Loading...
HomeMy WebLinkAboutStaff Reports TRUCKEE DONNER PUBLIC UTILITY DISTRICT BILLS FOR BOARD APPROVAL — AUGUST 15, 1994 TOTAL ELECTRIC WATER DESCRIPTION -------------------------_-___-_---------_------__......----------_-------_—_—____-•---------_ ADVANCED ASPHALT 8,755.66 8,755.66 PATCHING AND PAVING OF VARIOUS LOCATIONS. AUTOMATED MAPPING SERVICES 8,350.00 8,350.00 HEWLETT PACKARD DESIGN JET 650C, E SIZEPLOTTER/8MH HEAVY EQUIP CONST & SNOW REMOVAL 5,937.02 5,937.02 REPAIRS OF LEAKS IN TAHOE DONNER. HIGHFIELD MFG. COMPANY 4,768.88 4,768.88 400 METER GUARD RINGS, KLEINFELDER INC. 5,016.70 5;016.70 SAMPLE GROUNDWATER FOR LEAKED FUELS IN THE :sa. 4 CORPORATE YARD. SAUERS ENGINEERING INC. 25,528.13 25,528.13 PROP 55 (18283.50) MISC REQUESTS (75.00) SCADA (200.00) 80/89/267 UTILITY CONST (1142.00) PIPELINE REPLACEMENT CONSTRUCTION (2140.13) HIRSCHDALE TREATMENT ENGINEERING (2500.00) OFFICE SITE FUEL TANKS (162.50) TAHOE DONNER WELLS (1025.00). ___—_..------------------------------ 58,356.39 13,118.88 45,237.51 /_ jet.( l 1 TDPUD STAFF REPORT August 11, 1994 TO: Board of Directors FROM: Peter L. Holzmeister, General Manager SUBJECT: General Manager's Report AGENDA # 1 1 A) SPPCo/WWP merger - Attached is a notice issued by FERC that SPPCo and WWP have filed their application for merger. We must intervene by September 9, 1994 in order to be heard by FERC. Our next Board meeting is scheduled for September 6. 1 will ask Bob McDiarmid to prepare a report and recommendation for you to consider at the September 6 meeting. If Bob advises that an earlier special meeting is necessary, I will be in touch with the Directors to that effect. B) Transmission study - Staff of NCPA continues to review the availability of transmission over Donner Summit. This follow-up study to an earlier study performed by SPPCo is being conducted with full cooperation from PG&E and grudging cooperation from SPPCo. Initial computer runs indicate substantial capacity on the transmission system during a 1994 heavy summer load scenario. The final computer runs and reports will be reported during the next few months. Attached is the schedule for study completion agreed to by the parties. C) Truckee River Operating Agreement - A local committee has been meeting to discuss the interests of the Truckee River Basin parties in California as part of the effort to negotiate a Truckee River Operating Agreement. Part of our discussion focused on the need of the several water purveyors in the California portion of the Truckee River Basin to identify their current and projected water needs and planned sources of water. I will be working with our neighboring water districts to define our collective needs. D) Tahoe Donner Golf Course wells - The Water Committee and staff continue to meet with representatives of the Tahoe Donner Association to discuss a joint venture for development of wells. Sauers Engineering will be preparing an analysis of costs and benefits to assist us in developing our position. E) Cooperative Personnel Services studies - I have met with staff of CPS to make sure the tasks they are performing for us move along swiftly and smoothly. We will have more information for you soon. F) Meetings - i have been involved in preparation of agendas and packets for • Board meetings and have conducted Monday morning staff meetings. PLH/smc UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION The Washington Water Power Company ) Docket No. EC94-23-000 and Sierra Pacific Power Company ) NOTICE OF FILING (August 9, 1994 ) Take notice that on August 4 , 1994 , The Washington Water Power Company (Water Power) and sierra Pacific Power Company (Sierra Power) (together Applicants) filed Se 203 of the Federal Power Act and Part 33 of the�uant Commission,slon Regulations, a Joint Application requesting authorization to merge and reorganize Applicants`dispose utility operations and to Of Applicants) jurisdictional facilities. Pursuant to an Agreement and Plan of Reorganization and Merger, Sierra Pacific Resources Inc. , Sierra Pacific and Water Power will merge into a new corporation, Resources West Energy Corporation (Resources West) and Water Power and sierra Pacific Will operate as separate utility divisions of Resource West. The subsidiaries of Water Power and sierra Pacific Resources (excluding Sierra Pacific, but including Sierra pacific,s subsidiaries) will become subsidiaries of Resources West. The merger will be effected through an exchange of stock, with Sierra Pacific Resources and Water Power shareholders exchanging their shares for the right to receive shares in Resources West. Applicants have submitted the direct testimony of mine witnesses who provide, inter alia, a description of the merger, the projected benefits for ratepayers and shareholders , all explanation of how Resources West will provide comparable service to customers, and an analysis of the affects of the merger on competition in the relevant markets. Applicants also have submitted pro forma, open_access point--to-point transmission and network- integration service tariffs for Resources west•s Water Power and Sierra Pacific Divisions which, provide a range of .flexible services at rates, terms and conditions Comparable to Resources designed to be Nest s use of Applicants' systems_ Applicants have requested, i commissionn a companion motion, that the adopt an alternati ve procedural mechanism to expedite consideration of the Joint Application and a technical conference, by providing for discrvery necessary. by by a paper hearing if Docket No. EC94-23-000 2 copies of the Joint Application have been served on the state utility regulatory commissions in Washington , Idaho, Oregon, Montana , Nevada and California. Any person desiring to be heard or to protest said filing should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 825 North Capitol Strut, N.E. , Washington, D.C. 20426, in accordance with Rules 211 and 214 of the Commission's Rules of Practise and procedure ( 1 8 CFR 385 , 211 and 18 CFR 385 . 214) . All such motions or protests should be filed can or before September 9 , 1994 . Protests will be considered, by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of this fi.lincl are on file with the commission and are available for public inspection. Linwood A. Watson, Jr. Acting Secretary N C PA A Public Agency Northern California Power Agency . 180 Cirby Way, Roseville California 95678 MICHAEL W. McDONALD General Manager (916)781-4218 July 22, 1994 � ;_ Duane Nelson Sierra Pacific Power Company 6100 Neil Road P.O. Box 10100 Reno, NV 89520-0400 Trang Luu Pacific Gas& Electric Company 150 Spear Street, Room 600 Mail Code Z68 San Francisco, CA 94105 Subject: Summit Intertie Transmission Studies -Notes of the Joint Technical Meeting on July 19, 1994 between NCPA/TDPUD-SPPC-PG&E Dear Duane and Trang: This memo present notes of the meeting on July 19, 1994, between Sierra Pacific, PG&E, NCPA/ Truckee-Donner PUD concerning the Summit transmission studies . 