REGULAR MEETING
7 :00 F.M. , Monday, 12/16/91 General Manager
TDPUD Board Room Peter L.Holzmelster
A G E N D A
1. Call to order
2 . Roll call
3 . Election of officers
4 . Public input (7 : 25 PM or as soon thereafter as possible)
PUBLIC FEARING (7 : 30 PM or as soon thereafter as possible)
5. Consideration of an annual wage increase for the General
Manager; possible adoption of ordinance
UNFINISHED BUSINESS
6. Discussion of SCADA system alternatives; possible direction
NEW BUSINESS
7 . Tahoe Donner Pipeline Replacement Project:
a) Status report
b) Consideration of Change Order No. 3 on Contracts A,
B and C
c) Consideration of request to reduce retention
d) Consideration of claim by T & S Construction for
additional compensation for traffic control
e) Consideration of progress pay requests and invoices
8. Review of Proposition 55 program and possible authorization to
submit amended project list to California Department of Water
Resources
ROUTINE BUSINESS
9. Review of minutes of December 2 , 1991; possible action
10. Correspondence
11. Consideration of bills and possible approval
12 . Staff report
CLOSED SESSION
RETURN TO PUBLIC SESSION
ADJOURNMENT
NOTE - The complete packet of material relating to the agenda
is available for review at the PUD office and at the Truckee
,library.
Posted and made on
Post Office Box 309 0 11570 Donner Pass Road Truckee, California 96160
it TDPD
STAFF REPORT AGENDA
ITEM N0.
December 11, 1991
TO: Board of Directors
4! nral
FROM: Peter Holzmeister, Manager
SUBJECT: Bills for Board Approval
1. R.W. Beck, $341860
in the absence of a staff engineer Beck has been working with
Ron Reynolds on a number of tasks. The tasks included in this
invoice include converting the Donner Lake voltage, negotiating on
power supply issues with Sierra Pacific Power Co. and working with
NCPA on power supply.
2 . General Electric Co. 69 182 . 82
This invoice relates to repair of our Tahoe Donner substation
transformer. We are still working with the insurance company on
reimbursement of our costs.
3 . MBNA Holzmeister,__ $39 .92
T This credit card bill has two lunches on it, one with R.W.
Becks' engineer, in town to work on our master plan; the second
one is my attending the Downtown Merchants Association meeting to
talk about waterline replacement.
4 . Sauers En ineerin 5, 910. 00
This invoice covers several projects that Keith is helping us
with, including Proposition 55, Gateway tank, the Armstrong
pipeline, the Olympic Heights pipeline, the SCADA project,
snowmaking at the Tahoe Donner Ski Area, Gooseneck Ranch.
5. Tully Wihr, $3 , 247 . 96
Tully Wihr is the new name for Christiansen Business Forms.
This invoice is for billing envelopes with windows, and the return
envelopes that go in the bills.
g
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
BILLS FOR BOARD APPROVAL - DECEMBER 16, 1991
TOTAL ELECTRIC WATER DESCRIPTION
---------_--------___---_____________________..._____________-...._.._-__..____-----_--__-----_.._-----_-
R.W. BECK AND ASSOCIATES 3,418.60 3,418.60 CONSULTING SERVICES IN CONNECTION WITH DONNER LAKE
VOLTAGE COMPATIBILITY STUDY ( 1202.98) DISTRICT'S
ELECTRIC SYSTEM (313.78) SIERRA PACIFIC POWER
COMPANY (1901.84) .
GENERAL ELECTRIC COMPANY 69,182.86 69,182.86 TECHNICAL SERVICES FOR THE REPAIR OF 5000 KVA, SINGLE
PHASE, SUBSTATION TRANSFORMER--REMAINING 50% (12144.50)
TRANSFORMER REPAIR (57038.36) .
MBNA AMERICA BUSINESSCARD 39.92 16.59 23.33 PETER HOLZMEISTER-LUNCHES WITH DOWNTOWN MERCHANTS
ASSOCIATION (23.3.3) AND R.W. BECK-MASTER PLAN (16.59) .
SAVERS ENGINEERING INC. 5,910.00 5,910.00 PROFESSIONAL SERVICES AS FOLLOWS: HYDROLOGY STUDY (175.00)
GATEWAY TANK DESIGN (380.00) ARMSTRONG BOOSTER PIPE
(495.00) OLYMPIC HEIGHTS PIPELINE (1715.00) MISC REQSTS
AFTER ANDY (190.00) TELEMETRY REQ FOR PROP 91 (625.00)
TAHOE DONNER SNOWMAKING ( 170.00) TD PUMPS`I`ATIONS --
NORTHWOODS (480.00) FACILITIES FEES (1410.00) PROP 55 PRE
DWR AGREEMENT (180.0D) GOOSENECK RANCH (90.00) .
