Customer Service 7 Service disconnect or reconnect due to structural fire and District facilities undamaged $ - $ 31.18 $ - Yes Customer Service 8 Service disconnect or reconnect due to structural fire and District facilities damaged Material Varies LMO Modify i 9 Remove or reinstall service drops for removal of trees during normal business hours $ - Varies $ - Yes Customer Service 10 Remove or reinstall service drops for removal of trees after normal business hours N/A Varies LMO New Meter reconnection,disconnection,or transfer for establishing and closing an account during 11 office hours-single phase $ 35.00 $ 57.21 $ 60.00 Modi Meter reconnection,disconnection,or transfer for establishing and closing an account after This fee is no longer applicable I XX hours 1 1/2 times rate(overtime rate) $ 85.00 $ 68.84 N/A Delete and should be deleted Meter reconnection,disconnection,or transfer for establishing and closing an account after $365 would be a hardship for 12 hours double-time rate $ 105.00 $ 365.29 $ 150.00 Modify Yes customer Meter reconnection,disconnection,or transfer for establishing and closing an account during Polyphase(3-phase)is more 13 office hours-polyphase $ 35.00 $ 88.38 $ 90.00 New complex than single phase 14 Establishing and closing an account as of the last reading date $ 20.00 $ 26.03 $ 30.00 Modify 15 Automatic transfer of an account back to an owner $ - $ 3.95 $ - Yes Customer Service Giving customer the benefit of i 16 Resealing meter;ring seal first occurrence-single phase $ - $ 67.33 $ - Yes doubt Giving customer the benefit of 171 Resealing meter;ring seal first occurrence-polyphase $ - $ 98.50 $ - New Yes doubt 18 Resealing meter;ring seal second occurrence-single phase $ 25.00 $ 67.33 $ 70.00 Modify 14 LMO=Actual cost of Labor,Material,and Overhead Truckee Donner Public Utility District *** REVISED AGENDA ITEM #10 c *** Miscellaneous Electric Service Fees-Proposed Changes 2008 Estimated New/ Description Current Actual Proposed Delete Fee Less Comments Fee Cost Fee /Modi than Cost Polyphase(3-phase)is more 19 Resealing meter;ring seal second occurrence-polyphase $ 25.00 $ 98.50 $ 100.00 New complex than single phase 20 Resealing meter;both the ring seal and the inner seal are cut or missing-single phase $ 25.00 1 $ 71.73 $ 75.00 Modify See also#23 21 Resealing meter;both the ring seal and the inner seal are cut or missing-polyphase $ 25.00 $ 102.90 $ 105.00 New See also#24 22 Resealing meter;UO seal $ - $ 31.18 $ 35.00 New Testing single phase meter due to either broken or missing internal seal or the integrity of the This fee is redundant(#20)and XX meter is in question $ 50.00 $ 31.18 N/A Delete should be deleted Testing polyphase meter due to either broken or missing internal seal or the integrity of the This fee is redundant(#21)and XX meter is in question LMO $ 62.35 N/A Delete should be deleted Additional fee applies for single phase meters that are not Form 2S 200 amp,based on District 23 Repairing or replacing a broken meter-single phase, Form 2S 200 amp $ 95.00 $ 159.23 $ 160.00 Modify cost Additional fee for polyphase meters that are not Form 16S, 24 Repairing or replacing a broken meter-polyphase, Form 16S LMO $ 682.90 $ 685.00 Modify based on District cost Testing of single phase meter at customer request and the meter has been tested within three 25 years $ 50.00 $ 62.36 $ 65.00 Modify Testing of polyphase meter at customer request and the meter has been tested within three 26 years(cost refunded if meter is more than 2%fast) $ 75.00 $ 124.71 $ 125.00 