1. Attendees A list of the attendees at the meeting is shown in Attachment 1. 2. Agenda of the Meeting The agenda of the meeting is enclosed - Attachment 2. 3. Transmission Planning Criteria NCPA presented a draft of the Transmission Planning Criteria for the studies. This was discussed and a copy of the revised criteria is enclosed - Attachment 3. The criteria for the Post Transient Studies will be the WSCC criteria included in Attachment 4. NCPA will send to Sierra Pacific and PG&E available data on the COPE routine for the study. (A disk and write-up of the IPC routine is attached -Attachment 3a.) Sierra Pacific and PG&E . will examine the data requirements and submit additional data as necessary to perform the studies. July 22, 1994 Page 2 4. Changes made to 94HS (Heavy Summer)Data- s94past.crd - by SPPC Sierra Pacific's data changes were clarified. There was no change in the total load or generation data, except for generator PMAX and powerplant auxiliary load data for which Sierra Pacific will send revised data. Sierra Pacific stated that this change will not change the total load or generation MW. PG&E stated that the Eldorado powerplant is not in operation because of damage due to fire. This powerplant is not in operation and the generation should be made equal to zero in the cases. 5. Study Plan The Study Plan was discussed and a copy of the revised plan is enclosed - Attachment 4. 6. Preparation of Data for Other Cases The following dates were agreed regarding the preparation of data for the other cases: • 95HS -by August 11, 1994 • 96HS -by August 11, 1994 • 97HS - was canceled (this would include the Alturas project). • 94-95HW -- by August 31, 1994 7. Schedule for Studies 7.1 Phase 1 Studies -for 94HS Heavy Summer Cases. These studies will be performed by NCPA and sent to all by August 5, 1994. The report write- up will done by September 15, 1994. 7.2 Schweitzer Overload Relays PG&E will provide calculations and settings for the Schweitzer overload relays in the area by August 5, 1994. 7.3 Phase 2 Studies -for 95HS and 96HS HeM Summer Cases These studies will be performed by NCPA and sent to all by September 15, 1994. The report write-up will done by September 30, 1994. 7.4 Phase 3 Studies- for 94-951-W HeM Winter Cases July 22, 1994 Page 3 These studies will be performed by NCPA and sent to all by September 30, 1994. The report write-up will done by October 15, 1994. T4 Phase 4 Studies -Post Transient Studies for 94HS and other Hem Summer/Winter Cases These studies will be performed and sent to all by November 30, 1994. The report write- up will done by December 15, 1994. It was not decided who will perform the studies. 8. Next Teleconference/Meeting The next teleconference will be held on Thursday, August 11, 1994, at 10 a.m. The next meeting date will be agreed at the teleconference. We thank you for attending the meeting at Roseville and your cooperation for performing the studies for Summit transmission. If there are any questions regarding these "Notes," please call me at (916) 781-4218. Sincerely, LES PEREIRA, F.E. Supervisor - Transmission Planning & Design Attachments CC' Peter Holzmeister Steve Hollebaug Jim Beck W. Kent Palmerton Tom Green Don DeBerry i Truckee Donner Public Utility District Board of Directors Joseph R.Aguera C John L.Corbett Business Office Engineering Services Richard K.Curran (916) 587-3896 (916) 587-3944 FAX (916) 587-5056 .lames A. Maass Patricia B. Sutton General Manager Peter L.Holzmeister ADMINISTRATIVE SERVICES: JULY-AUGUST, 1994,STAFF REPORT Submitted by Mary Chapman, August 10, 1994 -1 MONTHLY FINANCIAL REPORTS: .TUNE, 1994 1) BUDGET REPORT: Enclosed are copies of the June financial reports. We are currently 50% of the way through the fiscal year. The June budget report shows that we have received 53% of the budgeted operating revenue and we have spent 51% of the budgeted expenses for the year. Because of the timing of the electric sales and purchased power expenses for the year, it is appropriate for us to be slightly ahead of the 50% mark. The June budget report shows that we have received 48% of our budgeted water operating revenue and have spent 46% of the budgeted expenses for the year. It is also appropriate for us to be slightly lagging the 50% mark as of ,tune in the water department, particularly in the commercial sales category. These are the accounts that are metered. Their bills are generally higher in the summer months which will be reflected in the next three budget reports. On the expense side, pumping costs will also increase over the summer months. 2) FINANCIAL STATEMENTS: The Electric Income Statement shows a year-to-date loss of.$89,999.47 and a loss of $129,773.26 for the same period last year. The Water Income Statement shows a year-to-date loss of $121,298.80 compared to a loss of $171,279.02 for the same period last year. The main difference between the gain in the year-to-date budget and the loss for the same period on the financial statements is the non-cash items such as depreciation and amortization expenses. If we were to include these amounts in our budgeting process, the financial statements would not show a loss. We would also raise more cash to pay for facilities replacements. 3) STATEMENT OF GENERAL FUND: While we are only showing $468,948.29 left in the General Fund, there are two outstanding amounts due from the State for Prop 55 related costs that the District has paid for, but had not yet been reimbursed as of June 30, 1994. These two requests appear at the bottom of the statement. We have since received the reimbursement Post Office Box 309 0 11570 Donner Pass Road • Truckee, California 96160 request for $466,095.59. Each time we receive a reimbursement from the State, our long term debt balance goes up a like amount. 