HomeMy WebLinkAboutResolution /!08' RESOLUTION NO. 84 64 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT APPROVING SPECIFICATIONS AND ISSUING A CALL FOR BIDS FOR TAHOE DONNER SUBSTATION IMPROVEMENTS WHEREAS, the Board of Directors of the Truckee Donner Public Utility District has determined the need to make grading, paving and grounding im- provements to the Tahoe Donner Substation; and WHEREAS, by motion passed at the September 17, 1984 meeting, the Board of Directors authorized R. W. Beck and Associates to prepare technical spec- ifications for the Tahoe Donner Substation improvements; NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Truckee Donner Public Utility District does hereby approve the technical specifications and drawing prepared by R. W. Beck and Associates for improvements to the Tahoe Donner Substation. BE IT FURTHER RESOLVED that the President of the Board is hereby directed to issue a call for bids based on the specifications attached hereto. The date and time established for the bid opening is Friday, October 26, 1984, at 4:00 P.M. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Pub- lic Utility District at a regular meeting thereof duly called and held in the District on the lst day of October 1984, by the following roll call vote: AYES: Cooley, Corbett, Duffy, Hamilton and Maass. NOES: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By G . 6hes A. Maass, President ATTEST: Susan M. Craig, Deputy Di rict Clerk \ Truckee Donner Public Utility District Al Post Office Box 309 • 11570 Donner Pass Road • Truckee, California 95734 (916) 587-3896 INVITATION TO BIDDERS TAHOE DONNER SUBSTATION IMPROVEMENTS October 5, 1984 NOTICE IS HEREBY GIVEN that the Board of Directors of the Truckee Donner Public Utility District will receive sealed proposals from bidders for grading, paving and grounding improvements to the Tahoe Donner Substation. Bids must be placed in an envelope clearly marked "Tahoe Donner Substation Improvements," and must be received at the District office prior to 4:00 P.M. on Friday, October 26, 1984, at which time they will be publicly open- ed and read. Copies of the contract documents may be obtained by contacting the District office at the address or telephone number above. Each bid shall be accompanied by a certified check payable to the order of the District or shall post a bond as security in the amount, form and subject to the conditions provided in the Information to Bidders. No bid may be with- drawn within 30 days after the actual date of the opening thereof. The bid will be awarded by the Board of Directors at the regular meeting of November 5, 1984. If the contract is let, all checks will be returned to the bidder except that of the successful bidder, which will be retained until a contract is entered into, and a bond to perform the work is furnished, with sureties satisfactory to the District, in an amount to be fixed by the District. If the successful bidder fails to enter into said contract in accordance with his bid and fur- nish such bond within five (5) days from the date on which he is notified that he is the successful bidder, said check or bid bond and the amount there- of will be forfeited to the District. The Truckee Donner Public Utility District specifically reserves the right to reject any and all bids, waive irregularities or informalities in any or all bids, be the sole judge of the suitability of the service offered, and to ac- cept any bid that it determines is the lowest responsible bid. JMP/s me A-1 I I INSTRUCTIONS TO BIDDERS Bids will be received by the Truckee Donner Public Utility District at the District office up until the hour of 4:00 P.M. , Friday, October 26, 1984. at which time they will be publicly opened and read. Each bid must be submitted in a sealed envelope clearly marked, TAHOE DONNER SUBSTATION IMPROVEMENTS. All bids must be made on the required bid form. All blank spaces for bid prices must be filled in, and the bid form must be fully completed and ex- ecuted when submitted. Only one copy of the bid form is required. The Truckee Donner Public Utility District may waive any informalities or minor defects or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be con- sidered. No bidder may withdraw a bid within 30 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the District and the bidder. Bidders must satisfy themselves of the accuracy of the estimated quantities In the bid schedule by examination of the site and a review of the specifi- cations, 3n^lud ing addenda. After bids have been submitted, the bidder shall not assert that there was a misunderstanding cone work or of the nature of the work to be done. ruing the quantities of The contract documents contain the provisions required for the construction of the project. Information obtained from an officer, agent, or employee of the District or any other person shall not affect the risks or obligations assumed by the contractor or relieve him from fulfilling any of the condi- tions of the contract. Each bid must be accompanied by a bid bond payable to the owner for ten per- cent of the total amount of the bid. As soon as the bid prices have been compared, the District will return the bonds of all except the three lowest responsible bidders. When the agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. The bid bond of the suc- cessful bidder will be retained until the payment bond and performance bond have been executed and approved, after which it will be returned. A certi- fied check may be used in lieu of a bid bond. bond A performance bond in the amount of 100Z of the contract price, and a payment Z of provednbyhe amount of the District. willbeerequiredtforithew contract. faiLhfulrperformattcetofathe `� B-1 �34 Attorneys-in-fact who sign bid bonds or payment bonds and performance bonds must file with each bond a certif iee and effective dated copy of their power of attorney. - The party to whom the contract is awarded will be required to execute the agreement and obtain the performance bond and