HomeMy WebLinkAboutAgenda (2) Truckee Donner Public Utility District
+ Post Office Box 309 • 11570 Donner Pass Road • Truckee, California 95734
(916) 587-3896
MEMORANDUM
February 22, 1984
To: Board of Directors
From: Water Committee
Subject: RECOMMENDED PROJECTS AND BUDGET ITEMS
The following are budget items and projects recommended for the Water Depart-
ment. They are listed generally in priority order, and should be completed
as the budget allows.
BUDGET ITEMS COSTS
1. Tamietti - return from leave of absence $16,126
2. Inspector 15,000
3. Compaction tester 6,000
4. Summer help - two college students 6,000
5. Replace Unit #19 with 1-ton w/boom and hydraulics 27,000
CAPITAL PROJECTS COSTS
1. Highway 267 relocations - because of turn-out for
Seniors, relocate 8" line $108,800
2. Purchase five fire hydrants 4,000
3. Downtown Truckee rebuild 251,100/minimum
496,500/complete
4. Obtain A & B Wells in Tahoe Donner
5. Sanders Well - add surge tank and telemetry so we
can use automatically rather than manually 6,000
6. Tank inspection and possible internal and external
painting _
7. Inlet-outlet at Sierra Meadows (bid once - R/W
problem) 35,000
MAS/smc