4) INVESTMENT REPORT: As interest rates continue to rise, so does the yield on the District's investments with the Local Agency Investment Fund. At the last board meeting, the Board committed $376,392 from facilities fees and all of the remaining acquisition funds to various water department projects. COMPUTER OPERATIONS: The installation of the Miscellaneous Accounts Receivable software has been completed. Everything went well. The only thing that we need to do is to order printed invoices. This system will allow us to send out regular progress billings on construction jobs and development agreements. It will also allow us to send out monthly statements and collection letters on delinquent miscellaneous billings. OTHER: The District has entered into an agreement with Automatic Merchandisers, Inc. to maintain the coke machine. The following is an accounting of the monies on hand: $ 24.08 Balance at 111l94 640.68 Collections -550.20 Payments to Shoshone -11.24 Purchase of cash box $ 103.32 Ending balance 8f10194 The ending balance of $103.32 will be deposited in the employee flower fund. There were also 94 cans of soda which will be bought back by Shoshone. Those funds will also be turned over to the employee flower fund upon receipt. The vender will keep the price of the sodas at 50 cents per can. 0794MOLY.RPT TRUCKEE DONNER PUBLIC UTILITY DISTRICT: 1994 OPERATING BUDGET REPORT 1/94-6194 50% i ELECTRIC: WATER: TOTAL: REVENUES: Budget Actual Budget Bat % Budget Actual Budget Sal % Budget Actual Budget Bat % Residential sates - 3.684,000 2,080,732 - -1,603,268 -56%- µ 2,216,425 YY Yw 1,106,049-----1,110,376 50% 5,900,425 3,186,780 2,713.645 54% Commercial sales 2,780.500 1,476,082 1,304.418 53% 336,875 132,270 204,605 39% 3,117,375 1,608,352 1,509,023 52% Large commercial sates 628,700 251,577 377,123 40% 0 0 0 0% 628,700 251,577 377,123 40% Sales to public authorities 78,750 39,609 39,141 50% 0 0 0 0% 78.750 39,609 39,141 50% Fuel charge 374,000 199,685 174,315 53% 0 0 0 0% 374,000 199,685 174,315 53% Interdepartmental sales 470,750 209,684 261.066 45% 860 382 478 44% 471,610 210,065 261,545 45% Misc operating revenue 123.000 61.900 61,101 50% 4.800 3,409 1,391 71% 127,800 65,308 62,492 51% Misc rents 54,250 32,175 22,075 59% 20,720 300 20,420 1% 74,970 32,475 42,495 43% Standby revenue 43,750 21,330 22,420 49% 310.000 150,725 159,275 49% 353,750 172,055 181,695 49% interdepartmental rent 117,036 58,518 58,518 50% 0 0 0 0% 117,036 58,518 58.518 50% Fire protection tees 0 0 0 0% 69,350 33,313 36,037 48% 69,350 33,313 36,037 48% _.___...._------------------------------------ -__- ------ ----------------------------------------------------------------------------------- ....--.._.._...-.._.._....___ Total Operating Revenue 8,354,736 4,431,291 3,923,445 53% 2,959,030 1,426,447 1,532,583 48% 11,313,766 5,857,738 5,456.028 52% Interest income 88,000 25,384 62,616 29% 0 60,601 (60,601) 0% 88,000 85,984 2,016 9B% Total Revenue 8,442,736 4,456,674 3.986.062 53% 2,959,030 1,487.048 1,471,982 50% 11,401,766 5.943,722 5,458.044 52% TRUCKEE DONNER PUBLIC UTILITY DISTRICT: 1994 OPERATING BUDGET SUMMARY 1194-6194 50% i ELECTRIC: WATER: TOTAL.: Budget Actual Budget Bal % Budget Actual Budget Bai % Budget Actual Budget Bat % Revenues 8,442,736 4,456,674 3,986,062 53% 2,959,030 1,487,048 1,471.982 50`Yo 11,401,766 5,943,722 5.458.044 52% Less Expenses: Board of Directors 60,355 42,122 18,233 70% 50,755 33,794 16,961 67% 111,110 75,916 35,194 68% General Manager 157,784 82.011 75,773 52% 162,323 40,767 121,556 25% 320,107 122,778 197,329 38% Administrative Services 526,813 269,193 257,620 51% 310,949 146,932 164,017 47% 837,762 416,125 421,637 50% Planning Services 154,793 96,354 58,439 62% 96,912 46,455 50,457 48% 251,705 142,809 108,896 57% Support Services 404,167 123,635 280,532 31% 50,661 20,806 29,855 41% 454,828 144.441 310,387 32% Electric/Waler Operations 859,582 420,963 438,619 49% 1,314.441 687,619 633,778 52% 2,174.023 1,108.582 1,068,919 52% Purchased Power 5,858,000 2,972,990 2,886,010 51% 0 0 0 0% 5,858,000 2,972,990 2,885.010 51% Interdepartmental rent 0 0 0 0% 117,036 58,518 58,518 50% 117,036 58,518 58,518 50% Debt service 361,593 309,240 52,353 86% 959.352 377,384 581,968 39% 1,320,945 686,624 634,321 52% Other Non Budget Items 0 0 0 0% 0 0 0 0!0 0 0 0 0% Total Expenses 8,383,087 4,316,509 4,066,578 51% 3,062,429 1,412,275 1,657,110 46% 11,445,516 5,728.784 5.716.732 50% Net Revenue less Expenses 59,649 140,166 (80.517) 235% (103,399) 74,773 (165,128) -72% --(43_750)�---WM-214,938---_--r(258,688)491% RAI TROKE NNAk F.C.[ / / / ELECTRlC BALAAE WIT For Fe'iod Ending JhNE 31. 1YW. Current Lost Yer Y'T-D Amnnt Y-T-[ Axwmt AGSE � S -------- U7lLDY PLANT Y,358A7.5Y 9077'62l8 � {kE91RIClEO FUNDS A%HIKISTRATIVE G6TLPlNG LEASE FUhIS 272,500.22, 282.719.13 F*H8/EE DBER�E� C��pEnSAlI3N-}CqA 526'082.3� 4�8'632.9� 6[A RE6ER,E FLj,'D .0 19.CaO!, F~CWGB iBS 264AV91 024.83 WRY WE, 199,379.8O 15C5I EUIiW FRD B7'287.56 ]47,J35.31 ____________ TOAL JESlnlClED F06S 2'14�.316.79 Z.675,321.74 CURRENT ASSE 8 6VEKAL F&5S 6 29 1,101,308.l1 ACCOUN7S RECEIVABLE, NET 530s]4.31 647,853.58 .` FUE FROM WAR 669'464.64 128.971.1v M4l[�IAiS AND SUPPLIES 4C4.525.13 33298.45 INTEREST INWE RKEJVA8LE 19,76y11 34.799.02 ` E.YPE.�SES AN2 OTHER 125004.34 W.5S116 __________ _....... ________ TOTAL ASSETS 2068366.37 2.413^W..52 UMAMOHTlZED ISSU[ HS7S 436,649.51 141.293.0 REilhlNARY SNUEY CJSTS W UTAR 2.19036 2.1Y126 rI�C 8[FEHHE0 1-H8lTS 0,432.60 .O0 _________ TbT4L A 5SE[B 14,225,065.72 14.129,5J5.65 ~ | ` ' ` , ` � � � ` ` ` ' ` ` -' -- TOIxE[ [KKR F.G.[. LL[C[M WKE MET For NOW WAS JUNE 30. 15M brat Lost Ymr Y-T-E Azount Y-T-[ Amunt LQUITY & ilA3lLITIES _____________________________ =199 EMNlNSS 8.492.547.B 3'678'267.89 DEBT _ A�r�INISTFATDI 0FFIC[ 0jlLBI+S 3,O93.26O.15 2.715'0OO.{0 1E 5530100 L[ASE/P[RCh4SE U�bIpMENT 378.30.36 133,044.D9 ---_______ TOTAL 8ERT 51 2.9O3.O44.8Y ` HAM LlA8ILI3ES ACC8WS MAKE 1.1O1617.40 1,O96,2---4.33 ER DEP9SITS 117251.77 MJJ3.63 AQRCED MaESJ PAYAME 61,549.48 87.814.57 HEM 6lANDBY B[S I .00 ACCRU0 C0MFEUTI0N & WTED WB 119,3O3.29 110062.36 � ------_____ TOTAL WENT LIABLlTlES I,4O0,?O1.54 1'441.7l1.89 � Wi,L-��TTIUC'IliollN 144'569.04 69Q,2/8.O� [�pLQYE� DEFERREQ CCM��SATIU� - lC A 526'082.3O 4O8,632.94 � ---``---'— ------- TOJ�':L E�-�IJITY kO LIA3lLITI[3 14,225,O65.72 14,129,535.65 ' _ ` ` ' / , ' __ ' i " + 71 AK[2 WER F.!C. �fCRIC ]�C�h� STA��ENl Fvr Period EVing MNE 30, 1Y94 Want Lost Ypar Y-T-0 Anuunt Y-TQ Anmurt OPERATIKG 'EVEkUE � FEWENTD4L 1,821.17.65 1,927,211.78 [OMhER3lAL 1,JJO'649.13 1 4,--�,3 4.4.�:, LARGE C061ERC14L 214443.55 254014.87 SALES TO PUDLlC NjTWITl[S 3700W 44061.23 . FbEi CURGE 119385.22 284.5R6.09 INT[�JEF��Th[�TAL 206317,il W45182 _______ ________ 7OTAL S�,LES 31835,3]3.64 KISC OyEBATING K[»ENbE 61599.50 58^43301 ^ hISCELLANETS RENTS Z2,174.55 21'395.54 ` 1TOD8Y RE:ERE 21.33O.0 22025.60 l�����YART��T6L �EVT 53013.O� 64,O7C�O . ---------------- TOTAL / OHRMlN} EYRNKS .' FuRAP6EO PW 2'911'833.48 2,965,847.57 � ]ISW]�UTJ3,N �"P[KATl.3TJS 342'222.S6 276141.59 CI'iTR{0UTDON �,AINlE�,�kCE 55,76158 60,345.96 .