Loading...
HomeMy WebLinkAboutAgenda Truckee Donner Public Utility District Post Office Box 309 • 11570 Donner Pass Road • Truckee, California 95734 (916) 587-3896 REGULAR MEETING 7:00 P.M. - Monday, September 21, 1987 Tahoe Truckee Unified School District Board Roos Donner Pass Road, Truckee AGENDA 1. Call to order 2. Roll call 3. Approval of minutes a) August 17 , 1987; Board direction 4. Bills for approval 5. Manager's report - possible direction a) Sam Sperry letter re FmHA bond indenture 6. Public input 7. Correspondence 8. Committee reports UNFINISHED BUSINESS 1. Computer hardware and software - consideration and possible approval of �. agreements for acquisition of IBM hardware and OR COM Systems software 2. Acceptance of 1986 audit NEW BUSINESS I. Request from WestStar Cable Television 2. Approval and acceptance of: a) Tahoe Donner Substation paving project b) Airport Business Park water distribution system 3. Consideration of request by SPPCo to serve a customer under the fringe area agreement CLOSED SESSION - Discussion of legal and personnel matters RETURN TO PUBLIC SESSION - Possible direction resulting from closed session ADJOURNMENT C E R T I F I C A T I O N I hereby certify that the foregoing agenda has been posted in the District office and Government Center, provided to the U. S. Post Office and County Library for posting, and mailed to the Direc}prs and interested September 16, 1987. / parties on Susan Macdonald, Deputy District Clerk BILLS FOR BOARD APPROVAL September 21, 1987 Total Electric Water General Description A. B. CHANCE CO. 24,965.90 24,965.90 Padmount switchgear as per bid ATLAS CONTRACTORS, INC. 3,948.00 3,948.00 Contaminated soil removal, AC pad at Martis Valley Substation LARRY 0. PIERCE PAVING 1,238.40 1,238.40 Patch paving and trench, Ski Slope, Colombine, Blueberry LODI METAL TECH. 19,690.00 19,690.00 Racking system for warehouse as per bid SAUERS ENGINEERING INC. 1,000.00 1,000.00 Proposition 55- application SIERRA NEVADA CIVIL ENG. 1,970.00 1,970.00 Complex construction staking of parking lot UNISON 26,903.70 26,903.70 Initial drain, charge, & retro£ill five transformers VALLEY SLURRY SEAL 2,700.00 2,700.00 Slurry seal, 12' wide x 900' long asper_I�#d-QUOTES WEAVER EQUIPMENT 4,876.00 4,876.00 Rental of John Deere backhoe for month of 7/10/87 to 8/10/87 and 8/10/87 to 9/10/87 WEST WORLD 1,279.00 1,279.00 Eight ultracom speakerphones for new complex Total 88,571.00 77,477.60 9,814.40 1,279.00 t r� Truckee Donner Public Utility District Post Office Box 309 • 11570 Donner Pass Road • Truckee, California 95734 :A (916) 587-3896 MEMORANDUM September 18, 1987 To: Board of Directors %1 %)`�/' From: Peter L. Holzmeiste `J `��1� 6enefal Manager Subject: COMPUTER UPGRADE Attached for your review are the following items: I. Projected Cost of Computer System Upgrade 2. Financing Alternatives 3. Implementation Schedule Even though Amplicon has not confirmed their interest rate in writing, OrCom �^ has dealt with them and says they are a reliable firm. The change in prime rate has moved the Truckee River Bank variable rate to 8.75%. This makes Government Leasing Co. and Amplicon the most competitive. RECOMMENDATION I recommend that the Board authorize Paul Colburn and me to talk to Govern- ment Leasing and Amplicon and enter into an agreement with the firm which offers the best financing, after reviewing their lease agreements with Counsel Phelps. PLH/st PROJECTED COST OF COMPUTER SYSTEM UPGRADE Hardware: IBM System 36 $ 47,131 BDS Printer Boards 2,000 Communications 1,000 Operating System 6,668 Application Software 54,000 Utility billing, service orders, accounts payable, general ledger, payroll, materials inventory and purchase orders, work order accounting Sales tax on above 5,448 Cabling for new building 3,000 Out of pocket - travel, meals, data conversion 18,000 Total Acquisition Cost $137,247 Refinance Existing Computer Loan 34,000 $171,247 FINANCING ALTERNATIVES $170.000 Principal Interest Monthly Rate Payment Truckee River Bank Fixed Rate 11% Variable Rate* $3,696.21 Prime 8 3/4 3,508.33 Government Leasing Co. 8.4279 Colorado Springs, CO 3,434.00 Financing Alternatives Meadow Vista, CA 9.168 3,542.80 IBM Government Lease** 10.57 Amplicon*** Santa Ana, CA 8,4233 3,425.50 * only Truckee River Bank offered a variable rate ** IBM leases for hardware acquisition only *** Not confirmed in writing r IMPLEMENTATION SCHEDULE September 21 Request Board Approval September 23 Sign Contracts September 25 Begin Initial Conversion of Financial Data October 9 Delivery of System 36 October 15 Install Financial Packages October 15 Test Conversion of Utility Billing Files November 9 Initial Utility Billing Training January 6 Convert Utility Billing Files January 15 Mail First Bills