Loading...
HomeMy WebLinkAboutSpecial Meeting Truckee Donner Public Utility District Post Office Box 309 • 11570 Donner Pass Road • Truckee, California 95734 (916) 587-3896 SPECIAL MEETING 4:30 P.M. - Thursday, July 9, 1987 Tahoe Truckee 'Unified School District Board Room Donner Pass Road, Truckee A G E N D A 1. Call to order 2. Roll call 3. New District complex - consideration and possible approval of change order authorizing roof modification 4. Adjournment C E R T I F I C A T I O N I hereby certify that the foregoing agenda has been posted in the District office and Government Center, provided to the U. S. Post Office and County Library for posting, and mailed to the Dir ctors and interested parties on July 7 , 1987. / Susan Macdonald, Deputy District Clerk �., SPECIAL MEETING July 9, 1987 The special meeting of the Board of Directors of the Truckee Donner Public Utility District was called to order by Vice President Sutton at 4:37 P.M. in the Tahoe Truckee Unified School District Board room. ROLL CALL: Directors Aguera , Cooley , Maass and Sutton were present. President Corbett was absent. CONSULTANTS PRESENT: Architect Dale Cox. EMPLOYEES PRESENT: Tom Buckhouse, Peter Holzmeister and Susan Macdonald. OTHERS PRESENT: Dan Angus was present in the audience. NEW DISTRICT COMPLEX - CONSIDERATION AND POSSIBLE APPROVAL OF CHANGE ORDER AUTHORIZING ROOF MODIFICATION Dale Cox explained that Value is proposing to apply two coats of Thermo Super Prep on the roof which has already been installed. This application has been tested by an independent testing lab and has passed the fire retardant Class B roof test for spread of flame and burning brand tests. The lab has not done an intermittent flame exposure test , but the laboratory director indicates that in all likelihood the roof assembly would pass this test for a Class B assembly also. In his letter of July 6 , �^ 1987 to the Building Department, Mr. Cox says he feels confident that the roof assembly will pass this third test, and notes he and the District are willing to take responsibility for the fire retardant roof assembly which has been proposed. Director Maass noted that the Uniform Building Code calls for a Class B roof. This was overlooked by the County in their review of the building plans. He moved that the Board approve the change order in the amount of $12,500 to upgrade the roof to a Class B; seconded by Director Cooley. Director Cooley stated he is thoroughly unhappy with Nevada County for overlooking the roof specifications in their plan check. Director Sutton noted the roof problem was called to the attention of Dale Cox in April, and she thought it should have been brought to the Board earlier. After some discussion, Mr. Cox was asked to amend the change order to show the credit for the original roof coating that was specified as well as that being approved. ROLL CALL vote to approve Change Order No. 9 to Value Builders in the amount of $12 ,500 for upgrading the roof over the warehouse and office to Class B as required by the County of Nevada: Corbett , absent; all other Directors, aye. SO MOVED. ADJOURNMENT There being no further business before the Board , Director Maass moved that the meeting be adjourned; seconded by Director Cooley. All Directors , aye, by voice vote. SO MOVED at 5:04 P.M. -1- TRUCIffE DONNER PUBLIC UTILITY DISTRICT WL-,x -/ . 64kk---7 AN Joh . Corbett, Ppesident Prepared by Susan Macdona d , Deputy District Clerk sm/d5b.20 r^ -2-