� CUSTJMER 4UDOlIhG & IdF8;,MATlSd 163.06.25 ]39,]45.44 A�'t'lNISiPATlU� & 6Ef�ER�L 421,199.58 49400183 �EP��ClATI6� 1?209232 17C357.86 ` OTHER OPER4TINS EXPE,%!SES 45.698.9&CR, 10`92UY � _____'_'_ ---------------- TOTAL 8FERATINS EXPENSES 4,051,629.71 4.273.766.1-4 ` _________ ------------------- NET OPEFATI,,�G FEYEt-UE 42.219.02CR 5-638.80CR ` 0THBREVENUE (EXPNS[) _ INTEREST I96#E 57,227.16 B8.092.08 GAIN/LOSS GN. DISPOSlTl3N OF PK8P£K7Y 3.629.66 .11)0 OTHER N5N-[P[F4TIK6 E�PEHSES .00 .00 INTEREST EXF[�S[ 108^537.27CR 121,146.26Ck _________ ------- NET RF;EOUE (LOSS), 89.9yY.47[R 129,773.26Ck ` ~ ``. ` ` ` ' ' ` + a � MME [hKR F.6.[. Fur JUh[ 30. 15,54 CxreA Lot YeR' Y-T-[ 4mouot Y-T-I, Amour! ASSETS ________ MITY PLAT 11.257.�'-�.07 7.214'35563 ` kESTXlO[0 09ER 5YSM WK[NEaT P9JJECT CERTIFICATE FAkhEHT FUND 242,811.03 246,1O4.16 ' &CQUISlTI]N [UN3 1.233.224.92 1.523.646./0 kL6ER�E [u�C/C�� lmT Fu�D 828,773.74 628.970M, [ACILOIES FEES 335'636.75 385.614.28 lFK S4O I[ INPFM�E�T ACCT 3Y.8I2.Ol 3O,131Ju �BT Rl')ER ST,P[ET D}ST 17311�7 16,953.�5 EQLFING ��G 745,724.23 �ECE�� F�R FJT��� ��TEPS 74].7J4.�6 725.��3.96 TPDE 0D@Ak WATER SYSTEM FVO 276,528.1O 231.943.14 PRf�Al9 CJAmLCTlS� FEES 67315.41 ` TELEAE7RY .0.u, 52.731.10- ' ---__—__—_ -------_------' ' ` TOTAL KESTRI[TEO FU�GS 4,937'178.04 5'362'766.04 ` 1111IRRENT A[6[TS GENERAL FUNDS .VO .C�3 &CC8UN7S NET 14135132 1i3,811.O6 . 0,E TO ELFCTFIC 669 4J4 64CK 16O 971 1�� ' . ' . MATERIALS AND SUPPLI[S 114003.25 112350.01 INTEREST lNL8rE GEC[IViABLE 43.32111 4Y,878.63 `. PREPAID EXP[�S[S 7506100 89,794.16 . -------- ---- TOTAL CUkRENT ISSElS 287.6*7.96CR Z26.4]3.F-16 ` ` FHELIMIm�KY KrRVEY CGSTS AND OTHER .0 699.73 - LNAMDkTlZEO ISSUE COSTS 422,27134 445^607.37 ---------- --------- lOTAL ASSETS 16,327,791.0Y 15'251.J42.30 ` ======== ' ~ i | , ' ' ` T [ E F F.U.[. WATfR SWKCE WET For Fe'iof EnAn; JUW 30' 1954 0 [arent Lsst Y»zr Y-T-D Aaouot Y-T-E Asmuxt Tf & Ll * 3ILlTIES _________ -----_ ___________ RETAl@E9 EARNlN3S 3'436'813.66 3,514,)f2.]4 DEFT 64rFR SAW I5ROV WECT LEASE 10.214 51 10.340.672.34 ni PEP 55 L8A-1, 1036.51171 32'?71.�6 LE46{/P&RCHASE EqUIPnENT 39563.52 Q121.24 --'------ -------- TOTAL UEB 11`950'984.14 1O,673.765.O4 C�:�ENT LIA0iI[IES A[[O6Nm PAN2LE, 352, 96.67 45341Y.85 C&SUMER DEPOSITS 42443.30 32101.26 WHO IKE0EH PAMLE 8102.45 5}.922.5D TFBI3 STANDBY FEES AC[KtEG 0MP�K��7I,5N � FE|'4TEE C6STS H'lR7.O5 39.O66.57 ------''-'- —'--'----- T0TAL CURRENT LIABILITIES 541.829.47 5D2.510.26 CCkST1 UN AC$A@CES 435.158.82 475,474.66 ________ 737AL ED�ITY &NO LIABILDI[S 5 2.30 ~ ` ' ' ' � WJ ]AMEShThElT For Feriod Fn JU@E J0, 1994 Cx/aot Kit Year Yl'G Anaoot \-T-G Amouot oHAQDK8KAM FEMENTlAL 955163.2Y 877'574.49 [8GERCIAL 12)'77l7] 112033.72 I9EKEPPRTMENTAL 381.53, 355.68 _________ ________ T0iAL Wk S4LES 1,117,121Y5 589.964.{9 H,DIANIS 27995.14 27586.32 MISC 6PERATIN5 RE'Y"ENLE 18,764.O5 1312517 rlSCELLAwE8�S REN7S 477.46 S10081 REVENUE 15072518 159,64000 --------- ---------' T1,DTPL FEVENUE 1014, O9.54 1^10, 94Ott FLMFlNE - PGWER P&FCHASED 219171.78 201112.44 ��S1�l3UllGN ��EGA7l��S 290363.05 274'509.70 �I6[G{8UTIOK �AI�lE0A�C[ 112.347.92 123000.13 MGM 4CC3JNTIOG & I9WTlGN' 45,333.13 52415.09 A5M,INSTkATl6N & 6EMERi-AL 250.182.52 233.768.64 3NTMEPARThENTAL RENT 53.51900 6437420 0EBRECI4T10 155138.02 155.250.48 OTHER CPE�AT]j3 E%PE�SES 2O452.76 105517V ---------------- 7OTAL DPMATI�'S EXPDJE 1,151,713.13 1,1*3.434.78 ------------- HET OPE�AllN8 RE�ENUE }6iGM6 47SO9.26 OTHER REVENUE (EXPENSE) ` lNTEREST lNC8h[ 117,B13.23 12343173 MIS[ELLAN[8LS NCN-OPEpATIN6 INCOME 'co .03 GA]N/LOS8 ON D}SP0SIT}GN OF �D?PERTY _ KISCElL0- ECCS INCO�E OEFOCTI8@S 13,196.1OCR .0} OTHER @UN-0P[RA7}�G EXPENSES .00 .D0 1ATERES7 EXPENSE 389.0122.74CV 341,878.O6CR EX79AORUI.ARY l#00ME .0O .00 ________ __________ i4ET RE;ENUE <L03S) 121.27'8.30[R 171^279.O2CR ' ` TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND June 31, 1994 History of Activity For Month Balance in General Fund 05/31/94 565,866.93 ------------------------- Receipts: Electric Revenue 548,187.92 Water Revenue 218,726.20 Misc. Billing Revenue- Electric 14,095.54 Misc. Billing Revenue-Water 1,174.79 Consumer Deposits- Electric 9,057.84 Consumer Deposits-Water 2,609.00 Customer Advances-Connection Fee- Electric 33,325.00 Customer Advances- Facilities Fees -Electric 8,400.00 Customer Advances-Other Electric 6,610,15 Customer Advances-Connection Fee-Water 19,350.00 Customer Advances- Facilities Fees-Water 1,333.00 Customer Advances-Other-Water 1,635.00 Misc. Revenue- Electric 141.24 Misc. Revenue-Water 187.77 Unrestricted Acquisition Funds M094-1171120 15,664.00 Refund State Compensation Ins 44,958.43 Insurance reimbursement repairs on Unit 23 529.86 DWR Prop 55 Loan#8 228,677.19 ------------------------- Total Receipts 1,154,562.93 Disbursements: Accounts Payable Disbursements 1,254,778.64 Less Void Checks Previous Period (13,030,07) Trans to Electric Restricted Funds Facilities Fee 8,400.00 Trans to Water Restricted Funds Facilities Fee 1,333.00 Total Disbursements 1,251,481.57 Balance in General Fund 06/30/94 468,948.29 Distribution of Non-Restricted Funds At Month-End: Petty Cash/Customer Services Operating Funds 600.00 Truckee River Bank General Fund (6,707,99) LAIF General Fund (Not Restricted) 475,056.28 -- --- .--------- 468,948.29 DWR Prop 55 Funds Requested 06124/94 $466,095.59 DWR Prop 55 Funds Requested 07125/94$274,351.19 ....... ........ ... _ .._.......... ........_ .__.......... .... ... ...... ....... Truckee Donner Pudic Utility District Board of Directors Joseph R.Aguera John L. Corbett Business Office Engineering Services Robert A.Jones (916)587-3896 (916) 587-3944 FAX(916) 587-5056 .tames A. Maass Patricia S.Sutton General Manager Peter L. Holzmeister July 29, 1994 MEMORANDUM TO: Peter L. Holzmeister, General Manager FROM: Mary Chapman, Office Manager SUBJECT: Investment report As of June 30, 1994, the District had the following investment comprised of the funds as detailed. INVESTMENTS YIELD AMOUNT LOCAL AGENCY INVESTMENT FUND 4.623% 5,691,383.82 ----------------- ELECTIC FUNDS GENERAL FUND 475,056.28 FACILITIES FEES-PRE AB1600* 207,861.76 FACILITIES FEES-POST AB1600* 56,205.15 STORM DAMAGE FUND* 199,379.80 BUILDING FUND" 887,287.56 ------------------------- TOTAL. ELECTRIC INVESTMENTS 1,825,790.55 WATER FUNDS FACILITIES FEES-PRE A61600* 621,384.91 FACILITIES FEES-POST AB1600* 214,251.84 BUILDING FUND* 650,830.13 RESERVE FOR FUTURE METERS 743,934.96 TAHOE DONNER WATER SYSTEM FUND* 276,528.10 WEST RIVER ST.ASSESSMENT DISTRICT BOND REDEMPTION FUND * 17,710.99 PREPAID CONNECTION FEES* 67,915.41 TSA(SAD II IMPROVEMENT) 39,812.01 ACQUISITION FUND 1,233,224.92 TOTAL WATER INVESTMENTS 3,865,593.27 TOTAL DISTRICT INVESTMENTS 5,691,383.82 ----------------- * RESTRICTED FOR SPECIFIC USE PER BOARD RESOLUTIONS Post Office Box 309 11570 Donner Pass Road Truckee, California 96160 Truckee Donner Public Utility District Board of Directors Joseph R.Aguera . John L.Corbett