payment bond within ten cal- endar days from the date when the notice of award is delivered to the bid- der. The notice of award shall be accompanied by the necessary agreement and bond forms. In case of failure of the bidder to execute the agreement, the District may at its option consider the bidder is default, in which case the bid bond accompanying the proposal shall become the property of the Dis- trict. The District, within ten days 'of receipt of acceptable performance bond, pay- ment bond and agreement signed by the party to whom the agreement was awarded, shall sign the agreement and return to such party an executed duplicate of the agreement. Should the District not execute the agreement within such period, the bidder may. by written notice. withdraw his signed agreement. Such notice Of withdrawal shall be effective upon receipt of the notice by the District. The notice to proceed shall be issued within ten days of the execution of the agreement by the District. Should there be reasons why the notice to proceed cannot be issued within such period. the time may be extended by mutual agree- ment between the District and contractor. If the notice to proceed has not been issued within the ten day period, or within the period mutually agreed upon, the contractor may terminate the agreement without further liability on the part of either party. The District may make such investigations as he deems necessary to determine the ability of the bidder to perform the work. and the bidder shall furnish to the District all such information and data for this purpose as the District may request. The District reserves the right to reject any bid if the evidence submitted byo or investigation of, such bidder fails to satisfy the District that such bidder is properly qualified to carry out the obligations of the agreement and to complete the work contemplated therein. A conditional or qualified bid will not be accepted. Award will be made to the lowest responsible bidder. All applicable laws. ordinances, and the rules and regulations of all auth- orities having jurisdiction over construction of the project shall apply to the contract throughout. thoroughly bidder fiamiliarresponsible for the contract documents. The failure reading of omission being of any bidder to do any of the foregoing shall in no way relieve any bidder from any obligation in respect to his bid. The low bidder shall supply the names and addresses of major material suppliers and subcontractors when requested to do so by the owner. B-2 BID FORM Proposal of (hereinafter called Bidder) organized and existing under the laws of the State of and doing business as (insert corporation, partnership, or individual, as applicable) to the TRUCKEE DONNER PUBLIC UTILITY DISTRICT, Post Off ice Box 309, Truckee, Cal- ifornia (hereinafter called District). Gentlemen: The bidder, in compliance with your invitation for bids for the construction of TAHOE DONNER SUBSTATION IMPROVEMENTS having examined the plans and specif ications with related documents and the site of the proposed work, and being familiar with all of the conditions sur- rounding the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials, and { supplies, and to construct the project in accordance with the contract docu- meuts, within the time set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work re- quired under the contract documents, of which this proposal is a part. Bidder acknowledges receipt of the follow addena: i Bidder agrees to perform all of the work described in the contract documents for the following prices: 1 • Site work: Grading $ Dollars and Cents Access road drainage $ Dollars and Cents C-1 Paving and surfacing $ Dollars and Cents 2. Electrical: Grounding Dollars and Cents TOTAL Dollars and Cents Amounts are to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern. The foregoing prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, taxes, fees, etc., to cover the fin- ished work of the several kinds called for. Bidder understands that the District reserves the right to reject any or all bids. The bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 calendar days after the scheduled bids. closing time for receiving Upon receipt of written notice of acceptance of this bid, bidder will execute the formal contract attached within five (5) days and deliver a surety bond or bonds as required in the Instructions to Bidders.ed in the sum of The bid security attach- dollars and Is to become the property of the District in the event theccontract and bond ) are not executed within the time above set forth pursuant to Public Contract Code Section 20206.8. Respectfully submitted: SEAL (If bid is by corporation) Signature Attest: Titl----------------------- Address C-2 Telephone number License number (if applicable) C-3 AGREEMENT This agreement, made this day of 1984. by and between the TRUCKEE DONNER PUBLIC UTILITY DISTRICT, hereinafter called "District" and doing business as hereinafter called "Contractor." WITNESSETH i That for and in consideration of the payments and agreements hereinafter men- tioned - 1. The contractor will commence and complete the a i } 2. The contractor will furnish all of the material, supplies, tools, 9 equipment, labor and other services necessary for the construction and completion of the project described herein. { 3. The contractor will commence the work required by the contract documents within 14 days after the date of the Notice to Proceed. and will complete the same within 30 calendar days unless the period for completion is extended otherwise by the contract documents. i 4. The contractor agrees to perform all of the work described in the contract documents and comply with the terms therein for the unit prices as shown in the bid schedule. S• The term "contract documents" means and includes the following; a) Notice to bidders b) Instructions to bidders c) Bid E-2 d) Bid bond e) Agreement f) Specifications and plans g) Supplemental conditions h) Payment bond 1) Performance bond J) Change order k) Progress pay estimate 1) Notice of award m) Notice to proceed a) Addenda: No. dated No. dated No. dated 6• This agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this agreement in duplicate, each of Which shall be deemed an original on the date first above written. SEAT. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Attest: By Peter L. Holzmeister, General Manager Post Office Box 309 Susan M. Craig Truckee, California 95734 CONTRACTOR SEAL By Address Attest: Phone E-2 TECHNICAL SPECIFICATIONS TAHOE-DONNER SUBSTATION IMPROVEMENTS FOR TRUCKEE-DONNER PUBLIC UTILITY DISTRICT TRUCKEE, CALIFORNIA I JJ� I ,I 9830A F-1 I� i ITEMS TO BE INCLUDED IN THE SPECIAL CONDITIONS LOCATION The construction to be performed under this Contract is located at the Tahoe-Donner Substation approximately 2 miles from the Truckee-Donner Public Utility District (Truckee-Donner PUD) office located at 11570 Don- ner Pass Road, Truckee, California. The Project site may be examined by bidders by arrangement with Mr. Peter Holzmeister, Manager of the Truckee-Donner PUD. CONTRACT DRAWING The Contract Drawing included in these Specifications is intended to pro- vide general information regarding the existing site. Dimensions of the existing fenced area and existing access road are approximate only. The Owner and the Engineer do not represent the Contract Drawing as showing completely or accurately all existing conditions and do not guarantee the correctness of any information. Bidders and the Contractor must assume all responsibility for obtaining necessary information to bid and con- struct the Work specified. i I 1 I I 9830A F-2 02110-1 DIVISION 2 SITE WORK SECTION 02110 -- SITE GRADING w_ .01 GENERAL A. The Work included in this section consists of site grading, pre- paration of subgrade, disposing of surplus material, and all other work incidental to the site grading within the limits of construc- tion shown on the Contract Drawing and of the access road at the Tahoe-Donner Substation. B. Disposal of any and all waste material shall conform to all local, State and Federal regulations. Waste or excess excavated material shall be hauled directly to a disposal site obtained and paid for by the Contractor. C. Prior to commencing any site grading operation, the Contractor shall notify the Owner. Damage resulting from the Contractor's operations to any existing structure or equipment shall be repaired by the Contractor at no expense to the Owner. D• The subgrade shall be considered to be that portion of the site surface upon which surfacing materials are to be placed. E. Finished grade shall be considered to be the finished surface of the completed facility. .02 MATERIALS Scarified surface material shall be clean and free of roots, brush, sticks, debris, lumps of clay, and other deleterious material. .03 CONSTRUCTION A. General 1. Site grading shall include the removal of on-site materials to establish the elevations indicated on the Contract Drawing. 2. The finished subgrade shall be true to grade and cross- section, hard, uniform, and smooth. 3. Grading shall produce uniform grades or slopes as indicated on the Contract Drawing. 9830A F-3 l to, 02110-2 DIVISION 2 -- SITE WORK SECTION 02110 -- SITE GRADING .03 CONSTRUCTION (continued) 4. Areas of construction activity shall be left in a condition Of uniform grade, blending into pre-existing contours and concealing as much as possible evidence of construction acti- vity by back dragging or raking to conceal tire marks. 5• Continued use of prepared subgrade for hauling which will cut or deform it from the true cross-section, will not be permit- ted. The Contractor shall, at no expense to the Owner, repair damage to subgrade caused by its operations. B. Preparation of Subgrade Upon completion of final grading, the subgrade shall be prepared by scarifying the top 8 inches and compacting as specified. Placement of surfacing material on the subgrade will not be allowed until approval of the subgrade has been obtained from the Owner. C. Compaction 1. Scarified surfaces shall be compacted using vibratory equip- ment. Compacting within 2 feet of existing foundations shall - be by handheld vibratory equipment. 2. The maximum density shall be as determined by ASTM D 1557, Method D. 3. Compaction of scarified surfaces shall be provided to the percentage of the maximum density as follows: Location 2 of Maximum Densit Under asphalt concrete pavement 95 All other areas 90 i 9830A F-4 02110-3 DIVISION 2 -- SITE WORK e: SECTION 02110 -- SITE GRADING .03 CONSTRUCTION (continued) 4. The Owner may obtain the services of an independent testing firm to make tests of the completed subgrade. The cost of these tests will be paid for by the Owner if the results are acceptable. The cost of these tests will be paid for by the Contractor if the results are not acceptable, and the mater- ials shall be recompacted until they do meet such tests. END OF SECTION 02110 9830A F-5 02220-1 DIVISION 2 -- SITE WORK SECTION 02220 -- ACCESS ROAD DRAINAGE .01 GENERAL A. The Work included in this section consists of constructing a ditch along the access road, furnishing and installing corrugated metal pipe culvert including trench excavating, backfilling, grading, compacting, and constructing quarry ,pall protection at the intake and outfall of the culvert. B. Work in this section shall be in accordance with the referenced sections of The State of California, Business and Transportatiaon Agency, Department of Transportation Standard Specifications, Janu- ary 1981 Edition, herein referred to as the Standard Specifica- tions. References to compensation in the Standard Specifications do not apply to this Contract. The word "Engineer" in the Standard Specifications shall mean 'Owner". .02 MATERIALS A. Backfill Backfill is considered to be material placed in excavation. Back- fill material shall be clean, free of wood waste, roots, brush, sticks, debris, junk, broken concrete, brick, lumps of clay, frozen material, and other deleterious material. Material passing the No. 200 sieve shall be non-plastic. B. Class A Backfill Class A backfill shall be native material obtained from the trench excavation and shall be free of rocks larger than 6 inches in the largest dimension. C. Class B Backfill Class B backfill shall be Class 2 Aggregate Base conforming to the requirements of Section 26-1.02B of the Standard Specifications, except that the maximum stone size shall be 3/4 inch. D. Quarry Spalls Quarry spalls shall be No. 3 Backing Rock Slope Protection conform- ing to the requirements of Section 72-2.02 of the Standard Specifi- cations. 