TULLY WIHR 3,247.96 2,273.57 974.39 BILLING ENVELOPE ( 1200.63) AND RETURN ENVELOPE (2047.33) .
_...______________-__----_------------
81,799.34 71,473.02 10,326.32
T D P
STAFF REPORT AGENDA
ITEM NO.
December 11, 1991
TO: Board of Directors
FROM: Peter Holzmeister, General manager
SUBJECT: staff Report
A Water quality report
Attached is the water quality report for November, 1991.
Everything was perfect during November.
B. Budget workshop
I will be trying to schedule a budget workshop. It may be
that we will be able to place it on the agenda of a regular
meeting, and keep the rest of the agenda to an absolute minimum.
That would allow all Directors to attend without imposing on their
schedules for a special meeting.
The water fund is still our challenge. There are some real
choices we can :Hake relating to programs, staffing levels, capital
improvements, equipment, and so on. If the Board takes the time to
discuss these issues with staff we will all be more secure in the
direction we are taking. There are also some alternative ways to
raise revenues that we should discuss to achieve the fairest
allocation of costs.
EO'D 0 E C 9119
Truckee r r Public Utilityist i t
iPost Office Box 309 s 11570 Donner Pass Rd. ® Truckee, California 95734
Customer Service (916) 587-3896 Engineering Department (916) 587-3944
MEMORANDUM
December 9, 1991
To: Peter L. Holzmeister, General Manager
From: Maria Chavez-Martinez, Engineering Services ,
Subject: Monthly Bacteriological Report - November 1991
Attached is the 1°Summary of Bacteriological Water Quality" report
for the month of November, 1991.
As you can see, the report shows that all of the 33 samples taken
within the District's distribution system were free of coliform
bacteria, and met the State's drinking water standards. In
addition all of the 21 samples taken at the District's sources were
also free of coliform bacteria.
mgcm
SUMMARY OF BACTERIOLOGICAL WATER QUALITY
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
System Source
Samples Portions Percent Samples Portions Percent
Yr. lMonth Collected Positive Positive Collected Positive Positive
1991
September,
(Truckee) 27 0 0 19 47 4%
(Prosser) 6 0 0 8 0 0
(Hirschdale) 1 0 0 1 0 0
October
(Truckee) 31 0 0 17 0 0
(Prosser) 6 0 0 9 0 0
(Hirschdale) 1 0 0 1 0 0
November
(Truckee) 26 0 0 12 0 0
(Prosser) 6 0 0 8 0 0
(Hirschdale) 1 0 0 1 0 0
7 Southside Well (4 tubes)
i 0 0
SUMMARY OF BACTERIOLOGICAL, WATER QUALITY
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
System Source
Samples Portions Percent Samples Portions Percent
Yr. /Month Collected Positive Positive Collected Positive Positive
1991
(Truckee) 20 0 0 8 24 55.-'
(Prosser) 8 0 0 7 0 0
(Hirschdale) 1 0 0 1 0 0
June
(Truckee) 20 0 0 15 25 2%
(Prosser) 7 0 0 8 0 0
(Hirschdale) 1 0 0 1 0 0
Juiy
(Truckee) 25 0 0 22 0 0
(Prosser) 10 0 0 10 0 0
(Hirschdale) 2 16 60 2 0 0
August
(Truckee) 21 0 0 21 0 0
(Prosser) 6 0 0 8 0 0
(Hirschdale) 1 0 0 1 0 0
k Northside Well (2 tubes)
5 Northside Well (2 tubes)
6 10793 Hirschdale Rd (1 tube)
9 0 i
SUMMARY OP BACTERIOLOGICAL WATER QUALITY
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
System Source
Samples Portions Percent Samples Portions Percent
Yr. /Month Collected Positive Positive Collected Positive Positive
1991
January
(Truckee) 20 0 0 8 41 10%
(Prosser) 8 2 S% 8 0 0
(Hirschdale) 1 0 0 1 0 0
February
(Truckee) 20 0 0 8 0 0
(Prosser) 8 0 0 8 0 0
(Hirschdale) 1 0 0 1 0 0
March
(Truckee) 20 0 0 7 0 0
(Prosser) 6 0 0 8 0 0
(Hirschdale) 2 0 0 2 0 0
April
(Truckee) 26 0 0 10 13 2 0
(Prosser) 8 0 0 10 0 0
(Hirschdale) 1 0 0 1 0 0
1 Northside Well (4 tubes)
z Kayhoe Court, Olympic Hts. (2 tubes)
3 Airport Well (1 tube)