Business Office Engineering Services Robert A.Jones (916) 587-3896 (916)587-3944 FAX(916)587-5056 James A. Maass Patricia S. Sutton General Manager Peter L. Holzmeister Water Department Monthly ACtiVities Report August 10, 1994 July 1994 WATER QUALITY: See attached bacteriological report . Received second arsenic test results from the Tahoe Donner wells . Continued to collect data and organize the District ' s Cross Connection Control Program files . PUMP GPERATTGNS: See attached report from Pete Marcovich, Water Operations Specialist . MA-T NTENANCE, REPAIRS & NEW CONSTRUCTION: See attached report from Paul Rose, Water Dept . Foreman. WATER PLANNING DEPARTMENT: See attached report from Mike Connell, ;eater Dept . Planner. Post Office Box 309 ® 11570 Donner Pass Road • Truckee, California 96160 Truckee Donner Public Utility District Board of Directors Joseph R.Aguera John L. Corbett Business Office Engineering Services Robert A. Jones (916) 587-3896 (916) 587-3944 FAX (916) 587-5056 James A. Maass Patricia S. Sutton General Manager Peter L. Holzmeister MEMORANDUM Date: August 10 , 1994 From: David Rully To: Peter Holzmeister Subject : Monthly Bacteriological Report - July 1994 Attached is the " Summary of Bacteriological Water Quality" report for the month of July 1994 . The July portion of the report shows that all 36 distribution system samples were free of coliform bacteria . The report also shows that 29 of the 32 source samples were free of coliform bacteria. The district has met the State ' s drinking water standards for the month of July . Post Office Box 309 11570 Donner Pass Road Truckee, California 96160 . . .. .. ............................................................................... -.. TRUCKEE ER PUBLIC UTILITY DI TRTCT System Source Samples Portions Percent Samples Portions Percent Yr. /Month Collected Positive Positive Collected Positive Positive 1994 June (Truckee) 26 0 0 15 0 0 (Prosser) 7 0 0 8 0 0 (Hirschdale) 1 0 0 1 0 0 1994 July (Truckee) 28 0 0 23 3 13% (Prosser) 7 0 0 8 0 0 (Hirschdale) 1 0 0 1 0 0 Truckee Donner Public Utility District Board of Directors Joseph R.Aguera John L. Corbett Business Office Engineering Services Robert A.Jones (916)587-3896 (916)587-3944 FAX(916) 587-5056 James A. Maass Patricia S.Sutton General Manager MEMORANDUM Peter L.Holzmeister Date: August 10, 1994 To: Dave Rully From: Peter Marcovich Subject: Monthly Report for July 1994 WATER PRODUCTION GALLONS Airport Well . . . . . . . . . . . . . . . . . . . . 92, 378, 000 Northside Well. . . . . . . . . . . . . . . . . . . . 25, 204, 000 Prosser Heights Well . . . . . . . . . . . . . . . . 12, 263, 000 Sanders Well . . . . . . . . . . . . . . . . . . . . . 7, 485, 000 Donner Creek Well . . . . . . . . . . . . . . . . . . 22, 074, 000 TIA" Well . . . . . . . . . . . . . . . . . . . . . . . 5, 542, 300 "B" Well . . . . . . . . . . . . . . . . . . . . . . . 1, 445, 700 5outhside Well #tl . . . . . . . . . . . . . .. . . . . . 9, 197, 000 Hirschdale Well . . . . . . . . . . . . . . . . . . . . . 475, 800 TOTAL PRODUCTION FOR JULY 1994 . . . . . . . . . . . 176,064,800 SCADA UPDATE Installed an outside antenna on my house for better reception and transmission on the SCADA system. Continued discussions with Eric, Bill, Matt and Mirdaud from Sandel/Avery Engineering regarding programming and operational "bugs" within the system. These "bugs" are being eliminated. The SCADA system has been an outstanding asset, allowing us to monitor, override, balance and control the water system during this period of extreme demand. Frost Office Box 309 • 11570 Donner Pass Road Truckee, California 96160 WATER QUALITY Water samples were taken the four tuesdays of the month. Routine daily rounds were made taking chlorine residuals throughout the system. STATION MAINTENANCE Adjusted bowls on all four boosters at Southside Station and on the well pump at Sanders to increase gallons per minute . Pulled motor and pump from. Martiswoods estates for replacement . Set in new gasket in the Airport Well pump near the packing gland to repair large leak. Some screening of the drain/overflow lines on the water tanks was accomplished. There was also some screening of the cupola gents on the water tanks . STANDBY GENERATOR Installation has continued at several stations for the standby generator. I continue to coordinate system ,shut downs for installations at all sites . The contractor has not yet completed any stations that have been field inspected by staff. A "punch" list has been given to the contractor for work to this point . We have been briefed on the operation and have run several pumps in a few stations with the standby generator. PROSSER HEIGHTS/NO OTHER WAY The retaining walls at the tank site have been completed, including the safety railing. Installation of the hydro station pipe line has been completed and the installation of services has begun. The hydro station walls have been fully erected and we are awaiting the arrival of the tank and pumps prior to setting the roof. The well driller has been on site all month and has drilled the well to full depth. Testing is to begin the first week of August. ■r ckee Donner PublicUtility ty District Board of Directors Joseph R.Aguera John L.Corbett Business Office Engineering Services Robert A.Jones (916) 587-3896 (916) 587-3944 FAX(916) 587-5056 James A. Maass Patricia S.Sutton General Manager Peter L. Holzmeister MEMORANDUM Date : August 1.0, 1994 From: Mike . To : Dave Subject : Work Activities for July 1994 In addition to the everyday work related to customer complaints and questions, I worked on the following specific projects : 1 . Gooseneck Village 2 . McGinity Line Extension (High Street) 3 . Donner Lake Plaza 4 . Long Subdivision S . Coachland Expansion G . Truckee Diner 7 . Donner Village Condos 8 . Specter 5-Plex 9 . Airport Commercial. Center 10 . Simon Porter Building 11 . Pipeline Replacement (Sierra Meadows/Tahoe Donner) 12 . 1994 System Improvements 13 . Commercial. Service Upgrades 14 . Water Committee . 