Loading...
HomeMy WebLinkAboutAgenda Truckee Donner Public Utility District Post Office Box 309 • 11570 Donner Pass Road • Truckee, California 95734 (916) 587-3896 REGULAR MEETING 7:00 P.M. - Tuesday, September 2, 1986* Tahoe Truckee Unified School District Board Room A G E N D A 1. Call to order 2. Roll call 3. Approval of minutes: a) May 19 , July 7 and 21 , 1986 b) July 14, 30, August 4 and 18, 1986; Board direction 4. Statement of general fund and bills for approval 5. Manager's report a) Budget calendar 6. Public input 7. Correspondence 8. Committee reports SPECIAL BUSINESS 1. Presentation of plaque to Bruce Grow for completion of 20 years of service with the TDPUD 2. Presentation of certificate to Mike Pimental for completion of Meter Technician program UNFINISHED BUSINESS 1. Consideration of water quality report and possible direction regarding installation of chlorination equipment 2. Consideration of amending standard TDPUD contract insurance limit provisions 3. Wells A and B - a) Review of letter from state b) Statement on year round use c) Possible award of bid for improvements and authorization to issue Contract Change Order No. 1 adjusting insurance limits d) Request of Value Builders to deposit securities in escrow in lieu of retention 4. New TDPUD complex: a) Status report and report on soils contamination b) Consideration of appointing Project Manager/Resident Inspector for new complex construction project c) Consideration of Pay Request No. 1 from Value Builders , Inc. NEW BUSINESS 1. Consideration of resolution authorizing execution of easement deed to Nevada County 2. Consideration and possible award of bid for Northside Chlorination project 3. Sale of 1.9 acre parcel - consideration of request to release deposit 4. Consideration of James Porter's request re rezoning and General Plan amendment for District property located on East River Street CLOSED SESSION - Discussion of legal and personnel matters RETURN TO PUBLIC SESSION - Possible direction resulting from closed session ADJOURNMENT C E R T I F I C A T I O N I hereby certify that the foregoing amended agenda has been posted in the District office and Government Center, provided to the U. S. Post Office and County Library for posting, and mailed to the Directo s and interested parties on August 27 , 1986. Susan M. Craig, Deputy Distric lerk s- Holzmeister recommended SEA Incorporated as they are able to do the entire job. Other firms and individuals would need the assistance of other consultants to perform specialized testing. Jack Giacomazzi and Luke Herman of Giacomazzi and Associates were present and discussed their proposal, the project inspection procedure and various tests that would be required. Director Hamilton moved, and Director Corbett seconded, that the Manager retain SEA Incorporated to work in conjunction with Dale Cox for inspection of the new building construction. Director Sutton stated there might be a conflict of interest created if the inspection team is also responsible for testing, and suggested the two functions be separated. ROLL CALL vote on the motion: Cooley, absent; Sutton, no; all other Directors , aye. SO MOVED. Consideration of Pay Request No. 2 fron Value Builders, Inc. Director Hamilton requested that the backup detail provided by Value Builders with their payment requests be copied to the Board for their information and review. The Chairman agreed that this should be done, and also asked that a recommendation regarding payment be provided along with the pay requests. Director Hamilton moved, and Director Corbett seconded, that Pay Request No. 2 from Value Builders in the amount of $74,993 be approved. ROLL CALL: Cooley, absent; Sutton, no; all other Directors, aye. SO MOVED. Request of Value Builders to deposit securities in escrow in lieu of retention Counsel Phelps advised that the contractor has the right_ to post securities with the District or escrow company in lieu of the District retaining 10% of payments made to the contractor. He noted that, as described in the Government Code , the securities are made payable to the bank and the bank is responsible for assuring that the securities are acceptable. The only risk to the District would be if there was a terrible drop in the securities. This is a minimal risk, however, since the securities are mainly government securities. The contractor would be responsible for all fees and charges involved in this procedure. Mr. Phelps went on to say that the District's only option is whether the PUD or the bank holds the securities. After some discussion, the Chairman asked that a provision pertaining to the 35 day lien period following acceptance of the project be included in the agreement. He put the matter over for consideration at the next regular meeting. CONSIDERATION OF WATER QUALITY REPORT AND POSSIBLE DIRECTION REGARDING INSTALLATION OF CHLORINATION EQUIPMENT -4- TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND- August 27 , 1986 Bank Balance - 7/29/86 $ 37 , 135 . 23 Electric Revenue 413 , 719 . 10 Water Revenue 90 , 624 . 18 Electric Connection Fees 13 , 550 . 00 Water Connection Fees 12 , 125 . 00 Facilities Fees 10 , 600 . 00 Miscellaneous Billing Revenue 155 . 81 Miscellaneous Revenue 2 , 106 . 59 Miscellaneous Work Orders 27 , 658 . 29 Standby 3, 070 . 03 Interest Earned SPPCo 6 , 991 . 95 Transfer from LAIF (wired ) 547 , 000 . 00 $ 1 , 164 , 736 . 18 Board Approved Billings 8/04/86 $ 39 , 633 . 64 8/18/86 44 , 934 . 22 Special Approval : Hall ' s Excavating 8/04/86 12 , 236. 70 Resource Development 8/04/86 5 , 530. 00 Joe Suter Construction 8/04/86 32 ,031 . 00 Frank B . Hall , Ins . 8/18/86 4 ,470 . 00 Joe Suter Construction 8/18/86 4 ,462 . 12 Hall Excavating 8/18/86 1 . 779 . 27 Hall Excavating 8/18/86 57 ,433 . 50 Sierra Pacific Power 341 , 295 . 97 Bills Paid Automatically ( see attached report) 162 ,451 . 09 Sub Total ( equals attached report ) 706 , 257 . 51 Truckee River Bank LAIF deposit 422 ,000 . 00 $ ( 1 , 128 , 257 . 51 ) Bank Balance 8/27/86 $ 36 ,478 . 67 Bills for Board Approval ( attached ) ( 171 , 569 . 35 ) Bank Balance after payment of above ( 135 , 090 . 68 ) LAIF transfer to cover above bills 136 , 000 . 00 Balance after LAIF transfer 909 . 32 Balance in LAIF and public time deposits after above transfer is $ 534 , 958. 13 is Water General Description 1 ,430 . 32 Telephone system down due to electrical storm in July 00 Tree trimming , easement clearing 2 , 210. 90 Pressure reducing valve , repair clamp 83 Acceptance fee and annual fee as trustee for non- profit corporation 96 1985 GMC cab and chassis , unit 17 25 Title policy for new building 50 Transformers ( three ) 10 Move office complex 00 Articulating aerial devise for unit 17 741 . 29 1 , 984 . 14 Telephone service 7/ 15/86 to 8/ 14/86 for office , telemetry , warehouse . trucks 2 , 768 . 50 Legal service , August 1986 1 , 516 . 79 Romac 8" rubbers , gaskets , barrel , taa saddle , repair clamp 00 Crane to unload and haul transformers 00 Complete oil & gas analysis for nine tran- sformers 16 Parts for units 7 , 16 , 1 7 , •, N 18 2 , 120 . 00 Rental of backhoe 8/ 15/86 to 9/ 15/86 c Water General Description 6 Penn Union ( sleeve Plug connector, trans- former for airport pump , chance assembly, bolts ( 11 invoices ) 6 100 amp cutout , square curved washers 9 Padmount arrestor , joslyn bolts , brackets , preforms deadend , surge arrestor 1 6 , 588 . 98 6 , 182 . 96 i