9830A F-6 02220-2 DIVISION 2 -- SITE WORK SECTION 02220 -- ACCESS ROAD DRAINAGE - .02 MATERIALS (continued) E. Corrugated Metal Pipe Corrugated metal pipe shall be either corrugated steel pipe con- forming to the requirements of Section 66-3.02 of the Standard Specifications or corrugated aluminum pipe conforming to the requirements of Section 66-2.02 of the Standard Specifications. Corrugated steel pipe shall be galvanized, 16 gage. Corrugated aluminum pipe shall be 14 gage. .03 CONSTRUCTION A. Ditch A drainage ditch shall be constructed from the existing ditch along the south side of the access road to the culvert as indicated on the Contract Drawing. The ditch shall be constructed deep enough to allow positive drainage from the end of the existing ditch to the culvert invert. Minimum ditch depth shall be 3 feet. Side slopes shall be no steeper than 1.5 horizontal to 1.0 vertical. B. Trench Excavation 1. General Excavation of every description and of whatever substance encountered shall be performed to a depth and grade as required to provide positive drainage or as indicated on the Contract Drawing. It may be necessary to increase or decrease the quantity of excavation because of unknown fac- tors. 2. Trenches a. Unless otherwise indicated on the Contract Drawing, ex- cavation shall be open cut. During excavation, mater- ial suitable for backfill shall be stockpiled in an orderly manner, a distance back from the edges of the excavations specified by the governing safety agency. Materials unsuitable for backfilling shall be wasted as specified. Caution shall be exercised in operating heavy equipment over pipelines. Leaks or breaks caused by the Contractor's operations shall be immediately 9830A F-7 JOD 02220-3 DIVISION 2 -- SITE WORK SECTION 02220 -- ACCESS ROAD DRAINAGE .03 CONSTRUCTION (continued) repaired at no expense to the Owner and in a manner acceptable to the Owner. The banks of excavated areas shall be controlled as is necessary to prevent movement of soil in areas supporting existing foundations, slabs, pole lines, underground power or telephone cables, trees, pipelines, or other structures. If, as a result of the excavation or through fault or neglect of the Contractor, the earth or ground under or around such foundations, slabs, pole lines, underground power or telephone cables, trees, pipelines or other struc- tures, slips or is otherwise disturbed, corrective mea- sures shall be taken as directed by the Owner at no expense to the Owner. b. The bottom of the trench shall be excavated to a depth adequate to provide 6-inch minimum depth of Class B backfill as pipe bedding beneath the corrugated metal pipe. C. Backfilling 1. Bedding Class B backfill shall be placed from a depth of 6 inches below the invert of the pipe to the spring line of the pipe and compacted as specified. 2. Initial Backfill Class B backfill shall be placed from the spring line of the pipe to a distance 12 inches above the pipe and compacted as specified. 3. Subsequent Backfill Class A backfill shall be placed above the initial backfill to the required subgrade elevation and compacted as specified. D. Compaction 1. Compaction of all backfill materials shall be by vibratory equipment in uniform layers. Each layer shall be to at least 95% of the maximum dry density as determined by ASTM D 15579 Method D. 9830A F-8 v2oa 02220-4 DIVISION 2 -- SITE WORK SECTION 02220 -- ACCESS ROAD DRAINAGE .03 CONSTRUCTION (continued) 2. Trenches where settlement occurs shall be reopened to the depths necessary for compaction, then refilled and compacted, with the surface restored to grade. 3. Water settling or water jetting will not be allowed as a method of obtaining compaction. 4. The Owner may obtain the services of an independent testing firm to make density and other tests of the completed back- fill. The cost of these tests will be paid for by the Owner if the results are acceptable. The cost of these tests will be paid for by the Contractor if the results are not accept- able, and the materials shall be recompacted until they do meet such tests. E. Pipe Laying Pipe laying shall conform to the requirements of Section 66-1.05 of the Standard Specifications. F. Quarry Spalls A minimum of 1/2 cubic yard of quarry spalls shall be placed where indicated on the Contract Drawing in such a manner as to direct the flow of water into and out of the pipe and prevent scouring of the area adjacnet to the inlet and outlet. G. Cleanup 1. Surplus and unsuitable excavated materials, broken pavement, and rubbish, shall be removed from the site of the work as expeditiously as possible. Surplus and unsuitable excavated materials shall be loaded directly to waste; no stockpiling will be permitted. Disposal of waste materials shall conform to all laws, regulations, and ordinances and be disposed of at a site obtained by the Contractor. 2. Side ditches which have been affected by the Contractor's operations shall be cleared, drained through all points so affected; and if the area affected is extensive, the entire drain ditch shall be reformed. 