Modify 27 Performing a special reading $ 20.00 $ 31.18 $ 35.00 Modify ' 28 Monthly Security Light Service-100w $ 10.00 $ 11.21 $ 15.00 Modify 29 Monthly Security Light Service-200w $ 15.00 $ 16.87 $ 20.00 Modify 30 Monthly Security Light Service-400w $ 20.00 $ 27.91 $ 30.00 Modify Fm lCallout after normal business hours $ 105.00 $ 365.29 $ 150.00 Modify Yes Customer Service s LMO=Actual cost of Labor,Material,and Overhead Truckee Donner Public Utility District Miscellaneous Water Service Fees-Proposed Changes f 2008 I i New/ Description Current Estimated Proposed Delete Fee Less Comments Fee Actual Cost Fee /Modify than Cost 1 Relocation of water services LMO Varies LMO Additional fee will apply(LMO) 2 Physical disconnection or reconnection of water service during normal business hours $ 25.00 $ 31.18 $ - Modify Yes for snow removal or excavation Physical disconnection or reconnection of water service-frozen pipes during normal business Varies $ - Delete See#2 3 hours $ - Physical disconnection or reconnection of water service-frozen pipes-after normal business 4 hours $ 105.00 $ 298.24 $ 150.00 Modify Yes Customer Service 5 Callout after normal business hours $ 105.00 $ 298.24 $ 150.00 Modif Yes Customer Service E 6 Trench backfilled before District installs facilities LMO Varies LMO Meter reconnection,disconnection,or transfer for establishing and closing a water only 7 account-unmetered $ 15.00 $ 4.40 $ 15.00 Meter reconnection,disconnection,or transfer for establishing and closing a water only t 81 account-metered $ 15.00 $ 31.18 $ 35.00 Modi 9 Performing a special reading $ 20.00 $ 31.18 $ 35.00 Modify r i f I 1L/ Note: LMO=Actual cost of Labor,Materials,and Overhead Truckee Donner Public Utility District Miscellaneous General Service Fees-Proposed Changes 2008 i Estimated New I k Description Actual Recommended Delete Fee Less Comments r Current Fee Cost Fee /Modify than Cost `s 1 Document Printing&Copying per page(no charge for less than 20 pages) $ $ 0.10 $ 0.10 New 4 2 Audio Tape per tape $ $ 2.00 $ 2.00 New 3 DVD oer DVD $ - $ 2.00 $ 2.00 New 4 Credit Verification Report $ 1.30 $ 1.41 $ 1.41 Modify 5 Tri char- a to deliver a 48-hour notice $ 10.00 $ 10.35 $ 10.00 6 THD char a to deliver a 48-hour notice non-compliance $ 10.00 $ 10.35 $ 10.00 2 employees to collect or Trip charge to disconnect power for non-payment or non-compliance of a payment disconnect service.See also 7 agreement or District service agreement $ 10.00 $ 36.28 $ 40.00 Modify Electric Fee#11 8 Trip char a to deliver a Returned Check Notice $ - $ 10.35 $ 10.00 New Minimum monthly late payment fee on account balance greater than$25;fee only Recommend$25 limit changed to i 9 a lies to balances renter than$25; 1.50%or$10 minimum $ 5.00 $ 7.53 $ 10.00 Modify $50 Based on local bank savings account rate(reviewed quarterly). Annual interest rate on consumer deposits(based on avg of 4 local banks;see Title For example,0.188%_$0.19 per 10 5,5.01.010.6&5.01.020.6) .188%APR N/A .188%APR year for a$100 deposit. Returned check charge($10 per check-maximum charge per check$20 for checks 11 returned twice) $ 10.00 $ 24.40 $ 25.00 Modify 12 Repair or Replacement of any District Facilities LMO Varies LMO -7 fi }l q(l 1 i k i Note:LMO=Actual cost of Labor,Materials,and Overhead Public Utility District Where do we go from here? • Discuss fees that are less than District costs • Consider approving or modifying the proposed fees • The new fee schedule will be effective 30 days after approval • Staff will evaluate fees and costs annually i I g