Loading...
HomeMy WebLinkAbout1981-12-28 Min - Board (3) its ORDINANCE NO. 8121 OF THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT CHANGING GS-2A AND GS-2B COMMERCIAL ELECTRIC RATES WHEREAS, as a result of its increased costs, the Board of Directors of the Truckee Donner Public Utility District has realized that it is essential to increase its electric rates; BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. Effective with the effective date of this Ordinance, the rate provisions of Ordinance No. 8110 and all other portions of prior ordinances and/or resolutions which are inconsistent with the provisions of this Ordinance are hereby repealed. BE IT FURTHER ENACTED that the following electric rates shall be charged to all large general service customers, being hereby established as Schedules GS-2A and GS-2B: Applicability To general service requirements within the District, including power and lighting taken at one point of delivery with more than 30 kilo- watts of demand. Character of Service Sixty-hertz alternating current. The District reserves the right to specify the voltage and phase of service supplied under this schedule. Monthly Rate (a) Connected load, 600 kVa or less: Demand charge: $6.00 per kW of billing demand, but not less than $180.00 Energy charge: 3.68(P per kWh. (b) Connected load, greater than 600 kVa: Customer charge $225.00 per bill Demand charge: $6.00 per kW of billing demand, but not less than $3,600.00 Energy charge: 3.684-* per kWh. Minimum charge, the greater of: (1) the current demand charge; (ii) 50% of the highest demand charge established in the preceding eleven months. Measured Demand The maximum measured 15 minute average kilowatt load during the billing period. If, at the discretion of the District, the cus- tomer's usage is intermittent or highly fluctuating, then a shorter time interval may be used. Billing Demand The greater of: 1. Current period's measured demand; 2. 50% of the highest billing demand established during the preceding eleven months; or 3. 50% of the contract demand. Primary Service Discount If, at the discretion of the District, service is supplied at the primary voltage available, the demand and energy charges of the applicable rate above shall be reduced by 2-1/2%. lit Primary Metering Discount If, at the discretion of the District, service is metered at the primary voltage available, the demand and energy charges of the applicable rate above shall be reduced by 2-1/2% Power Factor Adjustment The District, at its discretion, may adjust the energy and demand charges to correct for average power factors above or below 85%. Such adjustments will be made by increasing or decreasing the en- ergy and demand charges by 15% for each 1% or major fraction there- of by which the average power factor is greator or less than 85% lagging. Fuel Clause Adjustment Bills computer in accordance with the foregoing rates and charges are subject to adjustment for charges in the cost of fuel pursuant to Schedule FCA_ Terms of Agreement A contract will be required as a condition of service for not less than three years. Terms of Service Service under this schedule is subject to the District's Rules and Regulations for electric service. 10 � BE IT FURTHER ENACTED that the fuel clause adjustment as adopted in Ordinance No. 7702 on April 5, 1977, shall hereafter be added to and in- cluded in the monthly charge on all billings and shall not be stated there- in as a separate item. This Ordinance shall become effective thirty days from the date of adoption. The Clerk of the District shall immediately cause a copy of this Ordinance to be published once in the local newspaper and copies shall be posted in at least three public places within the District. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on the 28th day of Dec- ember, 1981, by the following roll call vote: AYES: Corbett, Huber, Kuttel, Monson and Maass. NOES: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By (/1 ames A. Maass, President ATTEST: "L, �, ���, Susan M. Craig, Depu District Clerk STATE OF CALIFORNIA ) COUNTY OF NEVADA ) The undersigned, Susan M. Craig, under penalty of perjury, certifies as follows: That for and on behalf of the Clerk of the Truckee Donner Public Utility District, I caused copies of Ordinance No. adopted by the Board of Directors of said District on /1�,��/�/ , to be posted within thirty days following adoption in£laces within said District, to wit: 1. Nevada County Government Center 2. Nevada County Library, Truckee Branch 3. United States Postal Service Office 4. Truckee Donner Public Utility District Said posting was completed on Executed on the day of Susan M. Craig, Deputy Distr4C,6t Clerk r