9830A F-9 ads 02220-5 DIVISION 2 -- SITE WORK SECTION 02220 -- ACCESS ROAD DRAINAGE .03 CONSTRUCTION (continued) 3• Areas adjacent to the trench that are disturbed as the result of construction under this Contract shall be restored to their original condition. END OF SECTION 02220 I 1 i 9830A F-10 aa� 02500-1 DIVISION 2 -- SITE WORK SECTION 02500 -- PAVING AND SURFACING .01 GENERAL A. The Work included in this section consists of furnishing all sur- facing materials and all operations for the placement of crushed surfacing and bituminous concrete pavement. B. Work in this section and where required by the Contract Documents shall be in accordance with the referenced section of The State of California Business and Transportation Agency Department of Trans- portation Standard Specifications, January 1981 edition, herein referred to as the Standard Specifications. References to compen- sation in the Standard Specifications do not apply to this Con- tract. The word "Engineer" in the Standard Specifications shall mean Owner. C. The Contractor shall submit to the Owner certification stating that all materials are in compliance with these Specifications. .02 MATERIALS A. Gravel Base Gravel base shall meet the requirements of Section 25-1.02A, class 1 Aggregate Subbase, of the Standard Specifications. B. Crushed Rock Surfacing 1. Crushed rock surfacing shall be crushed stone or crushed gravel uniform in quality and free from wood, roots, bark and other extraneous material. Crushed rock surfacing shall in- clude not less than 75% by weight of particle with at least 1 fractured face produced by mechanical crushing. 2. Crushed rock surfacing shall meet the following gradation requirements: % Passing 1-1/2-inch square opening . . . . .. 100 X Passing 1-1/4-inch square opening . .. . .. 50-90 X Passing 3/4-inch square opening . . .. . ... 0 C. Crushed Surfacing Base Course Crushed surfacing base course shall meet the requirements of 26-1.02B, Class 2 aggregate base of the Standard Specifications, except that the maximum stone size shall be 1-1/2 inches. i 9830A ! F-11 02500-2 DIVISION 2 -- SITE WORK SECTION 02500 -- PAVING AND SURFACING .02 MATERIALS (continued) D. Crushed Surfacing Top Course Crushed surfacing top course shall meet the requirements of 26-1.02B, Class 2 aggregate base of the Standard Specifications, except that the maximum stone size shall be 3/4 inch. E. Asphalt Concrete Pavement Asphalt concrete pavement shall be Type B, meeting the requirements of Section 39-1 of the Standard Specifications. F. Soil Sterilization Soil sterilization compound shall be polyborchlorate as manufactur- ed by the U.S. Borax Company. .03 CONSTRUCTION A. General 1. The subgrade shall be prepared as specified in Section 02110 — SITE GRADING and approved by the Owner prior to any paving and surfacing. 2. Soil sterilization compound shall be applied to all previous- ly unpaved areas at a rate of 20 pounds per 1,000 square feet of surface. Polyborchlorate shall be mixed with water and applied prior to placement of crushed surfacing base course. Soil sterilization will not be permitted within 10 feet of drip line of existing trees and shrubbery. B. Compaction Gravel base, crushed surfacing base course, and crushed surfacing top course shall be compacted to the thickness shown on the Con- tract Drawing. Compaction shall be to at least 95% of maximum dry density, as determined by ASTM D 15579 Method D. C. Asphalt Concrete Pavement 1. Asphalt concrete pavement shall be compacted to the thickness shown. 9830A F-12 ago 02500-3 DIVISION 2 -- SITE WORK SECTION 02500 -- PAVING AND SURFACING .03 CONSTRUCTION (continued) 2. Construction methods shall be as specified in Section 39 of the Standard Specifications. 3. The edges of all existing asphalt pavements and all castings shall be painted with hot asphalt cement or asphalt emulsion immediately before placing the asphalt concrete material. The asphalt pavement shall then be placed, leveled, and com- pacted to conform to the lines, grade, and cross-section shown on the Contract Drawings. All joints between the new and original asphalt pavement shall be painted with hot asphalt or asphalt emulsion and be covered with dry paving sand before the asphalt solidifies. 4. If approved by the Owner, asphalt concrete pavement may be spread by use of a spreader box. The spreader box shall be capable of spreading the material in widths applicable to the specified typical section and thicknesses. The material shall be raked and screeded to the required evenness and tex- ture. The spreader box shall be operated at the forward speeds to provide continuous uninterrupted operation. D. Crushed Rock Surfacing Crushed rock surfacing shall be placed loose, in 1 layer, on the ` prepared subgrade and to the depth indicated. Spreading of the crushed rock surfacing shall be done with such equipment and in such a manner to ensure that the grading of material will be uni- form and that it will not be compacted. END OF SECTION 02500 9830A F-13 16450-1 DIVISION 16 -- ELECTRICAL SECTION 16450 -- GROUNDING .01 GENERAL A. The Work included in this section consists of furnishing and in- stalling a complete substation grounding system. B. The Contractor shall submit to the Owner a plan drawing showing the layout of the ground grid, locations of ground rods, connections to the existing fence and connections to structures and equipment. .02 MATERIALS A. The Contractor shall furnish all grounding materials including cable, connectors, fittings, clamps, ground rods, etc., necessary for a complete grounding system. B. Bare copper cable for grounding use shall be of concentric lay stranding and shall conform to the requirements of ASTM B 8-50, Class AA. C. Copper fittings for ground connections shall conform to the requirements of ASTM B 30. Bolts, U-Bolts, cap screws, nuts, and shakeproof lockwashers for copper fittings shall be of Monel, Ever- dur, or other corrosion-resisting material. D. Ground rods shall be of 8-foot length, 5/8-inch diameter, Joslyn J8338. E. Underground connections shall be made by the exothermic weld process, Cadweld. F. Exposed grounding connections shall be accomplished by using a suitable clamp, bolts, and fittings, or by exothermic weld process. "30A F-14 16450-2 DIVISION 16 -- ELECTRICAL SECTION 16450 -- GROUNDING .02 MATERIALS (continued) G. Miscellaneous fittings shall be as follows: Manufacturer Type/Cat. Description Gibbons VGE Connector for attachment