15 . Misc . easement work Post Office: Box 309 11570 Donner Pass Road • Truckee, California 96160 Truckee Donner Public Utility District Board of Directors Joseph R.Aguera John L. Corbett Business Office Engineering Services Robert A. ,tones (916) 587-3896 (916)587-3944 FAX (916)587-5056 .lames A. Maass Patricia S. Sutton General Manager MEMORANDUM Peter L. Holzeister Date: August 12 , 1994 To: Dave From: Paul Subject : Dept . work for July 19?4 The crews from Sears Construction have started work on the pipeline replacement work for Tahoe Donner. Greenleaf is near completion and they have started on Lausanne . We experienced three large after hours blowouts this month which caused our crews to respond immediately. The first was on Snowshoe Circle, we were able to do some valuing and shut it off immediately . The second was on a cross-country line between Schussing and Saint Bernard. This leak was running at a couple hundred gallons per minute. we were able to cap this one by one a .m. The third leak was at the Southside complex. The leak was on an eight inch line and was running at such a volume as to cause Sierre Meadows Tank to loose over ten feet in less than one hour. We had to cease all pumping to the tank to repair this leak as it was on the discharge line of the pumps . Sierra Meadows ran out of water for about two hours . However we were able to make repairs and resume pumping by six a .m. We had 22 new hookups this month and responded to about the same number of U. S .A. locates . We made 9 service upgrades also. There were 6 leaks repaired by our crews this month. I expect this number to increase for the month of August . Post Office Box 309 11570 Donner Pass Road Truckee, California 96160 pg• 2 our commercial service crew has continued to make good progress on the backlog of work.They are continuing their focus through August . We have been putting in a considerable amount of time after hours running and monitoring the pump system. The demand is huge . We have also responded to a number of water quality calls throughout the district . Service calls and complaints were also numerous . STAFF REPORT August 3, 1994 TO: Board of Directors From., Bob Quinn, Electric Supenntenden ,��>. Subject Electric Department July Report AGENDA ITEM July was a productive month for the Electric Department in that several projects were completed that had been started in preceding months. Additionally, work commenced to complete a development project and maintenance projects were completed within our substations. The following is a listing of projects undertaken by the department. Pole and line replacement in the Meadow Park area was completed. Pole and line replacement along East River St was completed. Work commenced on completing the Alder Hill Development project - an underground subdivision located between the Tahoe Donner and Prosser area. On July 2nd, a vehicle travelling south on Northwoods Blvd crossed the center line and the north lane and collided with our power pole. The pole was sheared off at ground level and at the telephone level approximately 25 feet above ground. The remaining facilities were suspended in air and only a momentary outage was experienced by the customers on that Tahoe Donner circuit. A crew was dispatched and a line truck was affixed to the damaged pole until repairs could proceed after the 4th of July holiday. On July vth, the line crew proceeded to replace the damaged pole and the project was completed on July 6th. On July 71h, some consumers in the Prosser Heights, Prosser Lakeview, and Pannonia Ranchos subdivisions experienced an outage. A transformer fuse opened as the result of a bird contact and the resulting fault current caused a connector to fail approximately I mile away. As the failed connector only effected I phase of the 3 phase line, only those customers whose transformer was connected to the de-energized phase experienced a loss of power. Power was restored to all customers in the area in approximately 2 hours. Bids were opened for the Martis #3 project and Harker& Harker was awarded the bid with construction to begin the second week of August Meetings were held with Southern Pack Railroad in conjunction with the Truckee Diner Restaurant planned for the comer of Hwy.267 and West River St The TDPUD electrician (Jim VvIlson) spent considerable time monitoring Zintek and finding numerous problems with the work being done for the Water Dept. contract 7 pages of work to be corrected has been reported to me at this time. Jim also held a class for the meter readers on basic electricity and safety. 3 air handlers were repaired by Jim in an effort to bring the upstairs temperatures in line. Vegetation eradication within the substations was completed. Fence and gate repairs were completed in Donner Lake, Tahoe Donner, and Truckee substations. At Martis substation, battery maintenance was completed Broken insulators within Truckee substation were repaired A recloser maintenance program was designed. After further review by the electrical engineer, the program will be implemented 2 linemen attended a week-long underground operations class in Reno. The service crew completed 46 new services and responded to 74 other types of service orders for a total of 120 service orders for the month of July. Routine maintenance on District poles and services was also perfom7ed by the service crew on an ongoing basis A few of the projects being planned for commencement or completion during August are as follows: The Martis #3 project The Truckee Diner commercial project The Tahoe Forest Hospital upgrade of facilities Wolfe Estates underground subdivision Alder Hill underground subdivision Truckee Airport upgrade of facilities Donner Plaza commercial development While the above list is by no means a complete listing of the District's planned development, it is a list of the most probable projects to be undertaken during this month. l look forward to reporting to you on those and other projects in next months staff report TRUCKEE-DONNER PUBLIC UTILITY DISTRICT PLANNING SERVICES DEPARTMENT ACTIVITIES July 1994 New Construction Development Agreements - Working with 16 new developments this year . Continuing to work on 20 developments carried over from the 1993 construction season . New construction work is getting very busy . New Construction Services - Completed the processing of 33 new applications for electric service and completed 24 permanent new construction services and 19 temporary power hook-ups . Completed orders for 22 water hook-ups and' 9 water service upgrades . Mork Order Processing- Water and electric standby charges have been finalized for the 1994-95 tax year . Continuing to close work orders as they become complete . A tremendous amount of new construction has greatly increased the work load . Communications Newsletter- The Fall issue of the Current Issues newsletter is now being drafted . The feature article will probably be on the activities of the Ground Source Neat Pump pilot project . End-Use Survey- NCPA has completed a draft of the residential survey findings . They are still in the process of completing the commercial end-use data compilation . The residential report is expected to be completed by the end of August and the commercial report by September-end . Once completed , Staff will review the report and evaluate the potential impacts natural gas service to Truckee may