to structures Gibbons VGL Terminal for attachment to equipment Anderson GC-110 Attachment to fence post Anderson GC-109 Attachment to gate post Anderson GB Flexible braid between gate post and gate frame Burndy Crimpit Miscellaneous above-ground connections H. Equivalent substitutes to the above specified items may be fur- nished subject to Owner approval. .03 CONSTRUCTION A. The Contractor shall install all necessary cables, ground rods, and connections for a complete grounding system. The grounding system shall provide for permanently and effectively grounding of all i metal structures and all frames of electrical equipment. B. Ground rods shall be installed vertically, the full length of the rod to the required depth. Where necessary the rods shall be in- stalled by drilling holes, placing the rods, and backfilling with suitable material. C. A 4/0 copper perimeter ground cable shall be installed 3-feet out- side the fence. A grid of 4/0 copper cable shall be installed throughout the fenced area, attaching each end of each grid wire to the perimeter cable. Grid wires shall be spaced 30 feet maximum and installed parallel to fence lines. The grid and perimeter cable shall be installed at a depth of 24 inches below finished grade. Grid wires shall be connected at all crossing points. 1 9830A F-15 ai6 16450-3 DIVISION 16 -- ELECTRICAL SECTION 16450 -- GROUNDING .03 CONSTRUCTION (continued) D. Alternate fence posts, corner fence posts, and gate posts shall be connected to the perimeter ground cable. A loop of underground ground cable shall be installed under the gate opening area extend- ing 10 feet outside the closed gate position. E. Ground rods shall be installed at each corner of the perimeter ground wire, at each gate post, and at intervals of 40 feet maximum along the perimeter ground wire surrounding the substation. A ground rod shall be installed adjacent to surge arresters and at intervals not to exceed 60 feet throughout the grid area within the substation. Jumper wires from the 4/0 copper ground grid to ground rods, fence posts, structures, and equipment shall be 2/0 copper minimum size. F. Electrical equipment, steel structures, and exposed metal surfaces shall be connected to the grounding system. Paint, scale, and enamel shall be removed from the points of contact on metal sur- faces before the ground connections are made. Underground connec- tions shall be made by the exothermically welded process. Exother- mic weld application tools shall be as recommended by the manufac- turer of the connectors. Connections to structures and equipment from the existing ground grid may be removed. G. The existing ground grid shall be abandoned in place or removed to facilitate construction. Any of the existing ground grid which remains after construction of the new grid shall be connected to the new ground grid at several locations as directed by the Owner. END OF SECTION 16450 983OA F-16 I ED4E OF SHOL ED4E OF 30 L.F 12,0 CMP CULVERT EX15T/NU l5 R(TYP) OF NEYV ROAD SOUTH/NVEQT SH4LL CE AT A60MLT EDGE OF EX/577/NG DITCH FLOW L/NE. 5LOPE l• 5UE6TA7*/ON YARD W/TN/N PAVEMENT - j5WF4CE0 ROAD ED Z%TO OUTFALC m L/MITS Of CONSTRUCT/ON UAQRY SPALLS -' -- - — _ TO BE SUQFACED WITH _ - b'MINIMUM DEPTH -g4GCE55 R' 10 CQU5HED ROCK 5URF4CW§ 040 L/MlT5 OF �- WITH NO COMPACTION. CON57?uCT/0N m 2 FINISH C7RADE ELEVATION OF CRU5HED ROCK �-•. �� �' 5UR94C/NG 5HALL 447CH EXI�HIN� ~' '— I ELEVAT/ON OF EX/5T/NC? A5PHAL'T CONCRETE PAVEMENT MATCH EDGE OUARRY� UROUND ALONG LlM/TS OF EX/57/N CONSTRUCT 354.F.t OF 5PALLS 4 OF CONSTRUCTION. P4VEMEN74 3'M/N.DEPTH DITCH 7I7 I 49ADE AREA W/TH/N PROVIDE P051rivE FLOW l8 UA EG l5,R(TYP) EX/STING LIMIT5 OF CON571RUGTION FKOM EXlST/Ny DITCH rT /B'GATE UNIFORMLY TO MATCH TO NEW CULVEIPT r I EX/5TiNy SLOPE. l`CRUSHED ROCK i 3•CENTERL/NE ELEVATION I I1 SURFACING OF ACCE55 ROAD SHALL 3'Nl/A/,COMPACTED DEPTH ti 1, Q SEE NOTE I. MATCH ELEVATION OF 45PHAL7'CONCRETE PAVEMENT CENTERLINE DF /21 I i EX157 7 ACCE55 ROAD. 5EE NOTE 3 3 ro 3 I I I i t m ACCE55 SOUTH ROAD 1,` Li L 5 0EH SLOP Fi E 10.0% /Fr. ,�— I 5L7—_ EXIS,T/Nfj I QROfESSIQ�,4 /- PREPARED Su84RADE ° �� I 10' ' /p' �----� CONCRETE 1/2 MIN.COMPACTED DEPTH i ------ FOUNDATIONS �v' C9U5HED.SU9F4C/N4 TOPCOURSE -------1 Z%Z'MIN.COAMCTED DEPTH I t I r1 r I 35793 CQU5HE0 5URFAC/NC? 845E COURSE IL' " LJ '�/� 6"MIN.COMPACTED DEPTH C�,PAVEL 845E TYP, 4CCE55 ROAD SECT/ON I �f`TOE OFEX1sTiNy EX/5T/NG I ` CUT SLOPE OF L/NK f OF CAUEO NO SCALE I FENCE � I SEE TYP, 4CCE55 ELEVAT/0N AND SLOPE P.W.BECK and ASSOCIATES RO40 5ECT/ON OF FIN15H 4BADE 5H4LL -- _ INOINHIf AND CONIUITANTI MATCH THAT OF L/MITS OF s/TE CON$TRucrZ Ex/5nn/y -�- TRUCKEE-DONNER PUBLIC UTILITY DISTRICT PQEPAREO COI HIV OEPTHCWSHEDiPOCK 5CALE:/"=20' "u" eAL"ORNII SUCCWAOE SuRFAC/N(�(UNCOMPACTEO) i TAHOE-DONNER SUBSTATION SECT/ON e REFERENCE SUBSTATION SITE NO SCALE IMPROVEMENTS i 1 N.A/C „ lrX� KK•1415-EP4-AK r w F-17 N SUPPLEMENTAL CONDITIONS PROJECT LOCATION The construction to be performed under this contract is located at the Tahoe Donner Substation, approximately two miles from the Truckee Donner Public Utility District office located at 11570 Donner Pass Road, Truckee, Califor- n1a. The project site may be examined by bidders by arrangement with Peter L. Holzmeister, General Manager of the District. CONTRACT DRAWING The contract drawing included in the specifications is intended to provide general information regarding the existing site. Dimensions of the existing fenced area and existing access road are approximate only. The District and the Engineer do not represent the contract drawing as showing completely or accurately all existing conditions and do not guarantee the correctness of any information. Bidders and the contractor must assume all responsibility for obtaining necessary information to bid and construct the work specified. USE OF THE SITE The site of the work is operational, and the contractor shall lay out and schedule the work, in all facets, so as not to unreasonably impair the ef- fective utilization of the substation. The contractor shall at all times be subject to and shall forthwith comply with any and all directives issued by the General Manager. Full compensation for furnishing all labor, materials, tools, equipment and Incidentals, and for doing all the work involved in conforming with the pro- visions of this article shall be considered as included in the contract prices paid for the various structures involved, and no additional compensation will be allowed. GUARANTEE Contractor shall guarantee all work done under the contract for a period of one year from the date of construction by way of a maintenance bond in form satisfactory to the District. COMPENSATION INSURANCE Contractor shall procure and shall maintain during the life of the contract, Workmen's Compensation Insurance for all of his employees to be engaged in work. In the case of any sublet work, the contractor shall require the sub- contractor similarly to provide Workmen's Compensation Insurance for all of the latter's employees to be engaged in such work unless such employees are covered by the protection afforded by the contractor's Workmen's Compensation Insurance. G-1 -:2Q Q PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE Contractor shall furnish satisfactory proof, by certificate presented to the District within 10 days of the date of the contract, that he has public Ila- bility and property damage insurance. The insurance shall protect both the contractor and the District, its officers and/or agents against loss from all liabilities imposed by law, and shall be maintained in full force and effect during the performance of the contract and in the following amounts: a) Limit of liability for personal injury or accidental death one person, $500,000, aggregate liability per accident, $1.000,000. b) Limit of liability for property damage - one occurrence, $50,000; aggregate liability for loss per accident, $100,000. SERVICE OF NOTICES All notices required to be given hereunder shall be mailed or delivered to the addresses shown under the District's and contractor's signatures at the end of the agreement. EXTRA WORK Any alteration or deviation from this contract involving extra costs will be executed only upon written Contract Change Order, and will become an extra charge over and above the bid amount. PAYMENT Due to the small size of the project and the anticipated speed with which the contractor will accomplish the work, only one progress payment will be made. The single payment will be authorized at the Board meeting next ing the completion of the work, and shall be in an amount not less than following of the lump sum bid amount. The Notice of Completion will also be filed at the above noted Board meeting. The final 10% shall be paid to the contractor 35 days after the recording of the Notice of Completion with the County, provided there are no outstanding obligations of the contractor at that time. G-2 PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS, THAT WHEREAS, the Truckee Donner public Utility District has, on > 19 awarded to hereafter designated as "principal," a contract for the construction of WHEREAS, said principal is required to furnish a bond . said contract, providing that if said connection and with tractors, shall fail to pay for any materials, or any of his other its pplies used in, upon, for, or about the performance ofptheiworkscontracted topbeidone, or for any work or labor done thereon of any kind, the surety of this bond will Pay the same to the extent hereinafter set forth: NOW, THEREFORE, WE, the principal and as surety, are held and firmly bound unto the Truckee al District, in the pen sum of Do ner Public Utility aoneY of the United States, for the Dollars (� made, awful we bind ourselves our heirs Payment of which sum will and trulylto be jointly and severally, firma b executors, administrators, and successors, Y y these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if said principal, his or its heirs, executors or administrators, successors or ass for any materials, provisions, or other supplies used In. upo iIns, shall fail to pay the performance of the work contracted to be done, or for anynworkr. or about thereon of any kind or for amount due under the Unemployment Insurance Act with respect to such work or labor, or for anya Pursuant to Section 18806 of the Revenue and Taxamtions Code due�of rthe State to be of Cal- ifornia with respect to such work or labor, as required by the provisions of Section 3225 and following of the Civil Code of the State of provided that the persons, companies so f California,urnishing said and , or corporations and ials, provisions, or other supplies, appliances, or power used, in, upon, for, or about the performance of the work contracted to be executed or performed, or any person who supplies both work and materials with the provisions of said thereto, shall have complied Civil Code, then said surety will Pay thor to an amount not exceeding the amount herein above set forth, andealsoewiIn ll Pay if case suit is brought upon this bond, such reasonable attorney's fees to the Truckee Donner Public Utility District as shall be fixed by court. shallThis bond arporationsentitled to fi-lebclaims under enefit Of ysaid Civil and alle so asand Code, co right of action to them or their assigns in any suit brought upon to give a this'bond. And the said surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition of the terms of or to the work to be performed thereunder or the specifications accompanying the same shall the contract In any way affect its obligations of this bond, and It does here- ofwaive notice of any change, extension of time, alteration, or addition to the H-1 c�s! terms of the contract or to the work or to the specifications. Said surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their seals this day of and corporate seal of each cor orateereto 19 the name pre- sents duly signed by its undersigned representative, pursuant affixed and these its governing body. pursuant to authority of i SEAL principal