have on electric revenues . Conservation Ground Source Heat Pump Pilot Project- The GSHP Steering Committee has selected seven participants and two alternates for the pilot program . The areas represented include : Donner Lake , Tahoe-Donner , Prosser , Olympic Heights , and Sierra Meadows . CEC GSHP Collaborative- The California Energy Commission held its first Ground Source Meat Pump Collaborative in Truckee . The meeting heldJuly 28-29 , 1994 was a great success . There were about 40 in attendence including representatives from : California Energy Commission , Federal Department of Energy , Federal Environ- mental Protection Agency , Department of Water Resources , State Water Resources Control Board , Consortium for Energy Efficiency , ect . There were also local representatives including : Sierra Pacific Power Company , Plumas-Sierra Rural Electric Cooperative , Sacramento Municipal Utility District , Town of Truckee Building Dept . , Lahontan Water Quality Control Board , Squaw Valley Water District , contractors , ect . Building Energy Efficiency Workshop- On duly 30 TDPUD hosted a Building Energy Efficiency Workshop at the Chamber ' s new head - quarters , Pine Tree Plaza . The workshop was attended by members of the CEC GSHP Collaborative as well as the Community . There were 14 in attendence including four participants in the GSHP pilot project . GSHP Grant Funding- TDPUD and SMUD have received draft contract language from the California Energy Commission ( CEC) . The grant money will be used to implement the monitoring and evaluation of their perspective pilot programs . The Department of Energy ( DOE) has not made a decision as of yet to provide TDPUD and SCUD with $20 ,000 grant monies for the pilots . Energy Surveys /High Bill Assistance - We conducted 0 commercial , 4 residential energy surveys and provided on- site assistance to 2 customers regarding their concern over "higher" than normal energy bills . Energy Efficiency Partnership- Coordinating the development of the new Chamber site for the demonstration of energy and water efficiency . The incorporation of the energy and water efficiency measures are expected to be retrofitted into the building by year-end . The Chamber received the donation of a Ground Source Heat Pump unit at their new site . The heat exchanger( loop) still needs to be installed , planned for September . I have applied for $2 , 500 grant funding from the Bank of America . The funding was designated for environmentally- related projects ( see attached application ) . Energy/Water Showcase Program- TDPUD has applied to participate in the California Energy Commission ' s Water Energy Efficiency Showcase Program . If we are chosen to participate , TDPUD will be one of a few models of Water Dept , energy efficiency for Calif- ornia . For participating , the CEC would help us improve the energy efficiency of our water system above its current level through technical and other assistance . We would also receive recognition for our involvement . See attached for more information on the CEC Showcase Program . Employea Safet Training- Continuing research on the possibility of TDPUD doing its own comprehensive safety training program . Health & Exercise Program- Finalizing the program proposal . We have developed a health screening and measurement plan with the hel of Tahoe- Forest Health Promotions Staff , Janet Brady . We wil be submitting an application to our medical insurance com- pany regarding our proposed wellness program in order to receive a discount on TDPUD ' s medical insurance premiums of up to 6% . This could result in a cost savings of up to $15 , 000 to TDPUD . . T ENVIRONMENTAL GRANTS APPLICATION -SECTION 11 , FOR REQUEST TO BE -CONSIDERED, THIS FORM MUST BE COMPLETED AND SUBMITTED WITH APPLICATION. Name of Organization: Truckee Donner Public Utility District Amount Requested: $2,500 A. Statement of purpose of organization. Include the geographic area and population in the ftat ment. rUCKee Donner Public Utility District(TDPUD) is a public(non-profit) utility with primary responsibility for providing reliable , safe, low cost services relating to the electrical and water, needs of its customers . TDPUD' s service area is 44 square miles and includes Truckee with the exclusion of Glenshire. TDPUD has 8,000+ residential and business customers which translates into a o ulation served of approximately 20,000. The project described below which involves the Truckee Donner Chamber of Commerce would greatly expand this pro- ject' s influence. TDPUD is involved in establishing policies and programs that achieve cost-effective conservation and support the efficient use of energy and water resources . The goal of the District is to conduct its activ- ities in a manner which demonstrates a concern for effects on the environment. B. Describe the purpose for the grant funds requested. The purpose of the request for grant funds is to assist TDPUD in a partnership with the Truckee Donner Chamber. of Commerce to demonstrate water and energy efficiency measures in the new Chamber headquarters located at 12036 Donner Pass Road. The location/project is highly visible and is designed to involve many volunteer activities , primarily educational . The project expects to attract a culturally diverse group of people. This project is easy to replicate and is expected to provide long term benefits to the Truckee-Tahoe area. The request would be used to acquire energy and water conservation measures identified in the plan(see attached) that we could not acquire through project designed donations . C. State the environmental benefit to be achieved through use of these funds. The primary environmental benefit of this project is the reduction in the burning of fossil fuels at power plants achieved through the promotion of energy and water conservation measures . Fossil fuels burned at power plants usually include coal , oil , and natural gas . The resulting air pollution emissions may include carbon dioxide, sulfur dioxide. ect. The more customers/ consumers become aware of the cost-effective cost savings that can be achieved through energy and water conservation measures, the more we expect to see these measures incorporated into Truckee homes and businesses . Not only is there a reduction in power use and fossil fuel burning with energy conservation measures, but also the same affect occurs with less water -use resulting in less electrical pumping required to bring groundwater from Martis Valley to our customers. D. Total Project Budget: $ 2 500* * We anticipate this amount to be the portions of the energy and water effic- iency measures not acquired through donations and volunteerism. fASc aet7 a.aa �+ WATER-ENERGY-EFFICIENCY PROGRAM -- " - - CALIFORNIA ENERGY _. PL CAT ON FOR ENERGY SHOWCASES COMMISSION - WATER SUPPLY AGENCIES RETAIL OR WHOLESALE DOMESTIC WATER DISTRICTS OR MUNICIPALITIES Please print clearly and fill out as completely as possible. Return by August 1S, Name of Agency: 'Truckee Danner Public Utility District TDPUD Facility you wish to eater: Name: _TT)PT water Departmpnf Address: 11570 Don-ner Pass Road, Truckee, CA 96160 Contact person: Name: Scott Terrell. Title: Director of Planning Phone #: (916) 582--3931 Signature: C�z..-ter �t-,.---_-f Date: What utility provides your electricity? Truckee Donner Public Utility District What percentage of your water comes from: Groundwater 100 CA Surface water (including SWP, Colorado River, etc.) e % How many wells do you operate? R How many booster pumps do you operate? 48 How many storage reservoirs are in your system? 22 What is the Design Flow Rate of your: Treatment plant (MGD) OR Distribution system (CFSlday) What was your total flow for the past year or.twelve month period? What Was-the-totaTl'kWhs purchased for the same period? °-__ _.._-r (kWh} .. . .."�4 1R-1 i.j N:l:i�'i .4r.� -i• .f _ - -i ... .:JJ ems_, ' - _ -- „-.a - - Describe the efforts you have made to reduce your.electricity consumption/costs.{ - _ (i.e. pumping equipment, system controls & operation_practices, water conservation programs) bTDPIM recently egan o eration of itsnew SCADA system. When fullj operational, the e _.s stem will ive us the abilit to monitor and control pumping loads to-off-peak.hours. Our intere ener ,/water"efficiency, Describe the benefits that have been noted from each of the improvements above. (Le. Improved control of system, reduction in kW & kWh) Since we just began operation of the SCADA system, we do not currently have the infor- mation we need to evaluate its benefit to us. We anticipate labor and Kw demand sav- ing benefits from the system. Describe, if any, the problems you have encountered with the improvements above. v new we are currently unable to determine assoc- iated with the s stem. What future energy saving projects have you considered? We are aware of some cost savin benefits to us, but we assume there may be other e . We would like to pursue any, cost-effective cost saving o ortunities that v be available to us. We have hired an electrician with experience in imnrov- f ciencies. We will be investipating high efficiency pumps. We 'are also interested in-beginning a water conservation program that will lesult-in- reduced - electrical pMm in costs to us. We- have already began educating our customers on water saving opportunities through our newsletter and a drought-tolerant plant seminar. Describe your current process for monitoring and tracking electricity consumption. ,p. - We have^ n�the -past,relied on billing^ener y consumption data.', "With the new SCADA - system we will be able to track our power use Tmore .closely: . .............................................:......... Truckee Donner Public utility District Board of Directors Joseph R.Aguera John L. Corbett Business Office Engineering Services Robert A.Jones (916) 587-3896 (916) 587-3944 FAX (916) 587-5056 James A. Maass oil) Patricia S. Sutton General Manager Peter L. Holzmeister SUPPORT SERVICES STAFF REPORT - JULY KATHY NEUS BUILDINGS AND GROUNDS 1 . During the winter months we had opened a section of the back fence for snow removal. Staff removed the temporary fencing and reattached the original fencing, securing the fence properly. 2 . Assisted John Dyer in the location of the test bore holes by giving John copies of "as builts" for sewer, storm drains, water and electrical . 3 . I have spent numerous hours on the phone, and exchanging faxes in regards to the roof re--coating. I have communicated with Peter Madsen (the roofing contractor) , Dan Varvais (coating manufacturer rep. ) . and Steve Gamble (sales rep. ) . The three of them met at the P.U.D. to resolve the problem with the coating. The solution is to wash the roof with a mild solution, embed the peeling spots in the coating(so the coating adheres to itself) and then to put a light coating over the entire roof. This solution satisfies the building department also. All work and material will be at the expense of the coating manufacturer and the roofing contractor. I hope to see the work done in the next week or so. VEHICLES 1. The B. I .T. program was completed on Units #16 , #18 and #34 . 2 . Tom received the boom certificates for Units #10, #12 , #17 and #18 . The booms were inspected last month and no discrepancies were found. 3 . We also received a certificate from the Highway Patrol for two consecutive years of satisfactory rating for our B. I .T. program. Having a satisfactory rating means that there were no discrepancies (minor problems) or major problems (which result in a vehicle out-of-service violation) . Post Office Box 309 s 11570 Donner Pass Road Truckee, California 96160 PURCHASING AND WAREHOUSING ;I 1 . Due to a heavy demand and long lead times for Blackburn electrical parts, Joe Straub had to order material from different vendors to insure that material would be in- house for the highway 267 project. 2 . Joe Straub has been cleaning up the Martis Sub Station with Wayne Cummings . They have been removing old wire reels, miscellaneous material and trash. METER READERS 1 . The meter readers are staying current in their reading and no books were estimated for the month. 2 . The meter readers are still continuing their seal verification, and for the month of July they found the following: 2 cut or missing meter seals 11 cut or missing Ui0 seals 1 cut or missing commercial panel. seals 1 blank socket unsealed I have been reviewing job description by objectives with staff . I have also been preparing to do the 1995 budget. All in all it' s been quiet and nothing unexpected has affected staff. CALIFORNIA HIGHWAY PATROL 9 TRUCI�:EL- UBL DISTRICT 1157.. S RD Aid tpC 2 Conse we S � gs'. 99 1994 There is established i the Ca LW e :. Bien " 1 otor carrier safety compliance inspecng: ogre rcdcit�'d he C f is Highway Patrol. ti That program, kno s t , . t' f Te als (BIT) Program, requires all motor ca o ' . ocated in California to undergo an in on of ea ational to" al to rate their compliance with applica ws and' ations re t' g to motor carrier safety. This is to certify that this t 1 has achiev c�9 secutive satisfactory safety compliance ratings as in ch# ai abov California Highway Patrol congratulates this terminal on t io achievement and recognizes the commitment to highway safety demo " Irby the personnel responsible for the I operation of his terminal. 94M7 289 DEPAFi. OF CALIFORNIA HIGHWAY PATROL UL CHP 341(7.93)OPI O62