j Signature for principal a H _ Title of Signator SEAL Surety I i C Signature for Surety Title of Signator H-2 PERFORMANCE BOND KNOW ALL MEN By THESE PRESENTS, that, WHEREAS, the District Board of the Truckee Donner Public Utility District, has, on awarded to 19 hereinafter designated as the "Principal," a contract for the construction of and WHEREAS, said principal is required under the terms of said contract to furnish a bond for the faithful performance of said contract; now, therefore, we, the Principal, and unto the Truckee Donner Public Utility District surety, in the are f held and irmly bound penal sum of ($ lawful money of the United States, for the Dollars to be made, we bind ourselves, our heirs, executors. administrators sum 2and dsucces- sors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bounden principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and faithfully per- form the covenants, conditions, and agreements in the said contract and any alterations made as therein provided, on his or their part, to be kept and per- formed at the time and in the manner therein specified. and in all respects ac- cording to their true intent and meaning, and shall indemnify and save harmless, the Truckee Downer Public Utility District, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue and principal and surety, in the event suit is brought on this bond, will pay to the Truckee Donner Public Utility Dis- trict such reasonable attorneys fees as shall be fixed by the court. As a condition precedent to the satisfactory completion of the said contract, the above obligation in said amount shall hold good for a period of one year after the completion and acceptance of the said work, during which time if the above bounden principal, his or its heirs, executors, administrators, success- ors or assigns shall fail to make full, complete, and satisfactory repair and replacements or totally protect the said Truckee Donner Public Utility District from loss or damage made evident during said period of one year from the date Of acceptance of said work, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, the above obligation In the said sum shall remain in full force and effect. However, anything in this Paragraph to the contrary notwithstanding, the obligation of the surety hereunder shall continue so long as any obligation of the principal remains. And the said surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the contract or to the work to be �performed thereunder or the specifications accompanying the same shall, in any way, affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the contract or to the work or to the specifications. Said surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their seals this day of , 19 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representatives, pursuant to authority of its governing body. SEAL Principal t Signature for Principal 3 s Title of Signator SEAL Surety Signature for Surety Title of Signator y l 3y S f S I-2 D30 C O N T R A C T C H A N G E O R D E R Project Date Change Order No. Job No. To: Location You are hereby requested to comply with the following changes from the contract plans and �� specifications: ten Description of changes - quantities, units, Decrease in Increase in No, unit rice-, change ins completion schedule, etc_ contract prLce contract prtce 1 i :jr",; r cue in contract price due to this change order s Zo�Cal>ds+csas e 8 avcs�.i�s.aae s s astfesemce between Column (3) and (d) S '} Not. (increase) (decrease) in contract price S S The sum of $ is hereby added to, deducted from, the total contract price, s and the total adjusted contract price to date thereby is S # The tAms•provided for completion in the contract is unchanged, increased, decreased, by 1 calaadar days. This document shall become an amendment to the contract and all provisions of the contract will apply hereto. Accepted bys Date: (Contractor) Recommended bye Date: (Architect/Engineer Approved by: Date: (Owner) J-1 PROGRESS PAYMENT ESTIMATE PROJECT: CONTRACTOR: OWNU: ESTIMATE NO. DATE: ESTIMATE PERIOD: :- AL COMPLETION DATES ORIGINAL CONTRACT AMOUNT: aED COMPLETION DATES REVISED CONTRACT AMOUNT: ''0.` Contract items This period Total to date tea Descriptiaa Quantity Unit Unit price Quantity Amount Quantity Amount no. �a 0 -- 1 I - .: Amount Total to dtte ftwitdd bTt : Amount earned Date$ Amount retained AwoWNasded by: i Previous payments Date: Amount due Appgaved by: Estimated perosatsp of job!Mleteds Date: i Is contrdctor's ccnstructifla progress an schedule? ,_yes 40 o?�(v NOTICE OF AWARD Date: Project: The Board of Directors has considered the bid sma witted by you for the abase referenced project in response to the Notice to Bidders. You are hereby uaotified that your-i bid,bee-bomm..accepted_In=tbs aaomt of You the terms ofaM_���-• a f OIl0WI=i tasba-within ton days mn titbs-as�e of_ -pmcfara_the ' ,....- g "�ce3pt-of�this �oth�as- ,ry Ihweule•mud return both copies of the:-aBssemmet. You Mdli be pro- vided a-tally--mimed copy after it hoe-bees afiwd:by the District. 2. Submit a Performsacs Bond in the amount of = closed. ; format an- 3. Submit a Payment Bond in the amount of $closed. format en- 4- Provide Certificate of Insurance If you fail to execute said agreement or furnish the above-listed items within the sb�eaJLf l d t tan o consider icon tba alldate of r receipt of this notice. the District willabe of your bid to be a y ights arising out of the District's ac- Bid Bond. The District will be wed ned and to such othternrightsfastaae be of your ed by law. y grant- Peter L. Bolsaeister General Manager aw 9/26/84 L-1 o2a8' NOTICE TO PROCEED ' Date: i Projects You are hereby notified or before to commence wort on the above referenced project on , and fully complete all of the wor Your Completion date isk of said contract a is consecutive calendar days thereafter. _ The Dtstsyct_looka_forward to a_nutmally as isfac an thus tor7►'moskin8 relatiooahip _. Cemarai Poter e�er ---- i use 9/26/8b I I i i i I M-1